A freestanding pedestal basin looks simple on a drawing, but it is one of the few bathroom items where the quote has to carry plumbing information as well as product information. If you are specifying the Freestanding Pedestal Basin 1051S, Modern Ceramic Stand Basin for Bathroom for a villa, boutique hotel or apartment package, this guide sets out exactly what to send us so the quotation comes back complete the first time — and what we will confirm with you before production starts.

Why a stand basin needs a different enquiry than a vanity unit

The 1051S stands on its own pedestal and is fixed to the wall through its back panel, so there is no vanity cabinet to carry the basin or hide the pipework. That single decision changes what we need to price: the wall fixing detail, the waste and trap arrangement, the tap hole configuration and the way the basin meets the finished floor level all become part of the order rather than something resolved on site.

For project buyers this is actually good news. Once those items are agreed in writing, the same specification can be repeated across every guest bathroom or ensuite in a development without each installer improvising. That is how the 1051 collection is meant to work — one design language, repeated consistently.

What to include in your enquiry

Send the following and we can quote without a long back-and-forth. Anything you do not yet know, just say so — we will propose an option and price it.

  • Model and finish. Model 1051S, vitreous ceramic with glossy glaze. State the quantity per floor or per room type if the schedule is grouped that way.
  • Project type and location. Villa, boutique hotel, serviced apartment or public restroom. The building type drives packing, spare allocation and delivery planning more than anything else.
  • Drain and waste arrangement. Whether the waste exits through the wall or the floor, and the trap type you intend to use. This is the most common cause of a revised quote.
  • Wall construction at the fixing line. The basin fixes to the wall via its back panel, so we need to know whether that wall is masonry, stud with backing, or timber frame, and the finished floor level.
  • Tapware plan. The basin has a pre-drilled tap hole for a single lever faucet. Tell us if you are supplying taps separately or want them included in the same package.
  • Matching items from the 1051 suite. Quantities for the companion pieces, listed below, so everything arrives on one shipment.
  • Delivery terms. Destination port or site address, and whether you want door-to-door delivery handled by us or collection at a port you already use.

The 1051 suite: items you can quote in one request

Buyers usually order the stand basin as part of a matching set. Quoting the whole suite together keeps glaze tone, profile and trim consistent across rooms, and it saves freight because the items ship on the same packing list.

ItemModelWhere it goes
Freestanding Pedestal Basin 1051S1051SMain ensuites and guest bathrooms where a clean, sculptural basin is the focus
Wall Hung Ceramic Basin 1051B1051BCompact bathrooms and cloakrooms where floor space matters
Washdown One Piece Toilet 1051A1051AGuest WCs and hotel bathrooms; supports wall-drain and floor-drain layouts
Wall Hung Toilet 1051W1051WModern bathrooms with a concealed cistern, where the floor is left clear

If your drawings mix suites — for example 1051S in the master ensuite and 1051B in the powder room — send both schedules and we will price them as one order.

Details we confirm before production

The published product page lists the 1051S at 460×380×840 mm. Treat that as the reference dimension and not as a shop drawing: before production we re-confirm the overall size, the wall fixing positions and the plumbing rough-in against your current technical data sheet and the actual site conditions, because those numbers have to match what your plumber is setting out on the day.

Ask us for this in writing. Request a confirmed dimension and rough-in sheet for the 1051S before your first fix. It costs nothing, and it removes the most expensive category of bathroom rework — pipework set out to an assumed dimension.

Customisation: what can change on request

As a furniture and building materials manufacturer, we also handle custom and OEM work, so an enquiry does not have to stop at catalogue items. Tell us if you need:

  • A different quantity band or a phased delivery across several units in one development.
  • Bespoke finishes, textures or trim coordinated with the rest of your bathroom package — cabinetry, wall panels, lighting and flooring can all come from the same order book.
  • Your own branding on packaging or product marking for private-label programmes.

Custom work follows our normal route: brief and proposal, quotation with detail confirmation, then production, shipment and follow-up. The more complete your first enquiry, the shorter that loop is.

How to reach us

Send drawings, a room schedule or even a marked-up plan set to our team through the contact page, and we will come back with an itemised quotation covering the basins, matching suite items, packing and delivery to your destination. Contact PHILLIP on +86-13928214007 (phone or WhatsApp), or email santerson@qq.com. Business hours are Monday–Saturday, 8:00 AM–6:00 PM (GMT+8).

Quote request checklist

  • Model 1051S quantity by room type
  • Wall or floor waste, and trap type
  • Wall build-up at the fixing line and finished floor level
  • Tapware: supplied by you, or included
  • Matching 1051A / 1051B / 1051W quantities
  • Destination address and preferred delivery terms

Frequently asked questions

Does the 1051S need a vanity cabinet? No. The freestanding design fixes to the wall through its back panel and stands on its pedestal, which simplifies installation and avoids the cost of a cabinet.

Can I order one basin as a sample before committing to a full package? Yes. Say so in the enquiry and we will quote a sample separately from the project quantity, so you can check glaze tone and profile against your finishes board.

Will the basin match my other 1051 items? The 1051S, 1051B, 1051A and 1051W share the same soft rounded profile and glaze, which is why we recommend quoting them on one order rather than sourcing separately.

What if my site conditions are not finalised yet? Send what you have. We will quote against the current information and mark the open items — waste arrangement, rough-in, wall build-up — so your budget is usable while those details are settled.