A wall hung toilet looks simple on a drawing: a bowl floating above the tile, a plate on the wall, nothing you can trip over. The procurement behind it is not simple. The bowl has to match a carrier and a concealed cistern that your local plumber already stocks, the drain has to land where the waste pipe is, and the glaze has to survive years of hotel housekeeping. If you are sourcing under your own brand rather than buying a catalogue item, three more questions appear: what exactly can be changed, who signs off the sample, and how many units have to leave the factory for the price to make sense.

This article walks through OEM sourcing for our Wall Hung Toilet 1051W, Modern Wall Mounted Ceramic WC for Bathroom, step by step, using the same process we run for villa and hotel bathroom packages.

What OEM actually changes on this product

The moulded ceramic body of a wall hung pan is tooling-dependent. Redrawing the bowl means new tooling, new kiln scheduling and a new round of sample approval, and very few projects need it. What is genuinely open to change in an OEM order sits around the body:

  • Surface colour and finish beyond standard white, matched to a swatch or RAL reference you supply.
  • Seat and cover specification — soft-close thermoset, slim profile, quick-release fixing for cleaning crews.
  • Flushing plate finish and actuation style, coordinated with the rest of the bathroom ironmongery.
  • Marking: your logo or model code on the packaging, carton labelling and, where agreed, discreet marking on the ceramic underside.
  • Packaging format — individual retail cartons for a distributor, or project-packed cartons grouped by bathroom type for a site delivery.

Our Custom & OEM Service covers bespoke material and finish selection, brand customisation and private labelling, with flexible minimum order quantities. The honest constraint on ceramics is the kiln: colour and glaze variants run in batches, so an unusual finish costs more per piece at low volume than it does at container volume. Tell us the quantity early and we will tell you which of the options above are worth pursuing.

The specification sheet you should be checking line by line

The published page for the 1051W lists a compact pan of roughly 530 × 360 × 360 mm with a 180 mm P-trap wall outlet, designed to work with a concealed water tank system. Vitreous ceramic with a high-gloss glaze, and the same soft, rounded design language as the rest of the 1051 range — the Washdown One Piece Toilet 1051A, the Freestanding Pedestal Basin 1051S and the Wall Hung Ceramic Basin 1051B.

Two of those numbers decide whether the product installs cleanly or sits on site in a box. The first is the trap type and rough-in. A wall hung pan takes a wall outlet; if your waste is a floor outlet, you are specifying the wrong family and need something like a two-piece washdown with an S-trap option instead. The second is the cistern and carrier pairing. We supply the ceramic; the frame, concealed tank and flush plate are usually bought locally so that the plumber can source spare parts nearby. Confirm the carrier brand and model in your market before we quote, because seat fixings, water inlet position and plate cut-out geometry all hang off that choice.

Sizes and rough-in: verify against the current data sheet

  • The figures above come from the product page. Treat them as indicative until you have the technical drawing for the production batch in hand.
  • Ask us for dimensioned drawings with the inlet, waste centre and fixing-bolt centres marked, then check them against your carrier's installation manual — not the other way round.
  • Have your site team confirm finished wall build-up. A 180 mm wall outlet is measured from finished surface, and a thick tiled partition moves that number.

How the OEM order moves, stage by stage

1. Brief and product definition

You send drawings or a bathroom schedule; we come back with the model that fits, the carrier pairing questions, and the finish options available at your quantity. This is where most avoidable cost gets removed.

2. Quotation and detail confirmation

Unit price by quantity band, tooling or setup charges where they apply, packaging specification, carton markings, and the packing list you will need for customs clearance.

3. Sample approval

Nothing goes into mass production until a physical sample is signed off — glaze colour under your own bathroom lighting, seat action, plate finish, carton. Budget the time for one round of sample shipping and review in the programme; projects that skip it usually pay for it later.

4. Production and inspection

Kiln batches are checked for glaze consistency, and each unit is inspected before packing. For project orders we agree the inspection points with you in advance, including what a reject looks like on colour match.

5. Packing, freight and delivery

Ceramics travel in reinforced cartons with internal bracing, consolidated by bathroom type so that the crew unpacking on floor four is not hunting through mixed cartons. Our Logistics & Door-to-Door Delivery service covers freight forwarding, commercial invoices, packing lists and shipment tracking to site.

6. Installation support and after-sales

We stay reachable through fitting, snag resolution and spare parts — seats, fixings and plates are the parts that get replaced on a hotel floor years after handover. See Installation & After-sales Support.

Why projects put wall hung WCs in a package order

Very few buyers import a single toilet. The reason the 1051W appears in villa and boutique hotel orders is that it travels with everything else in the same fit-out: basins, shower systems, cabinetry, lighting, wall panelling and flooring from our Bathroom Sanitary Fixtures range and beyond. One purchase order, one consolidation, one set of customs paperwork, and one supplier who answers for the whole bathroom instead of pointing at someone else's carton.

That also changes how you should price the decision. A wall hung pan costs more installed than a floor-standing one — carrier, frame, reinforced partition, tiling around the plate. What you buy back is floor space in a small bathroom, an unobstructed floor that housekeeping can mop in one pass, and a look that reads as specified rather than standard. In a guest bathroom or a serviced apartment, those trade-offs usually justify the extra work; in a high-traffic family utility room, they often do not.

Five questions to ask any OEM ceramics supplier before you commit

  • Which carrier and cistern does this pan actually pair with? Get the answer in writing, with model names, not "fits all standard frames".
  • What is included in the price? Seat, fixing set, inlet connector and flush plate are frequently quoted separately.
  • What happens to breakage in transit? Agree the replacement route and who pays for it before the container moves.
  • Can you supply spares at the same colour after three years? Glaze batches drift; ask how the colour code is archived.
  • What is the real lead time including one sample round? Quote the calendar, not just production days.

Product dimensions and plumbing rough-in shown here are taken from the published product page. Request the current technical data sheet for your batch before ordering or issuing construction drawings.

Specifying wall hung WCs across a villa, apartment or hotel project? Send us your bathroom schedule and the carrier brand you use locally, and we will quote the 1051 range with the finish, branding and packaging your project needs — talk to PHILLIP on +86-13928214007 or email santerson@qq.com.