Model 1051S freestanding stand basin, fixing to wall with back panel. Size 460×380×840mm, soft rounded minimalist outline, glossy ceramic, matches 1051 sanitary suite.
1051S freestanding pedestal basin features elegant soft rounded profile, a perfect choice for modern bathroom styling. Made of high-density vitreous ceramic with glossy glaze layer to guard against water stain and limescale.
The basin is fixed to wall via back panel to improve stability. Freestanding design does not require vanity cabinet, simplifying installation and saving space. Pre-drilled tap hole for single lever faucet.
It belongs to 1051 sanitary ware collection, paired with 1051A toilet,1051W wall toilet and 1051B wall basin for consistent bathroom decoration. Widely used in residential villas, boutique hotels and public restroom projects.