Model 1050B freestanding stand basin with stylish gold line accent. Size 460×360×850mm, fixed to wall by back panel. Elegant tapered shape, luxury ceramic basin matching 1050 sanitary series.
1050B freestanding pedestal basin features slim tapered body paired with refined gold line detail, creating an upscale visual for modern luxury bathrooms. Constructed from high-density vitreous ceramic with smooth glossy glaze, effectively resisting water spots and mineral buildup.
It is secured to the wall through back panel reinforcement for stable load-bearing. Freestanding structure eliminates the need for bathroom cabinet, simplifying installation and presenting a light artistic look. Reserved tap hole for single lever faucet installation.
This basin is part of the 1050 matched sanitary suite. Perfectly matches 1050A toilet, 1050WB and 1050WC wall hung basins. Popular for villa master bathroom, boutique hotel restrooms and commercial luxury washroom decoration.