Outdoor Swim Spa WS-S38 is a compact hydrotherapy unit in our configurable outdoor swim and spa range, and it suits a lot of villa terraces and resort pool decks. It is not the right answer for every site, though. This guide sets out the checks we use when a buyer asks whether to stay with WS-S38 or move to another model in the swimming pool and swim spa catalogue.
Start With What You Actually Want To Do In The Water
Two jobs look similar on a drawing but need different shells, pumps and layouts: daily hydrotherapy, and lap-style swimming against a current. WS-S38 is built around massage and relaxation. Its catalogue specification lists 51 jets with 6 water columns, four LED lights plus twelve small LED lights, ozone sanitation and a waterfall feature, in a shell of 3760 × 2080 × 1110 mm.
If the primary brief is swimming lengths or resistance training, ask us for a model whose specification includes a swim training system instead. Outdoor Swim Spa WS-SP500 and Outdoor Swim Spa WS-SP600 both list a swim training system as standard equipment, with deeper shells (1600 mm against the 1110 mm of WS-S38) so the current can be set up properly. Comparing jet counts across these two families is not meaningful; they are solving different problems.
Check The Footprint Against Your Real Structure
A swim spa is one of the few products in a project where the delivery route matters as much as the finished look. Before you lock a model, confirm three measurements on site: the clear internal size of the placement area, the narrowest point on the access route (gate, corridor, lift, stair turn), and the load rating of the slab or terrace. WS-S38 is the smallest shell in the comparison below, which is usually why it gets shortlisted for raised terraces and courtyard decks.
| Model | Catalogue dimensions (mm) | Total power | Jet total | Features shown on the product page |
|---|---|---|---|---|
| Outdoor Swim Spa WS-S38 | 3760 × 2080 × 1110 | 14.05 kW | 51 jets; 6 water columns | Water jets, LED lighting, Ozone, Waterfall |
| Outdoor Swim Spa WS-S04 | 4090 × 2200 × 1110 | 8.25 kW | 26 jets; 4 water columns | Water jets, LED lighting, Ozone, Waterfall |
| Outdoor Swim Spa WS-S06 | 5820 × 2220 × 1110 | 6.35 kW | 56 jets | Water jets, LED lighting, Ozone, Waterfall, 4 water columns |
| Outdoor Swim Spa WS-SP500 | 5000 × 2500 × 1600 | 9.35 kW | 6 jets | Water jets, LED lighting, Ozone, Swim training system |
| Outdoor Swim Spa WS-SP600 | 5900 × 2500 × 1600 | 9.35 kW | 6 jets | Water jets, LED lighting, Ozone, Swim training system |
Read that table as a starting point for a conversation, not as an order sheet. The figures come from the catalogue pages at the time of writing, and equipment fitted to a specific unit follows the configuration you confirm with us.
Match Jet Count And Power To How The Spa Will Be Used
Jet count is easy to misuse as a ranking number. WS-S38 carries 51 jets and 6 water columns at 14.05 kW total power, while Outdoor Swim Spa WS-S04 lists 26 jets and 4 water columns at 8.25 kW in a shell only slightly longer. The higher figure on WS-S38 buys a denser massage layout in a shorter footprint; the lower figure on WS-S04 means less electrical load across a marginally larger shell. Neither is automatically better.
Ask your electrical contractor for the available supply and the spare capacity at the intended position before you choose, because total power drives cable size, protection and, in some cases, whether a three-phase feed has to be brought in. We will confirm the electrical requirement for the configuration you select; do not assume that the catalogue figure alone tells your contractor what to install.
Decide Which Options Belong On Your Quotation
Options across this range include control systems, UV sterilization, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so treat the option list as a checklist to send back to us rather than a shopping cart.
- Heat pump — decide this early. It sets the running profile of the spa in cooler months and affects where plant equipment can sit.
- Insulation — worth pricing for any site where the spa is used year-round rather than seasonally.
- Sand filtration and UV sterilization — these change the routine maintenance load; a resort pool deck and a private villa terrace rarely need the same treatment train.
- Steps — check them against the finished floor level after waterproofing and finishes, not against the structural slab.
If none of the standard shells fits the space or the concept, we also produce spas with customised shapes — square, round, oval and curved — on an acrylic shell with structural reinforcement. See Customizable Shape Outdoor Spa, Personalized Hydrotherapy Pool for that route.
A Procurement Checklist Before You Commit
- Site survey: placement area, access route, slab or terrace load rating, and the position of plant and drainage.
- Electrical: supply type, spare capacity and the requirement for the confirmed configuration.
- Configuration sheet: jets, water columns, lighting, ozone, waterfall, plus the options above — all listed in writing before production.
- Finish and surround: agree spa colour, coping and deck finishes together, so the joint detail is designed once rather than patched later.
- Delivery scope: our logistics and door-to-door delivery covers freight forwarding by sea, air and rail with customs paperwork and container loading; confirm terms and access arrangements for your site.
- Handover: agree what installation and after-sales support covers on your project, including commissioning, inspection and spare parts.
Specification note: the dimensions, jet counts, lighting counts and power figures quoted above are transcribed from our catalogue pages. They vary with the configuration ordered, and some entries in the range list different equipment combinations from one another. We confirm the final specification in writing for each order.
Send us the placement drawing, the available electrical supply and a short note on how the spa will be used — hydrotherapy, family use, or swim training. We will come back with either WS-S38 or two alternatives from the range, priced as complete configurations, through our custom and OEM service.