Outdoor Swim Spa WS-S04 is one of the configurable swim and hydrotherapy units we build for villas, resorts and private residences. Because it is made to order rather than picked off a shelf, the quotation depends on details that go beyond the model name — how it will be sited, wired and filled, and which options you want fitted. This guide walks through exactly what to send us so the price you receive is the price you pay.

What WS-S04 Is, and Why the Quote Is Not a Single Number

The Outdoor Swim Spa WS-S04 sits in our Swimming Pools and Swim Spas range alongside a wide family of models from compact plunge-format tubs to long counter-current swim units. The catalog sheet for WS-S04 lists a shell of 4090 × 2200 × 1110 mm, three water pumps, one filter pump, a jet package of 26 jets with four water columns, LED lighting, ozone sanitation and a waterfall feature, with total connected power shown as 8.25 kW.

Those figures describe the standard catalog build. They are not a delivery specification. Heat pumps, UV sterilisation, sand filtration, insulation, steps and control upgrades are listed options, and each one moves both the equipment list and the power draw. So does your local electricity supply: an installation wired for single-phase service will not carry the same pump and heating arrangement as one fed with three-phase power. That is why we quote WS-S04 per project instead of publishing a fixed price.

Catalog reference for WS-S04

Shell dimensions4090 × 2200 × 1110 mm
Water pumps3 pcs
Filter pump1 pc
Jet package26 jets, 4 water columns
Lighting3 LED lights plus 18 small LED lights
Catalog total power8.25 kW (standard build)
Features shownWater jets, LED lighting, ozone, waterfall

Catalog values are a starting point for discussion. Your confirmed configuration and site conditions govern the final specification and quotation.

Information to Prepare Before You Write to Us

A quote request that arrives with these details usually comes back priced within one working cycle. A request without them turns into a chain of emails, and the price you see first is not the price you see last.

1. Site and access

  • Where the unit will sit — terrace, garden, rooftop, sunken deck or an indoor plant room.
  • The prepared base: concrete slab, reinforced deck or plinth, and whether it is already levelled.
  • Clear access route from the delivery vehicle to that base, including gate widths, steps, overhead beams and any tight corner that limits how a shell can be carried in.
  • Drainage and overflow arrangements at the location, plus where backwash or drain-down water will go.

2. Power and services

  • Supply type and voltage available on site — single-phase or three-phase, and the frequency your region uses.
  • Dedicated circuit capacity in the distribution board, and how far the board is from the spa position.
  • Whether you want heated water year-round or seasonal use, since that decides heat pump sizing and insulation level.
  • Preference for heating source: electric heat pump, or existing boiler or solar thermal input where one is available.

3. Configuration choices

  • Options you want fitted: UV sterilisation, sand filtration, upgraded control system, extra insulation, steps, cover.
  • Whether the waterfall and full jet package are wanted as standard, or trimmed to a swim-and-plunge build.
  • Colour and finish preferences for the shell and cabinet trim.
  • If you are comparing siblings: WS-S04B offers a deeper 3900 × 2200 × 1450 mm shell with a larger jet package, while WS-S04X covers another layout in the same family. Tell us which you are weighing and why.

4. Project context

  • Quantity, and whether the spa is one line item in a wider fit-out. Many of our orders combine swim spas with Outdoor Furniture for Villas and Resorts, paving, wall finishes and lighting so that everything lands together.
  • Project type — private villa, boutique hotel, resort or wellness facility. Commercial work brings different documentation and lead-time planning.
  • Your target installation month, and any fixed handover date we should design backwards from.
  • Delivery address and the import arrangement you prefer, so freight can be quoted alongside the unit.

How We Turn Your Brief into a Quotation

The route is the one described on our Interior Design Services page: project brief and design proposal first, then quotation with detail confirmation, then production, shipment and follow-up.

For a swim spa specifically, that means we review your site photos and dimensions, confirm the equipment set against your power supply, and return an itemised quotation. The itemisation matters. It shows the shell, pumps, jet package, control system, sanitation option, insulation, steps, packaging and freight as separate lines, so you can remove or upgrade an item and see the effect instead of guessing.

Where a standard model does not suit the space, we look at fabrication instead. Our Customizable Shape Outdoor Spa line covers square, round, oval and curved shells in acrylic with structural reinforcement, which is the route for awkward terraces, internal courtyards or a spa that must follow a non-rectangular footprint. Send us the plan drawing and we will tell you honestly whether a modified WS-S04 or a custom shell is the cheaper answer.

For repeat buyers, architects' clients and brands ordering under their own label, our Custom & OEM Service covers bespoke finishes, prototyping and private labelling. Mention it in the enquiry and we will quote on that basis from the start.

What a Serious Quotation Should Show You

Before you commit to any supplier in this category, check that the paperwork answers these questions. A quotation that leaves them open will cost you later.

  • Exact dimensions of the shell as built, and the working clearances needed for maintenance access to pumps and filters.
  • Pump count and duty, jet count, and which features are included rather than optional.
  • Total connected power for the quoted configuration, not the catalog figure, plus the supply it assumes.
  • Sanitation method as fitted — ozone, UV, or both — and what consumables you will need each year.
  • Insulation specification and cover, which decide running cost far more than the list price does.
  • Packaging method and container loading plan, with photos of similar shipments.
  • Freight terms stated explicitly: port-to-port or door-to-door, and who carries customs clearance and duty.
  • Payment schedule and what triggers production start.
  • Spares list and how replacement parts ship, since a pump seal is easy to source locally and a proprietary control board is not.

Common Reasons Quotes Go Wrong

Three patterns cause most of the friction we see in enquiries for this product class.

Power assumed, not measured. A buyer specifies the full jet and heating package, then discovers the villa supply cannot carry it. Send the distribution board photograph with your enquiry; it settles the question in one image.

Access discovered at delivery. A shell that fits the terrace plan may not fit through the side gate or under a first-floor overhang. Photograph the route and measure the narrowest point before we finalise packaging.

Options priced after order confirmation. Insulation, steps and a heat pump added late change both price and production slot. Decide these at quotation stage.

Sending Your Enquiry

Write to us with the model name WS-S04 in the subject line, your city for delivery, and the site and power details listed above. Photographs of the intended position and of the access route are more useful than any drawing you can produce from memory. If you are still deciding between models, say so — we will compare WS-S04 against the deeper or longer formats in the same range on your dimensions rather than simply quoting what you asked for.

Talk to us about WS-S04

SANTERSON has manufactured furniture and building materials for project clients since 2008, with swim spas, outdoor collections, interior fixtures and finishes supplied together on villa and hospitality projects. Contact PHILLIP on WhatsApp or by phone at +86-13928214007, email santerson@qq.com, or use the Contact page. Enquiries sent with site photos and power details usually return a configured quotation within one working day of receipt.