Outdoor Swim Spa WS-SP500 is part of a configurable outdoor swim and hydrotherapy range. Catalog dimensions: 5000x2500x1600mm. Features shown in the catalog: Water jets, LED lighting, Ozone, Swim training system. Confirm included equipment and electrical requirements for the selected configuration.
Catalog-listed options include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model; confirm the selected configuration before ordering.