A wall-hung basin looks simple on a drawing. It is one rectangle on a reflected ceiling plan, one symbol on a plumbing layout, one line in a bill of quantities. The problems appear later: basins delivered in three batches, tap holes that clash with the specified mixers, heights that differ between guest rooms and suites, and a wall-hung WC in the same room whose design language does not match the sink. This article walks through quantity planning and product coordination for the Wall Hung Ceramic Basin 1051B, a modern wall-mount bathroom sink, using the way we actually pack and ship these units on villa and hospitality projects.
Start from the room type, not the room count
Counting bathrooms is the fastest way to get a wrong quantity. Two identical-looking guest bathrooms in the same building can carry different packages: one with a wall-hung basin and a concealed cistern WC, another with a vanity unit because the client wants storage for towels and amenities. Before you count anything, define a small set of room types and give each type a fixed product package.
For a typical apartment or serviced-apartment scheme we usually see three or four packages:
- Primary bathroom — wall-hung basin plus wall-hung WC, often with a mirror cabinet and vanity lighting.
- Guest or powder room — the same wall-hung basin, frequently paired with a compact wall-hung WC where the soil stack allows it.
- Ensuite for staff, gym or common areas — the same basin family, sometimes swapped to a pedestal basin where pipework sits in the floor instead of the wall.
- Show-flat or public restroom — coordinated suite so the finish reads consistently to visitors.
Once room types are fixed, quantity becomes arithmetic: number of rooms of each type multiplied by the fixtures per type. Keep the mapping in one spreadsheet with a row per room type rather than per room, and every change of layout stays traceable.
Build the quantity list in layers
The basin itself is only the first line. Split the take-off into four layers so nothing gets forgotten at handover.
| Layer | What to count | Why it goes wrong when skipped |
|---|---|---|
| Layer 1 - Ceramics | Basins per room type, plus WCs and bidets in the same suite. | Mixed styles across floors; different glaze tones between batches. |
| Layer 2 - Wall-side items | Single-lever faucets, wastes and traps, concealed frames or brackets, shut-off valves. | Basins arrive but the fixing set does not, so rooms cannot be signed off. |
| Layer 3 - Adjacent finishes | Wall panels, tiling zones, mirror cabinets and vanity lighting above the basin. | Light fitting lands behind the tap, or a mirror clashes with the basin projection. |
| Layer 4 - Spares and breakage allowance | Extra pieces held on site for the same glaze and shape. | A chipped unit late in the programme means matching a new production run. |
We produce vitreous ceramic sanitaryware to order, so a project's whole requirement for one model is normally scheduled together and then split into shipment lots that match the site sequence. That is the practical reason to lock quantities before production starts rather than at delivery time.
Confirm the fixing method and the rough-in before you order
The 1051B fixes to the wall through a back panel, with a single pre-drilled tap hole for a one-lever mixer. Read that as three site conditions you must verify on drawings:
- The wall. A back-panel fix needs solid blocking or a framed substrate behind the fixing line. Stud partitions and tiled partition walls need this resolved in the first fix, not when the ceramic arrives.
- The waste. Confirm whether the trap exits into the wall or down the floor for each room type, and make sure the waste set ordered matches that route.
- The tap position. One tap hole means one mixer position per basin. Set-out has to agree with the spout projection of the chosen faucet and with the mirror above it.
The dimensions shown on our product page — 400 x 380 x 450 mm for this model — are catalogue figures. For tender documents and setting-out drawings we issue the current technical data sheet for the exact production batch, because rough-in heights and bracket positions must be checked against it. Ask us for that sheet before your first fix is signed off.
Coordinate within the 1051 suite
Coordination is where a project either looks designed or looks assembled. The 1051B belongs to a matched sanitary family, and every member shares the same curved outline and glaze, so a room can be specified from one series instead of three separate catalogues:
- Wall Hung Toilet 1051W — the wall-mounted WC for the same rooms, a compact footprint with a P-trap wall drain for concealed cistern installations.
- Washdown One Piece Toilet 1051A — the floor-standing option where the soil connection is a floor drain, with P-trap and S-trap rough-in choices.
- Freestanding Pedestal Basin 1051S — the floor-level alternative in the same design language, useful where a wall-hung fix is not possible.
This matters commercially as well as visually. One series across all room types means one glaze specification, one spare-parts list and one replacement route for the operator years later. Where a project needs vanity storage instead of exposed ceramic, our Single Vanity line is made to measure for the room, so basin height and cabinet width are set together rather than adjusted on site.
Wider coordination follows the same logic. Shower systems, mirror cabinets, vanity lighting, tiling and wall panels come from the same bathroom sanitary fixtures range we supply on villa and hotel fit-outs, so heights, finishes and delivery windows are agreed once instead of per subcontractor.
Sequence the delivery to the site programme
Ceramics are heavy, brittle and easy to damage in a busy store. Order them as lots that follow the construction sequence:
- First lot — enough basins, WCs and fixing sets for one prototype bathroom. Build it, walk it, sign it off.
- Main lots — released floor by floor or block by block, so nothing sits in storage for months.
- Final lot — spares and replacements for the handover period, plus any rooms that changed during construction.
We handle freight forwarding, export paperwork and door-to-door delivery on our side, so your receiving team needs only the lot numbers and the room-type mapping to put each crate in the right place. Keep one item number per room type on the packing list; it turns unloading into a checklist.
A short pre-order checklist
- Room types defined, with a fixed fixture package for each.
- Quantities taken from room types, not from a raw bathroom count.
- Technical data sheet for the production batch requested and used for setting-out.
- Wall blocking, waste route and single tap-hole position confirmed on coordinated drawings.
- Faucets, wastes, traps and fixing hardware listed as their own line items.
- Matching WC and, where needed, pedestal basin taken from the same 1051 series.
- Prototype bathroom agreed, then delivery lots tied to site phases.
- Spares allowance included for the same glaze and shape.
Send us your room schedule and the drawings for one typical bathroom and we will return a quantity breakdown by room type, a coordinated 1051 package, and the technical data sheet you need for setting-out — so the basins that arrive are the basins your site can install that week.
Talk to us about your bathroom schedule
SANTERSON supplies ceramic sanitaryware, vanities, lighting and interior fixtures for villa, hotel and residential projects, with custom sizing and door-to-door delivery. Contact PHILLIP on +86-13928214007 or santerson@qq.com, or use the contact page to send your room list.