Washdown One Piece Toilet 1051A, Modern Ceramic WC for Hotel & Residential Bathroom

Washdown One Piece Toilet 1051A, Modern Ceramic WC for Hotel & Residential Bathroom

Description

Model 1051A modern washdown one-piece ceramic toilet. Dual rough-in options P-trap 180mm & S-trap 250mm. Soft rounded minimalist shape, stain-resistant glaze, great for home and hotel sanitary projects.

Description

The 1051A washdown one piece toilet adopts soft rounded modern minimalist silhouette to fit contemporary bathroom styles. Made of high-quality vitreous ceramic, dense glossy glaze prevents limescale, stains and yellowing for long-lasting clean appearance.

One-piece integrated structure eliminates gaps between tank and bowl, reducing bacteria and dirt accumulation. Washdown flushing delivers strong cleaning performance while keeping water consumption economical. It supports both wall drain P-trap and floor drain S-trap to adapt different pipeline layouts.

This toilet belongs to 1051 full sanitary suite, can coordinate with 1051W wall-hung toilet, 1051S stand basin and 1051B wall hung basin. Widely used in residential, villa, hotel and public restroom upgrade projects.


Features

  • - Model: 1051A Washdown one-piece toilet
  • - Dimension: 640×360×800 mm
  • - Two installation options: P-trap 180mm rough-in / S-trap 250mm rough-in
  • - Premium vitreous ceramic with high-gloss smooth glaze
  • - Anti-stain & anti-yellowing surface, easy daily cleaning
  • - Integrated seamless one-piece design, no dirt hidden gaps
  • - Powerful washdown flushing system, efficient and water-saving
  • - Optional soft-close toilet seat for quiet use
  • - Matches other items in 1051 sanitary ware suite
  • - Suitable for villa, apartment, hotel and commercial washroom renovation