Wall Hung Ceramic Basin 1050WB, Luxury Gold Line Wall Mount Bathroom Sink

Wall Hung Ceramic Basin 1050WB, Luxury Gold Line Wall Mount Bathroom Sink

Description

Model 1050WB wall-hung basin with delicate gold line ornament. Size 495×440×390mm, fixed on wall by back panel. Trapezoid minimalist shape, space-saving luxury sink for bathroom.

Description

1050WB wall hung basin adopts soft trapezoid silhouette and exquisite gold line decoration, adding subtle luxury to bathroom. Made of durable vitreous china, the smooth glaze repels water stains and limescale, only needs simple wiping for daily maintenance.

Wall-mounted structure fixed by back panel, no cabinet needed. It leaves the floor open, making cleaning under the sink much easier and visually enlarging small bathroom space. Pre-drilled faucet hole for quick tap assembly.

This basin is a member of 1050 sanitary matching series. It pairs harmoniously with 1050A toilet, 1050B pedestal basin and 1050WC wall basin, widely used in boutique hotels, luxury apartments and villa secondary bathrooms.


Features

  • - Model:1050WB Wall-hung basin
  • - Dimension:495×440×390 mm
  • - Wall-mounted installation, fixed to wall with back panel
  • - High-quality vitreous ceramic material
  • - Soft trapezoid outline decorated with elegant gold line
  • - Glossy stain-proof glaze, easy to clean
  • - Floating wall-mounted style, free floor space
  • - Pre-drilled hole for single water faucet
  • - Matches the whole 1050 sanitary ware collection
  • - Great for compact luxury bathroom, hotel, apartment renovation