A wall hung basin looks simple on a drawing: one fixture, one waste connection, one tap hole. The differences between two similar sinks show up later, in the finish, the fixing detail, the cleaning of the floor beneath it and how well the piece matches the rest of the bathroom. If you are comparing our Wall Hung Ceramic Basin 1050WB, Luxury Gold Line Wall Mount Bathroom Sink for a villa, boutique hotel or apartment fit-out, here is the short list of what to check before you place an order.

Start with the shape and the size of the wall space

The 1050WB has a soft trapezoid outline with a thin gold line accent along the rim. That profile reads as decorative rather than purely utilitarian, so it works best where the basin is meant to be seen — a guest bathroom, a villa secondary bathroom, or a boutique hotel washroom where the finish sets the tone of the room.

Measure the wall width and the position of the waste before you confirm anything. A wall hung basin only looks right when it sits in proportion to the mirror, the tap and the door swing. If the wall is narrow or you want a more sculptural look, the tall format Wall Hung Ceramic Basin 1050WC stands vertically and becomes a feature piece; if you prefer something smaller and plainer, the Wall Hung Ceramic Basin 1051B is a compact curved alternative in the modern range.

Compare the body material and the glaze, not just the colour

Ask what the basin is actually made of and how the surface is finished. The 1050WB is produced in vitreous china with a smooth, dense glaze, which is what resists water staining, limescale and yellowing over years of use. In a project bathroom that gets cleaned daily by staff or used by many guests, this matters more than the shape.

  • Ask for the body material specification in writing, not just "ceramic".
  • Ask how the glaze covers the rear and underside of the basin, where moisture collects.
  • Ask what a sample looks like under your own lighting — gold accents change character between warm and cool light.

Check the fixing method and the tap hole before ordering

The 1050WB is fixed to the wall by its back panel, without a vanity cabinet underneath. That leaves the floor open, which makes mopping under the sink easy and keeps a small bathroom looking larger. It also means the wall build-up has to be right: confirm with your installer what carrier frame, bracket or reinforcement the wall needs, and where the water supply and waste will sit relative to the basin.

The faucet hole is pre-drilled for a single-lever tap. If your design calls for a different tap arrangement or a deck-mounted mixer on a side ledge, raise that at the enquiry stage rather than after production.

Buy it as part of a matched set when the project has several bathrooms

The 1050WB is one piece of the 1050 collection. It sits with the Washdown One Piece Toilet 1050A and the Freestanding Pedestal Basin 1050B, so a villa or hotel with mixed bathroom types can carry the same gold line detail through every room. Ordering the suite together keeps glaze tone, hardware finish and profile consistent, and it simplifies spare parts and future replacement.

Where a project needs a plainer look instead, our Wall Hung Basin 1038WB and Wall Hung Ceramic Basin 1004B cover the same space-saving wall mounted format without the decorative line.

Confirm the dimensions on the current technical sheet

The product page lists overall dimensions for this model. Treat any published figure as a reference and request the drawing for the batch you are buying, because dimensions on a listing page and on a production sheet can differ by a few millimetres — enough to affect tiling set-out and tap positions.

Item to confirmWhy it matters on site
Overall width, projection and height of the basinSets tile lines, mirror centring and clearance from the door
Waste outlet position and trap typeDetermines where the wall plumbing must be built
Back panel fixing detail and load ratingTells your installer what frame or reinforcement to prepare
Tap hole size and positionAvoids mismatch with the selected mixer tap
Packaging and protective packing for each unitCeramics travel better with individual moulded protection in a mixed container

Sort out quantity, spares and delivery at the enquiry stage

For project buyers, the commercial details decide whether a good-looking basin is also a practical purchase. Tell us the room count and the number of identical bathrooms, and we will quote against that rather than guess. We produce to order through our Custom & OEM Service, so finish and specification questions can be settled before production starts.

  • Order the full room set plus spares for high-traffic guest bathrooms, so a replacement matches the original glaze tone.
  • Group ceramics with the other fixtures in the same fit-out — vanities, showers, mirrors and lighting — so one shipment covers the wet areas.
  • Agree packaging and container loading plan up front; our Logistics & Door-to-Door Delivery service handles freight, paperwork and delivery coordination to site.
  • Confirm who installs on site. Our Installation & After-sales Support covers inspection and snag lists, and we can walk your contractor through the fixing detail for wall hung pieces.

If you are also fitting out the rest of the property, our Interior Fixtures range and Building & Construction Materials range let you source the surrounding finishes from the same supplier instead of managing several vendors.

A note on standards and compliance: local plumbing and building requirements differ by country and state. We supply the fixtures and the technical drawings your specifier needs; final approval against local codes remains with your project's engineer or certifier. Ask us for the documentation you need for your submission.

Before you sign off, this is what to have in hand

  • The technical drawing for the exact batch, with waste and tap positions marked.
  • A physical sample or at least a finish reference for the gold line under your lighting.
  • Written confirmation of the matched 1050 items you are ordering together.
  • A packing and delivery plan that suits the site, plus the spare quantity for future maintenance.

SANTERSON has manufactured furniture and building materials since 2008 and supplies project customers worldwide. Send us your bathroom schedule or drawings and we will quote the 1050WB Gold Line wall hung basin with the matching fixtures, packed and delivered for your project.