Outdoor Swim Spa WS-S04B

Outdoor Swim Spa WS-S04B

Description

Outdoor Swim Spa WS-S04B is part of a configurable outdoor swim and hydrotherapy range. Catalog dimensions: 3900x2200x1450mm. Features shown in the catalog: Water jets, LED lighting, Ozone. Confirm included equipment and electrical requirements for the selected configuration.

Description

Model information

  • Model: WS-S04B
  • Catalog dimensions: 3900x2200x1450mm
  • Control system: 1set
  • Water pump: 3pcs
  • Filter pump: 1pc
  • Jet total: 31pcs
  • Water column: 6pcs
  • LED lights: 2pcs
  • Small LED lights: 28pcs
  • Total power: 10.35kW
  • Features shown: Water jets, LED lighting, Ozone

Optional accessories

Catalog-listed options include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model; confirm the selected configuration before ordering.

Features

  • - Water jets
  • - LED lighting
  • - Ozone