A swim spa that looks identical in a brochure can cost a project very different amounts once the shell, jet package, controls and freight are priced separately. Shortlisting is not about finding the lowest quotation; it is about finding a factory that answers the same technical questions in writing, so the units from three or four suppliers can be compared line by line. The checklist below follows the way SANTERSON documents its own swimming pools and swim spas, which is a practical template for evaluating any manufacturer you are screening.
Start With the Scope, Not the Catalogue
Before you send an enquiry to anyone, decide what the unit has to do on site. A lap pool with a swim current, a hydrotherapy spa for guests and a family plunge pool are three different briefs, and manufacturers build their ranges around one or two of them. Write down four numbers first: the clear space available for the cabinet, the depth you want, how many people will use it at once, and whether swimming against a current is a requirement or an option. With those fixed, most catalogues sort themselves out in a few minutes.
Our own range runs from compact spa-format units to long swim spas, so the same enquiry produces very different recommendations. The Outdoor Swim Spa WS-SP500 is listed at 5000 × 2500 × 1600 mm with a swim training system, while the Outdoor Swim Spa WS-PC07A-T is listed at 7000 × 3000 × 1470 mm with a heavier jet package. Both sit in the same category page, and neither is "better" — they answer different briefs.
Shortlisting Criterion 1: Construction That You Can Verify
Ask for the build specification, not marketing adjectives. On our Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features, the description names an acrylic interior, a reinforced cabinet and a high-performance water system. That is the level of detail you should expect from every manufacturer on your list, because it is what determines whether two quotations are for the same product.
- Shell: acrylic or alternative material, gauge or lamination method, and how the shell is supported once filled.
- Cabinet and frame: material of the outer carcass and whether it is sealed against ground moisture. Our Square Luxury Hot Spa specifies a #304 stainless steel metal frame, a sealed base and a moisture-free cabinet — ask other suppliers for the equivalent.
- Structural support: how the unit is supported on a deck, slab or plinth, and what load the supplier expects the substrate to carry.
- Weather exposure: what the cabinet finish is rated for outdoors, and what the manufacturer's own installation guidance says about drainage and ventilation.
If a supplier cannot give you these four answers in writing, move them down the list. A price that hides the specification will be reconciled later as a variation.
Shortlisting Criterion 2: The Jet, Lighting and Water-Feature Package
Massage jets, LED lighting and water features are where brochures look alike and products differ. Count them, and ask what drives them. Two units with "LED lighting and water jets" in the feature line can carry very different equipment sets.
| Catalogue item | Catalogue dimensions | Features shown on the product page |
|---|---|---|
| Outdoor Swim Spa WS-PC05 | 5000 × 3000 × 1100 mm | Water jets, LED lighting, Ozone, 4 water columns |
| Outdoor Swim Spa WS-SP600 | 5900 × 2500 × 1600 mm | Water jets, LED lighting, Ozone, Swim training system |
| Outdoor Swim Spa WS-PC07A-T | 7000 × 3000 × 1470 mm | Water jets, LED lighting, Ozone, Swim training system |
| Outdoor Swim Spa WS-S12 | 11740 × 2200 × 1470 mm | Water jets, LED lighting, Ozone |
The specification blocks behind those pages are where the comparison actually happens: jet totals, pump counts, control systems, LED quantities and total connected power. At the same 5900 × 2500 × 1600 mm footprint, the WS-SP600 and the WS-SP600-MS carry different jet counts, pump arrangements and total power figures in their catalogue specifications. Same footprint, different experience and different electrical load. Request that specification block from every shortlisted manufacturer and put the numbers into one spreadsheet.
Also ask what is optional rather than included. Our catalogue-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — availability and compatibility vary by model, and the same is true across the industry. Insulation in particular changes both running cost and how the unit behaves in a cold climate.
Shortlisting Criterion 3: Power, Water Treatment and Site Services
Total connected power decides your electrical work, not the spa. Ask each manufacturer to state total power for the exact configuration quoted, plus the supply arrangement they expect (single-phase or three-phase, dedicated circuit, protection device) and where the plant is located relative to the shell. Two of our catalogue entries make the point clearly:
Catalogue figures for reference: the WS-PC05 is listed at 2.25 kW total power with one water pump, one filter pump and 18 jets; the WS-PC07A-T is listed at 11.55 kW with one water pump, one filter pump and 56 jets. Those are catalogue values for those configurations, not a universal range.
Water treatment is the second site service decision. Ozone appears as a standard feature on several of our models, with UV sterilisation listed as an option; sand filtration is also listed as an option on some configurations. What matters for shortlisting is whether the supplier tells you the treatment train, the dosing expectation and the filter maintenance interval — because that is what your facilities team will run after handover.
Shortlisting Criterion 4: Can They Change the Shape and Size?
Terraces, courtyards and podium decks rarely fit a standard rectangle. A manufacturer who can only quote fixed models will push your layout to accommodate the product; one who works to order will do the opposite. Our Customizable Shape Outdoor Spa supports customised shapes such as square, round, oval and curved designs to fit different spaces and usage needs, built on a durable acrylic shell with balanced structural reinforcement. The Round Outdoor Hot Tub Spa with Hydrotherapy Jets & Underwater LED Lights uses an acrylic shell with a wood-look cabinet for terrace and backyard settings, and the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool pairs a long swimming channel with a separate relaxation area for a deck installation.
When you ask suppliers about customisation, request specifics: which dimensions can be modified, what the lead-time impact is, whether drawings are produced for approval before production, and how the cabinet finish can be matched to surrounding cladding or decking. That is also where a custom and OEM service becomes relevant if you are specifying under your own brand for a development.
Shortlisting Criterion 5: Who Coordinates the Rest of the Outdoor Area?
A swim spa is rarely procured alone. Poolside loungers, shade structures, changing areas, outdoor kitchen cabinetry and the paving or decking around the shell usually sit with different suppliers, and the interfaces between them are where projects lose time. A manufacturer who also supplies the surrounding outdoor furniture for villas and resorts can coordinate those items in one production and freight plan. That is one reason we work as a one-stop furniture and building materials supplier: the spa, the poolside seating and the finishes around it come from a single production schedule rather than four.
Shortlisting Criterion 6: Freight, Delivery and After Handover
Ask each shortlisted manufacturer how the unit gets to site and what happens afterwards. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery — ask your other candidates for the same breakdown and for the Incoterms they are quoting. Then check installation and after-sales support: site installation, inspection and snag lists, warranty terms, spare parts availability and maintenance guidance. Get the warranty wording in writing and read what is excluded, since pump, shell and cabinet coverages are often different.
The Shortlist Scorecard
- Build specification stated in writing: shell material, cabinet and frame, structural support, outdoor finish.
- Equipment table supplied: jet count, pump counts, control system, LED quantities, water features, total power for the quoted configuration.
- Included versus optional items listed separately, including insulation, heat pump, sterilisation and steps.
- Catalogue dimensions compared against your clear site space, with a tolerance for access and plant clearance.
- Site work agreed in writing: who supplies the power feed, the water supply and drain, the foundation or deck load, and the crane or access route for delivery.
- Custom sizing or shape available, with drawings issued for approval before production.
- Freight quoted on stated Incoterms, with packaging, loading and tracking described.
- Installation support, warranty wording and spare-parts supply documented.
- One point of contact accountable across the swim spa and the surrounding outdoor scope.
Send that scorecard to four or five manufacturers. The ones who fill it in completely are usually a short list of two, and at that point price becomes a fair comparison rather than a guess.
One last thing worth doing before you commit: check whether the manufacturer has delivered this category of product to your region before, and ask what the delivery and installation record looked like. A supplier who has handled swim spas on overseas residential sites will already have answers on container loading, site access and commissioning; a supplier who has not will be learning on your project.
Talk to us about your swim spa specification
Send the available dimensions, intended use and site conditions, and we will recommend configurations from our swim spa range with the equipment list, total power and delivery plan for your project. Ask about the models on this page through our contact page, and we will reply with the specification sheet for each candidate model.