Outdoor Swim Spa WS-S04 is part of a configurable outdoor swim and hydrotherapy range. Catalog dimensions: 4090x2200x1110mm. Features shown in the catalog: Water jets, LED lighting, Ozone, Waterfall. Confirm included equipment and electrical requirements for the selected configuration.
Catalog-listed options include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model; confirm the selected configuration before ordering.