A wall-hung basin looks simple on a drawing. It is one rectangular shape on the wall, one tap hole, one waste. That simplicity is exactly why quotes for these basins go wrong: the line item that reads "wall hung basin, gold line" can hide three or four decisions that only surface after the containers have been booked. If you are pricing a wall hung ceramic basin from the Luxury Gold Line range — model 1050WB, a wall-mount bathroom sink with a soft trapezoid bowl and a fine gold line — for a hotel, villa or apartment package, this is what a complete quotation should state, and what to chase when it does not.
Start with the model designation, not the description
Sanitary-ware ranges are full of near-identical names. In our 1050 Gold Line collection alone there are two wall basins: 1050WB, a soft trapezoid bowl fixed to the wall by its back panel, and 1050WC, a tall vertical basin used as a feature sink. Both carry the same gold line ornament, both are described as luxury wall-mount sinks, and both share the same matching suite. A quote that says "gold line wall basin" without the model code is not comparable across suppliers, and an interchangeable substitution made at order confirmation changes the look of every bathroom in the project.
Ask for the model code to appear three times: on the quotation line, on the packing list, and on the product carton label. That is what makes inspection against the approved sample possible when the shipment arrives.
Dimensions, rough-in and the trap — where the money actually leaks
The published size for 1050WB is 495 × 440 × 390 mm. That tells you how much wall the bowl occupies, but it does not tell your plumber anything. The numbers that decide whether the basin can be installed at all are the ones most quotes leave blank:
- Drain centre and trap type. Which waste outlet geometry the bowl is supplied with, and how far the fall must run to your soil stack. A wall-hung basin on a concealed frame needs the rough-in set before the wall is closed, so this has to be settled at quotation stage, not on site.
- Water supply position. Where the hot and cold isolation valves sit relative to the finished floor level, and whether they remain reachable after tiling.
- Faucet hole and tap reach. 1050WB is supplied with a pre-drilled faucet hole for a single-lever mixer. Confirm the tap projection and spout height you are quoting against, so the basin and mixer arrive as a working pair rather than two parts that clash on site.
- Finished floor level to rim height. The installation height should be stated on the quote, because it interacts with mirror, lighting and vanity heights elsewhere in the bathroom package.
A practical test: send your supplier the plumbing setting-out drawing and ask them to mark the rough-in dimensions on it. If a supplier cannot return that marked drawing, they have not quoted the installation — only the ceramic.
What the quote should itemise line by line
Compare quotations on structure, not on unit price. A comparable line-up for a wall-hung basin package looks like this:
| Line item | What to verify in the quote |
|---|---|
| Ceramic basin, model code | Full model code, colour/finish name, and quantity per bathroom type on the schedule. |
| Mounting system | Whether wall fixings are included, and whether they suit your substrate — stud frame, brick, or steel framing each need a different fixing detail. |
| Waste and trap | Included or bought locally? Short supply to the waste tee? Finish of the visible trap if exposed. |
| Mixer / tapware | Usually quoted separately. Confirm hole spacing, spout reach and whether the mixer is from the same order or a local buy. |
| Spare parts and buffer stock | Fixing sets, spare waste components or a small buffer of basins for snags and future replacement — worth pricing explicitly rather than arguing about later. |
| Packaging and loading | Ceramics are fragile freight. Ask how cartons are protected and how they sit in the container next to cabinetry and lighting. |
| Freight basis | The Incoterm, port or door, and who carries insurance. Two quotes at the same unit price can differ by a wide margin once freight terms are read properly. |
Material and glaze: what to ask for in writing
1050WB is made of vitreous china with a smooth glaze, the standard body material for ceramic sanitary ware and the reason these basins wipe clean and resist limescale and staining in daily use. In a project quotation, marketing adjectives are not useful; what matters is that the specification names the body material and glaze system, so the same product can be re-ordered years later for a maintenance replacement. Ask specifically:
- The body material as a technical term (vitreous china / ceramic), not "premium ceramic".
- Whether the gold line decoration is glazed into the surface or applied on top — this determines how it survives years of cleaning in a hotel room.
- Colour consistency batch control, if basins from more than one production run will appear in the same bathroom group.
Range matching: the part buyers forget to price
A single basin quoted in isolation is rarely what a project needs. The 1050 series is designed as a matched set — the 1050A one-piece washdown toilet, the 1050B freestanding pedestal basin and the 1050WC tall wall basin carry the same gold line detail, so they read as one scheme once installed. Where guest bathrooms, ensuites and powder rooms all sit on the same floor, mixing ranges is visible immediately.
A quotation that groups the whole sanitary schedule lets you see gaps: a guest WC specified with a wall-hung basin but no matching cistern frame, an ensuite where the vanity top was never priced. If your package also includes joinery, ask for the floating vanity and any countertop to be quoted against the same bathroom schedule, so basin rim heights, tap positions and cabinet widths are reconciled in one document instead of two.
If budget has to move somewhere, it is usually easier to change a secondary bathroom from the Gold Line series to a plain modern wall basin — our 1003B wall-hung basin covers the same space-saving, no-cabinet brief without the decorative line — than to downgrade every bathroom by one step.
Samples, approvals and lead time on the quotation
Ceramics photograph well and read differently in person. Before you sign a production order for more than one bathroom's worth of basins, the quote should include:
- A sample or mock-up unit, with who pays for it and whether that cost is credited against the production order.
- The approval step: which party signs off the sample, and what happens to the lead time if a change follows approval.
- Production time stated as working days from confirmed payment and approved sample — not "approximately".
- What is held for re-order. Hotel and villa projects need replacement basins after handover; confirm the model stays available and how a small re-order is priced.
Five questions to send with your enquiry
- Which exact model code is being quoted, and can you confirm it against our bathroom schedule by room number?
- What are the rough-in, drain-centre and installation-height dimensions for that model on our plumbing drawings?
- What is included with the basin — fixings, waste, trap — and what do we need to buy locally?
- Is the gold line decoration glazed in, and can you supply a sample before production?
- What freight basis and packaging standard apply, and how are ceramics loaded alongside cabinetry and lighting?
Those five questions turn a price into a comparable quotation. Suppliers who answer them cleanly usually cost less overall than the ones with the lowest unit rate, because the site variations never appear.
Send us your bathroom schedule. As a China-based manufacturer of furniture and building materials working on hotel, villa and apartment projects, SANTERSON quotes sanitary ware against your room-by-room schedule — model codes, rough-in dimensions, matching 1050 series fixtures, vanities and freight terms in one document. Email santerson@qq.com or reach us on WhatsApp +86-13928214007 to start a quotation.
Frequently asked questions
Do wall-hung basins need a supporting frame?
1050WB is fixed to the wall through its back panel, which removes the need for a vanity cabinet underneath. What your project needs behind the wall — timber stud framing, steel framing or masonry — determines the fixing detail and must be confirmed with your installer before the wall is closed.
Can 1050WB be used without a vanity?
Yes. It is designed as a no-cabinet, floor-clear installation, which is why it works well in small guest WCs and secondary bathrooms where keeping the floor visible makes the room read larger.
Does the gold line finish hold up to frequent cleaning?
The basin body is vitreous china with a smooth glaze that resists water staining and limescale, so routine wiping is enough. Because decorative lines can be applied in different ways, ask your supplier to confirm the application method in writing and approve a sample before a bulk order.
Can I mix 1050WB with basins from another series?
Physically yes — each model is quoted with its own dimensions and rough-in. Visually it is worth limiting, since the Gold Line detail is the point of the range. A common approach is to keep the Gold Line series in guest-facing bathrooms and use a plain modern wall basin in staff or utility bathrooms.