Wall Hung Ceramic Basin 1051B, Modern Wall Mount Bathroom Sink

Wall Hung Ceramic Basin 1051B, Modern Wall Mount Bathroom Sink

Description

Model 1051B wall-hung ceramic basin, fixing to wall with back panel. Size 400×380×450mm, curved minimalist design, space-saving, suitable for home and hotel bathroom.

Description

1051B wall hung basin adopts gentle curved minimalist shape, bringing light visual sense to bathrooms. Crafted from durable vitreous ceramic, dense glossy glaze prevents water marks and limescale buildup.

Wall-mounted installation is secured by back panel, no cabinet required and maximizes floor space, convenient for cleaning underneath the sink. Tap hole reserved for single faucet installation.

This basin is part of the 1051 matching sanitary suite. Perfect for compact bathrooms, apartments, boutique hotels and villa bathroom renovation projects.


Features

  • - Model:1051B Wall-hung basin
  • - Dimension:400×380×450 mm
  • - Wall mounted, fixed to wall with back panel
  • - High-quality vitreous ceramic with smooth glossy glaze
  • - Anti-stain glaze surface, easy to wipe clean
  • - Curved trapezoid minimalist appearance
  • - Save floor space, light floating visual effect
  • - Pre-drilled hole for single tap installation
  • - Coordinates with all products in 1051 sanitary set
  • - Ideal for apartment, hotel, small bathroom renovation