Outdoor Swim Spa WS-SP600-MS

Outdoor Swim Spa WS-SP600-MS

Description

Outdoor Swim Spa WS-SP600-MS is part of a configurable outdoor swim and hydrotherapy range. Catalog dimensions: 5900x2500x1600mm. Features shown in the catalog: Water jets, LED lighting, Ozone, Swim training system. Confirm included equipment and electrical requirements for the selected configuration.

Description

Model information

  • Model: WS-SP600-MS
  • Catalog dimensions: 5900x2500x1600mm
  • Control system: 1set
  • Swim training system: 1set
  • Water pump: 1pc
  • Filter pump: 1pc
  • Jet total: 29pcs
  • LED lights: 4pcs
  • Total power: 11.55kW
  • Features shown: Water jets, LED lighting, Ozone, Swim training system

Optional accessories

Catalog-listed options include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model; confirm the selected configuration before ordering.

Features

  • - Water jets
  • - LED lighting
  • - Ozone
  • - Swim training system