A freestanding pedestal basin looks simple on a drawing, yet it is one of the few bathroom fixtures where a missing dimension can force a variation order on site. Before you specify model 1051S for a villa, hotel guest room or public washroom package, here is the exact list of measurements and project inputs our production team needs to quote, produce and ship it correctly.

What 1051S Is, and Where It Usually Goes

1051S is a freestanding stand basin with a soft rounded profile and a high-density vitreous ceramic body finished with a glossy glaze that resists water staining and limescale. It stands on its own pedestal and fixes to the wall through a rear back panel, so no vanity cabinet or countertop is required. A single tap hole is provided for a single-lever faucet.

On our projects this type of basin is most often specified for villa powder rooms, boutique hotel guest washrooms, restaurant and office public restrooms — situations where a sculptural, free-standing look is wanted but a joinery package would add cost and construction time. 1051S also belongs to the 1051 sanitary suite, so it can be ordered alongside matching WC and wall-hung pieces when a project needs one consistent design language across several bathrooms.

The Measurements We Need From Your Drawings

The published outline of 1051S is 460 mm wide × 380 mm deep × 840 mm high. Those three numbers decide the footprint, but they are not enough on their own to place the piece. Send us the following with your enquiry so we can confirm fit before production:

  • Clear floor width and the wall behind it. The basin needs a clear standing area plus a solid or reinforced section of wall where the back panel is fixed; blockwork, brick and framed stud walls are handled differently.
  • Waste position: height off finished floor and distance from the wall. Tell us whether the waste exits into the wall or drops into the floor, and give the centre-line dimension.
  • Water supply positions — hot and cold outlets, their height and spacing, and whether they sit behind the pedestal or beside it.
  • Finished floor level and floor build-up, so the 840 mm overall height can be checked against your counter-height and mirror setting-out.
  • Door swing and traffic clearance, because a freestanding basin projects further into the room than a wall-hung one.
  • Faucet choice and spout reach, so the tap hole and the basin rim work together with no splashing.
Sizes shown on product pages are indicative. We confirm every dimension, waste position and rough-in against the current technical data sheet for your order before production starts — please treat published figures as a starting point, not as final site dimensions.

One further check that is easy to miss: 1051S has a single tap hole for a single-lever faucet. If your bathroom schedule calls for a widespread or wall-mounted mixer with separate spout and handles, tell us at enquiry stage — that fixture belongs to a different basin configuration in the same range, and changing it after production is not practical.

Project Inputs That Change the Quote

Beyond the physical dimensions, four pieces of project information determine how we package and price the order:

InputWhy it matters
Quantity and room scheduleOne sample basin and a 40-room bathroom package are packed, consolidated and shipped very differently.
Suite consistencyIf the same collection appears in guest WCs and powder rooms, we group matching items on one production run to keep glaze tone and profile consistent.
Destination and delivery termsThe port or site address, plus your preferred Incoterms, decide container loading, packaging strength and the freight plan.
Custom requirementsBespoke finishes, private labelling or non-standard packaging are handled through our custom and OEM service; tell us at enquiry stage, not after tooling.

How 1051S Compares With the Wall-Hung Option in the Same Suite

A frequent question from specifiers is whether to use a freestanding basin or the wall-mounted version of the same collection. The trade-off is practical rather than stylistic:

  • Floor space. A wall-hung basin such as 1051B keeps the floor clear and is the safer choice in tight guest WCs; 1051S occupies a defined footprint but needs no concealed cistern or heavy-duty frame.
  • Installation route. 1051S fixes to the wall through its back panel and stands on its pedestal, which shortens the wet-trade sequence in a renovation where opening the wall is not an option.
  • Cleaning and maintenance. Both glazes are dense and gloss-finished; the difference is that a wall-hung unit leaves the floor fully accessible for mopping.
  • Visual weight. A freestanding basin reads as a designed object in a larger room; a wall-hung one reads lighter in a small one.

Ordering Through Our Project Service

SANTERSON has manufactured furniture and building materials since 2008 and supplies sanitary ceramics alongside the rest of the fit-out package — interior fixtures, cabinetry, lighting, flooring and wall finishes — so bathroom ware can be consolidated with the joinery and loose furniture instead of being sourced from a separate vendor. Our project workflow runs through consultation, design and planning, production, logistics, installation support and after-sales, with freight arranged to site.

Send us your bathroom schedule

For a quotation, send the room layout, the waste and supply positions listed above, the number of rooms, and your destination port or site address. We will confirm dimensions against the technical data sheet, propose packing and consolidation, and return an itemised offer. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com.

Frequently Asked Questions

Can 1051S be installed on a stud wall? Yes, provided the fixing zone is reinforced or blocked to carry the back-panel fixings. Send us the wall construction detail and we will confirm the fixing method for your case.

Does it come with faucet and waste? The basin has a pre-drilled single tap hole; faucet and waste are usually specified separately so they can match the rest of the project's ironmongery. Tell us what you intend to use.

Can I order one piece first? Sample quantities for evaluation are possible; state your intended trial quantity in the enquiry so we can price packing and freight realistically.

Which traps does the matching WC accept? Trap options differ by model within the suite, so send us your drain layout — wall or floor, and the offset — and we will confirm which item in the 1051 range fits before quoting.