A sample of flexible rammed earth cladding arrives, the installer holds it against a curved column and it bends cleanly into place — but the wall behind the reception desk is still 12 m long, the substrate is plasterboard, and nobody has confirmed how the joints will read at eye level. That gap between "the material works" and "this wall is specified" is where most cladding projects lose time. Below is the measurement set and the project information we ask buyers, designers and contractors to send before we quote MCM Flexible Rammed Earth Panel - Bendable Soft Stone Wall Cladding, and what each figure actually decides.
Start With the Wall Geometry, Not the Finish
1. Straight runs: length, height and where the cuts fall
Send overall run length and clear height for each face, then mark the fixed points that force a cut: door heads, window reveals, skirting, cornices, switch plates, socket clusters, air diffusers and handrails. A panel field is only as tidy as its smallest offcut, so we need to know whether a 40 mm sliver would land in a visible corner or hide behind furniture.
2. Curves, cylinders and special-shaped surfaces
The reason this material is specified at all is that it is thin and flexible: unlike rigid stone panels, it can be bent onto curved walls, cylinders and shaped surfaces. To specify it properly we need the geometry of those curves — radius or diameter, the arc length along the curve, whether the surface is a single curvature (a column, an arch) or a double curvature (a dome-like form), and whether the curve runs vertically or horizontally. A 600 mm radius column and a 6 m radius boardroom wall are different fixing details even in the same colour.
3. Internal versus external exposure
State for each face whether it sits inside or outside, and describe the exposure: shaded or sun-facing, splashed by pool or irrigation water, subject to freeze-thaw cycles in winter, touched by guests at a corridor return. The product page describes interior and exterior wall decoration and exterior wall renovation as applications, but fixing method, joint treatment and edge detailing follow from the exposure you list, not from the label on the drawing.
Substrate Data Decides the Fixing Method
The panels stick directly onto a cement base or gypsum board with tile adhesive, so the substrate condition is specification data, not site trivia. Please confirm:
- The substrate material — cement render, cement board, plasterboard, existing tile, existing paint, brick or block.
- Whether the surface is flat, hollow-sounding, dusty, powdery or still curing; new render needs to be dry and sound before adhesive goes on.
- Total flatness deviation across a 2 m straight edge. Flexible sheets follow the wall; they do not correct it, so a wavy base becomes a wavy finished line.
- Existing fixings and penetrations to work around: conduit, back boxes, downlights set into a wall, brackets for signage or joinery.
- For renovation work, whether the existing finish will be removed or over-clad, and the resulting build-up at floor lines, window reveals and door frames.
Colour, Texture and Joint Details to Confirm Before Order
The rammed earth look is a moulded surface that reproduces the rough texture of traditional rammed earth walls. The product is offered in white and earth brown colourways. Two inputs decide how the finished wall reads:
- Colour and banding direction. Tell us which colourway, and whether the strata lines should run horizontally or vertically on each face. A sample under site lighting looks different from a sample under a shop spotlight, so judge the colour at the actual light level of the room.
- Joint treatment. The page notes easy joint treatment; what matters for your drawing is whether joints are tight, set out as a deliberate shadow line, or continued through internal and external corners. Send a sketch of the corner detail you expect.
Order samples against the real substrate and the real lighting before locking quantities. Colour names on a screen do not match earth-toned surfaces under warm 2700 K hospitality lighting, and we would rather correct a colour choice on a sample sheet than on an installed feature wall.
Quantity Inputs That Come From the Setting-Out Drawing
A bill of quantities for this cladding is short but specific. Please provide:
| Input | Why we need it |
|---|---|
| Net clad area per face, in square metres, with openings deducted | Sizes the panel order and separates interior from exterior faces. |
| Setting-out drawing or sketch with panel orientation marked | Determines how many full sheets are needed versus cut pieces, and where offcuts fall. |
| Curved-face count with radius and arc length for each | Curved work needs a different handling and fixing approach than flat runs. |
| Edge and corner linear metres (external corners, reveals, window surrounds) | Corners and reveals are where site cutting time is spent. |
| Waste allowance you accept for cuts and pattern matching | Ambitious setting-out on a shaped wall means more offcuts; agree the allowance in writing. |
| Adhesive and joint materials | Tells us whether tile adhesive and finishing materials ship with the panels or are sourced locally. |
Because the sheets are lightweight, they reduce wall load and simplify transportation and construction — which also means packing and pallet breaks follow your face sizes. Tell us the largest panel each site can receive: lift capacity, stair width, door width and corridor turning radius all matter on upper floors and in occupied hotels.
Project Inputs That Affect Lead Time and Coordination
Beyond measurements, four project facts change how an order is prepared:
- Site type and access. Homestay, restaurant, exhibition hall, retail shop, villa feature wall or exterior renovation each carry different working hours, protection requirements and storage space.
- Programme. The date the wall must be finished backwards from handover, plus any milestone inspection on the substrate.
- Who installs. Panels can be cut on site with simple tools, and construction efficiency is one reason contractors accept them — but we still need to know whether your own crew or our installation support is doing the work, so the right guidance travels with the goods.
- Delivery terms and destination. Port or site address, floor level, delivery vehicle access. Our logistics service covers freight forwarding, customs paperwork, packaging and container loading through to door-to-door delivery, and we plan packing around the face sizes you confirm.
How These Inputs Fit a Larger Fit-Out Package
Rammed earth panels rarely arrive alone. On villa and hospitality jobs they sit beside other wall finishes, joinery, lighting and flooring from the same programme. If your package also includes curved or feature surfaces elsewhere, our MCM Flexible Travertine Stone Veneer - Bendable Soft Stone for Interior & Exterior Wall Cladding is the companion option where a natural stone look with visible hole texture is wanted instead of earth strata; send both faces in one enquiry and we coordinate them as one shipment. For mineral-based sheets with a timber appearance on the same job, see Flexible Wood Grain Cement Wall Panel. Browse the wider range in Wall Panels and Wall Cladding, or review how wall finishes are coordinated with furniture and fixtures through our Turnkey Solutions for villa, hospitality and office projects.
A Simple Checklist Before You Send the Enquiry
- Face list: every wall to be clad, with length, height, internal or external exposure.
- Curve schedule: radius, arc length, single or double curvature, orientation.
- Substrate report: material, condition, flatness deviation, penetrations.
- Finish decisions: colourway, strata direction, joint and corner detail.
- Quantities: net area, setting-out sketch, edge linear metres, agreed waste allowance.
- Logistics: largest receivable panel size, site access, delivery address, programme dates.
Send those six items and a specification stops being a conversation about the material in general and becomes a priced, buildable detail for your wall. That is also how we keep sampling, production and delivery on one schedule rather than three.
Can the panel be cut to fit reveals and sockets on site?
Yes. The sheets can be cut, drilled and bent on site with simple tools, which is why installers accept them around switch plates, downlight openings and window reveals instead of ordering pre-cut pieces from us. Send the penetration positions so your crew knows what to expect; we do not need to machine every opening in the factory.
Does a curved wall need a different panel?
No separate product is required for a single-curvature surface such as a column or arch — the same flexible sheet bends onto it. What changes is the fixing sequence and how the joints are closed at the top and bottom of the curve, so the radius and arc length belong in your enquiry rather than a note saying "curved wall".
What if only part of the wall is exposed to weather?
Split the face list accordingly. The material is used for both interior decoration and exterior wall renovation, but a soffit above an entrance canopy, a splashed pool wall and a dry restaurant partition are three different fixing and joint details. Mark each zone on the drawing and we price them as separate lines instead of one blended rate.