A wall-hung basin looks simple on a drawing, but three details decide whether it lands correctly on site: the overall size, how it is fixed to the wall, and where the waste and water connections sit behind the finished surface. This guide uses the Wall Hung Ceramic Basin 1050WB, Luxury Gold Line Wall Mount Bathroom Sink to show how a buyer or specifier can turn a product page into a complete, checkable specification before an order is placed.

What the Published Data Already Answers

The 1050WB sits in the 1050 sanitary collection and is described on its product page as a wall-mounted basin with a soft trapezoid silhouette and a gold line ornament. The listed outline is 495 mm wide, 440 mm deep and 390 mm high, and the basin is fixed to the wall by its back panel rather than by a cabinet or pedestal. A faucet hole is pre-drilled for a single tap fitting.

Those four facts already settle most of the spatial question. At 440 mm projection with no floor unit beneath it, the basin keeps the floor line clear, which is why this type of sink is usually specified for secondary bathrooms, boutique hotel restrooms and villa guest bathrooms where a vanity would crowd the room.

Specification Fields to Write Into the Schedule

Copy the fields below into your fixture schedule and fill each one from the current technical sheet for the project. Leaving any of them blank is where coordination problems start.

FieldWhat to recordStatus on 1050WB
Model and seriesExact model code plus the matching series it belongs to1050WB, part of the 1050 collection
Overall dimensionsWidth, projection from finished wall, height495 × 440 × 390 mm as listed on the product page; confirm against the technical sheet before ordering
Material and finishBody material, glaze type, decorative detailVitreous china with a smooth glaze and gold line decoration
Mounting methodHow the load is carried, and what wall structure carries itBack-panel fixing to the wall; no cabinet or pedestal required
Faucet provisionNumber and position of tap holes, tap type and reachOne pre-drilled faucet hole for a single-lever fitting
Waste and trapWaste outlet position, trap type, distance from finished wall and floor levelNot stated on the product page; must be taken from the technical sheet
Inlet positionHot and cold inlets relative to the finished wall and floorNot stated on the product page; confirm with the factory drawing
Fixing hardwareWhether brackets, bolts and sealant ship with the basinConfirm in the quotation line item
Spare partsWhat is held for future replacement or refurbishmentAgree at order stage, not after handover

The Rough-In Block: Confirm Before the Wall Is Closed

For a back-panel wall basin, the wall behind the finished surface is doing the structural work. Two checks are worth making on the approved drawing:

  • The wall build-up carries the fixing points and stays rigid once tiled. Framed partitions need noggins or a steel frame at the fixing line; the exact positions come from the factory fixing diagram.
  • Waste and inlet heights are set from the finished floor and finished wall faces, not from the structural slab and bare masonry. Record both offsets in millimetres on the drawing.

Because the 1050WB leaves the floor open, pipe routes that would normally hide inside a vanity cabinet need to be planned into the wall or into a low boxing. Send your marked-up layout to the supplier with the enquiry and ask them to confirm it against their fixing diagram; that single exchange prevents most on-site modifications.

Matching It With the Rest of the Room

The 1050 series exists so that a set of fixtures can be specified once and repeated across several bathrooms. The Washdown One Piece Toilet 1050A carries the same gold line detail in a square one-piece form, and its page lists both P-trap and S-trap rough-in options, which is useful when guest bathrooms and main bathrooms have different drain layouts. The Freestanding Pedestal Basin 1050B covers rooms where a floor-standing unit is preferred, and the taller Wall Hung Ceramic Basin 1050WC works as a feature basin in a powder room or entrance bathroom.

A practical way to handle this is one schedule row per bathroom, each naming the basin, WC and any accessories, so the procurement package shows which combination goes where instead of listing loose items.

Care, Use and Replacement Notes Worth Recording

The glazed vitreous china body is described as resisting water marks and mineral deposits, with routine wiping as the normal cleaning step. For a hospitality or rental handover pack, note that abrasive pads and strong acid cleaners are what damage glaze and decorative line work over time, and put a mild detergent on the maintenance list.

Also record what happens years later. Wall-hung basins are replaced far more easily when the model code, fixing diagram and spare-part route are in the handover file. Where a project repeats one basin across many bathrooms, ask the supplier which parts remain available for that model and how replacements are ordered.

Ordering Through a One-Stop Supplier

Bathrooms rarely need only a basin. Ceramics, shower fittings, lighting, vanity and storage units, wall panels and flooring are usually procured together, and split suppliers mean split schedules and split fixing information. SANTERSON is a China-based furniture and building materials manufacturer supplying bathroom ceramics alongside cabinetry, lighting, wall finishes and other fit-out products for villa, hotel and office projects, with project services covering design coordination, custom and OEM work, production, freight to site and after-sales support.

If your project needs a different size, finish or decorative detail on the 1050WB, raise it as a custom and OEM enquiry with the drawing attached, and ask for a confirmed technical sheet for the modified version rather than relying on the catalogue page.

Before any order is released, have the supplier return a signed technical drawing for the exact model supplied: overall dimensions, fixing positions, waste and inlet offsets, and the trap type. Product pages give the starting point; the drawing is what the site team builds to.

Send the 1050WB enquiry with your marked-up bathroom layout and the room list attached, and ask for the schedule back in the same format you wrote it. A specification that comes back complete is a good signal about how the rest of the package will be handled.