MCM Flexible Travertine Stone Veneer | Bendable Soft Stone for Interior & Exterior Wall Cladding
MCM Flexible Travertine Stone Veneer | Bendable Soft Stone for Interior & Exterior Wall Cladding
MCM Flexible Travertine Stone Veneer | Bendable Soft Stone for Interior & Exterior Wall Cladding
MCM Flexible Travertine Stone Veneer | Bendable Soft Stone for Interior & Exterior Wall Cladding

MCM Flexible Travertine Stone Veneer | Bendable Soft Stone for Interior & Exterior Wall Cladding

Description

MCM flexible travertine stone veneer is ultra-thin, lightweight and bendable. It perfectly imitates natural travertine texture, ideal for curved walls, hotel, villa and commercial wall renovation. Multiple colors in stock, free samples available.

Description

MCM Flexible Travertine Stone Veneer

Our MCM flexible travertine stone is a new generation soft stone material, replicating the natural hole texture of original travertine stone. Different from heavy natural stone, this stone sheet is thin and flexible, which can wrap curved walls and special-shaped surfaces easily.

Application Scenarios

Interior wall decoration, exterior facade cladding, hotel, restaurant, villa, shopping mall, office renovation, curved surface project.

Advantages

  1. Lightweight: Much lighter than traditional stone, save shipping & structure cost

  2. Flexibility: Good ductility for curved wall construction

  3. Durability: Good weather resistance, anti-freezing, anti-crack for outdoor use

  4. Simple Installation: Cut on site, no heavy equipment required

  5. Cost Effective: Similar natural stone look at a competitive price



Features

  • - Flexible & Bendable: Can be applied on curved surfaces
  • - Ultra-light & Thin: Reduce building load, easy transport
  • - Realistic Natural Travertine Pore Texture
  • - Fireproof, Weather Resistant & Anti-crack
  • - Easy to cut with common knife, low installation cost
  • - 6 standard colors ready for shipment
  • - Suitable for interior & exterior wall cladding