Rammed earth walls have become one of the most requested finishes in Australian hospitality and residential projects, but building one the traditional way means formwork, wet trades and a very heavy wall. That is why MCM flexible rammed earth panel - bendable soft stone wall cladding - has started appearing in Australian specifications. Before you write it into a project, though, there is a short list of things worth confirming with the supplier. This article walks through each one.

What the product actually is

MCM flexible rammed earth panel is a modified clay wall cladding, often described as soft stone or soft ceramic. It reproduces the layered, matte texture of a traditional rammed earth wall, but it comes as a thin sheet rather than a solid masonry build. The material can be bent and bonded to curved walls, cylinders and other non-planar surfaces that rigid stone or brick simply cannot follow without expensive custom work.

SANTERSON's product page lists white and earth brown colourways, and describes typical use in homestays, restaurants, villas, exhibition halls, retail shops and heritage-style renovation, applied to both interior feature walls and exterior wall renovation. Installation is a bonding job: the sheets are fixed to a cement-based substrate or gypsum board with tile adhesive, cut on site with ordinary hand tools, and jointed like any other cladding.

Why it appears in Australian project specifications

Two drivers explain most of the interest. First, curved and arched geometry is common in new villas and refurbished hospitality interiors, and a bendable cladding removes the need to fabricate curved masonry. Second, weight matters: a thin bonded sheet adds far less load to a wall than built masonry or thick stone, which is relevant for retrofit work over existing substrates and for shipping, since the material can be packed flat and handled without lifting equipment.

For buyers sourcing from China rather than buying locally, the same product family also covers MCM flexible travertine stone veneer, which replicates the pitted surface of natural travertine, and flexible wood grain cement wall panel, a mineral-based sheet with a timber-look surface that is supplied as a white raw face you can paint to a project colour. If your design mixes rammed earth with stone or timber accents, asking for all three from one supplier simplifies sampling and consolidation.

Point 1: Confirm which sheet you are being quoted

Soft stone is a family of products, not one product. Rammed earth, travertine and wood grain surfaces look similar in small photographs but differ in texture depth, colour range and how they read at eye level in a lit interior. Ask for the exact item name used on the supplier's own page, and match it to a physical sample before approving a quantity.

Sheet typeSurfaceWhere it is usually specified
MCM flexible rammed earth panelLayered, matte rammed earth bandingLobby and restaurant feature walls, villa interiors, exterior renovation
MCM flexible travertine stone veneerNatural travertine hole textureHotel reception, retail, facade and curved surface cladding
Flexible wood grain cement panelMoulded timber grain over a cement-based sheetBackground walls, arches, ceilings, painted feature surfaces

Point 2: Ask how the sample was made, not just what it looks like

A small sample tells you colour and texture, but not how the sheet behaves when bent. Request a sample that has actually been curved around a former of the radius your project uses, and inspect the outside face of the bend for cracking or whitening at the stretch side. Also check the batch number: rammed earth reproductions are moulded, and colour can shift between production runs, so samples taken months apart are not proof that a later order will match.

Point 3: Verify the substrate and fixing system for your wall

The published installation method is bonding to a cement base or gypsum board with tile adhesive. That works well on a prepared, flat, structurally sound wall, but it puts the responsibility for the substrate squarely on the local builder. Before ordering, confirm on site:

  • whether the existing wall is cement render, brick, plasterboard or steel frame, and whether it needs a new render coat first;
  • that the surface is flat enough for bonded sheets, since soft stone follows rather than hides irregularities;
  • which adhesive your local installer intends to use, and whether it is compatible with the sheet and the substrate in your climate zone;
  • how external corners, window reveals and junctions with other finishes will be detailed.

Ask the supplier for their fixing recommendation in writing and hand it to your installer. Do not assume a local adhesive choice is interchangeable.

Point 4: Be explicit about where the panel will be used

The rammed earth sheet is offered for interior and exterior wall decoration. The travertine variant is described as weather resistant, with anti-freezing and anti-crack properties for outdoor use. That does not mean every soft stone product suits every exposure. Australian conditions vary enormously - a north-facing facade in Queensland, a salt-exposed wall in Perth and a wet bathroom in Melbourne are three different problems.

State the exact application on your enquiry: interior dry, interior wet, covered exterior or fully exposed facade. Ask which product the supplier recommends for that exposure, and get their answer recorded against the order. Where a finish is decorative rather than structural, confirm what sits behind it and who is responsible for waterproofing.

Point 5: Order the quantity properly

Curved work generates offcuts. Measure the developed surface area of curved walls rather than their plan footprint, then add a wastage allowance agreed with your installer rather than accepted from the supplier's default. Split large orders into deliveries only if you can lock colour and batch across them; staged shipments from different runs are where colour mismatch usually starts.

Confirm minimum order quantity, packing format, sheet dimensions and pallet count before you commit to a container share. These figures drive both your landed cost and whether the sheets arrive flat and undamaged.

Point 6: Get the paperwork and logistics settled before production starts

SANTERSON's logistics service covers freight forwarding by sea, air and rail, customs documentation, packaging and container loading, shipment tracking and door-to-door delivery. For an Australian import you should still confirm the specific terms for your order: Incoterms, who arranges marine insurance, declared values, the shipping documents supplied, and which port or site the price is delivered to.

Transit time, duties and any inspection requirements are case-by-case matters for your customs broker. Ask the supplier for the commercial invoice, packing list and certificate of origin format they will issue, so your broker can check it before goods depart.

Point 7: Agree what happens after delivery

The company's service pages describe on-site installation, inspection and snag resolution, warranty coverage, spare parts and ongoing maintenance. Response-time figures published on a website are not the same as terms written into your contract. Before payment, ask in plain language: what is covered, for how long, who performs installation locally, and how a claim is raised.

Order a small surplus of sheets from the same batch at the time of purchase. A shortage discovered during installation cannot always be matched later, and offcuts from your own batch are cheaper than a second colour-matching exercise.

A pre-order checklist

  • Physical sample received, plus one sample bent to the project radius and inspected for cracking.
  • Exact product name matched to the supplier's published page, with colour and batch confirmed.
  • Substrate type, flatness and preparation scope agreed with the local builder.
  • Adhesive and fixing method recommended in writing by the supplier.
  • Application exposure stated on the enquiry; product recommendation recorded against it.
  • Developed-area quantities and wastage allowance confirmed; minimum order quantity accepted.
  • Sheet size, packing format, pallet count and container plan agreed.
  • Incoterms, insurance, documents and delivery point confirmed with your broker.
  • Warranty terms, installation responsibility and claim process in the contract, not just on the website.
  • Surplus sheets from the same batch ordered with the main quantity.

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, operating since 2008, with custom and OEM service, door-to-door logistics and installation support. Enquiries about flexible wall cladding can go to PHILLIP on +86-13928214007 or santerson@qq.com, through the contact page.

Common questions

Can it go over an existing painted wall? Bonded cladding needs a sound, flat, compatible base. Whether your existing surface qualifies is a site decision for your installer; ask the supplier for their substrate requirements and have them assessed on site before ordering.

Is it suitable for curved columns? Yes - bending onto cylinders and other shaped surfaces is the main reason this material is specified. Confirm your column radius against a bent sample first.

Does it come in colours beyond white and earth brown? The rammed earth product is listed in those two colours. Other finishes in the same family, such as travertine and wood grain sheets, have their own colour options, and availability should be confirmed at enquiry.

Can I order it with other project materials? If you are furnishing a villa or hospitality fit-out, wall cladding can be consolidated with the supplier's wall panels and wall cladding range alongside cabinetry, flooring, lighting and furniture, which reduces the number of separate shipments to coordinate.