A stone or marble feature wall looks finished the moment it is installed — but what you agreed with the factory is what you actually receive. Before an order for Stone & Marble Panels goes into production, buyers should lock down the finish details in writing: the surface treatment, the pattern direction, the joint allowance, the edge condition and the protection method. Those five items decide whether the wall reads as one continuous surface on site or as a set of separate boards.
Start From Where the Panel Is Going
Finish decisions follow location, not preference. In our catalogue the same stone and marble family is split by application: Stone & Marble Panels sit in the Custom Partitions & Paneling collection for residential bathroom projects, while the Paneling Systems version covers general wall system work. Countertops and vanity tops are handled separately under Stone & Marble Surfaces, because a horizontal surface near a basin is exposed to standing water, cosmetics and cleaning agents in a way a vertical wall never is.
Tell us the room, the exposure and the traffic level first. A wet-room wall, a hotel lobby column and a villa bedroom headboard wall each pull the specification in a different direction, and the drawings we produce for you should carry that information from day one.
The Six Finish Details to Confirm Before Production
| Detail | What to agree in writing | Why it matters on site |
|---|---|---|
| Surface treatment | Polished, honed, matte or textured; whether the chosen option is applied across the whole panel or only on visible faces. | Sheen changes how veining reads under site lighting. A polished face in a bright lobby will show every fixing and joint. |
| Pattern and vein direction | Book-matched, slip-matched or run in one direction; mark the orientation on the layout drawing. | Veining that runs the wrong way across an adjoining panel breaks the visual flow and cannot be corrected after cutting. |
| Movement and joint allowance | The gap you expect between panels, and whether joints are tight, shadow-gap or covered by a trim. | Wall lengths on site rarely match the drawing exactly. A planned joint absorbs that; an unplanned one becomes a field cut. |
| Edge condition | Square edge, eased edge, mitred external corner, and which edges receive it. | External corners and reveals are where poor edge preparation shows first. |
| Cut-outs and concealed fixings | Positions of sockets, mirrors, shower fittings and any concealed bracketing, shown on the shop drawing. | Cut-outs made on site with a hand tool chip the face. Cut them in the factory to the confirmed coordinates. |
| Protection and packing | Face film, edge protection, interlayer padding and crate orientation; plus panel numbering keyed to the layout drawing. | Damage is usually found after the container is opened. Numbered, faced panels let the installer place each piece without guessing. |
Made-to-Measure Sizing Means the Drawing Is the Contract
Our panel products are supplied made to measure, with material and finish options selected per project. That flexibility is the point of custom work, but it also means nothing ships on a standard size you can reorder later. Confirm the following against site-measured dimensions before we release production:
- The datum line the measurements are taken from, and who measured — us or your site team.
- Floor-to-ceiling height at several points on long walls, not one.
- Panel sizes as installed dimensions, with the joint allowance already deducted.
- Where a full panel starts and where the cut piece lands, so the narrow piece does not end up in the most visible corner.
- Which side of each panel is the face, and how panels are numbered against the layout.
Where Flexible Stone Cladding Changes the Checklist
Not every stone-look wall needs a slab, and this is where buyers most often specify the wrong product. For curved walls, arches, columns and cylindrical reception desks, rigid panels cannot wrap the geometry. Our flexible cladding starts a different checklist:
- MCM Flexible Travertine Stone Veneer — an ultra-thin, bendable sheet that reproduces the hole texture of natural travertine. It is fixed to a cement or gypsum base with tile adhesive and cut on site, and the product page lists weather resistance together with anti-freezing and anti-crack properties for outdoor use.
- Flexible Rock Stone Panel — a bendable mineral sheet with a rugged rock texture that can be rolled for shipping. The page states fire resistance and water and moisture resistance, and notes that custom surface painting is available.
- MCM Flexible Rammed Earth Panel — a modified clay flexible panel for rammed-earth looks, supplied in white and earth brown, suited to villa feature walls, restaurants and homestay renovation.
- Flexible Wood Grain Cement Wall Panel — cement-based sheets moulded with a wood grain face, supplied with a white raw surface you can paint on site.
With flexible sheets the finish conversation shifts. You confirm the base preparation and adhesive, the joint treatment between sheets, the colour range from stock, and whether a custom surface colour is required. Sample boards in the actual colour travel better than photographs, and we can send them before you commit.
Match the Panel to the Rest of the Fit-Out
Stone rarely arrives alone on a project. When the same order carries Wall Panel Systems, joinery, vanities or basins, ask us to coordinate the finish schedule across those items at once: skirting and architrave material against the panel edge, the countertop upstand against the wall face, and the reveal where a panel meets a cabinet run. Coordinating these in one production round is cheaper than reconciling them with sealant on site.
Before you sign off: request the shop drawing at installed size, ask for a physical sample of the exact finish rather than a catalogue image, and keep one spare panel per type in the shipment. Panels get damaged during installation more often than during transit.
A Short Pre-Order Checklist
- Room, exposure and traffic level confirmed with the factory.
- Surface treatment and sheen selected, and shown on the drawing.
- Vein direction and matching method marked panel by panel.
- Joint width and joint type agreed; layout shows where cut pieces fall.
- Edge condition specified for external corners and reveals.
- Cut-out coordinates fixed on the shop drawing, not left to site.
- Panel numbering, face protection and crate method confirmed.
- Spares ordered with the main quantity.
Send us the drawings, the room list and the finish schedule you already have, and we will return shop drawings for each wall before production starts. As a China-based manufacturer of furniture and building materials working on villa, hotel and office projects, SANTERSON handles the panel specification alongside the joinery, surfaces and fixtures around it, so finish details are agreed once rather than re-litigated by three different suppliers.