Flexible wood grain cement wall panel is a bendable mineral decorative sheet, with realistic natural wood grain texture on surface. It is lightweight, fireproof, water-resistant and flexible, can be rolled and transported. Widely used for interior & exterior wall cladding, renovation projects, curved wall decoration.
This flexible wood grain cement panel is a new type of mineral decorative wall sheet. The surface is molded with lifelike wood grain patterns, visually close to real timber, while retaining the advantages of cement-based material.
The product features outstanding flexibility. It can be rolled up for packaging and delivery, greatly saving logistics cost. It can fit curved walls, arches and special-shaped structures, which solves the limitation of rigid traditional wall boards.
Fire Safety: Non-combustible material, meets fire rating requirements for construction.
Water & Moisture Resistance: Suitable for wet areas, no swelling or deformation.
Light Weight: Reduce load bearing pressure of building structure.
Easy Processing: Can be cut, drilled, bent on site.
Surface Treatment: White raw surface, customers can paint any color as needed.
Interior wall decoration, exterior facade cladding, old building renovation, curved wall, background wall, commercial space, hotel, exhibition hall, villa project.