A wall-hung basin looks simple on a drawing. It is one rectangle floating above the floor, and most of the risk sits in the wall behind it. That is exactly why an early enquiry about the Wall Hung Ceramic Basin 1050WB, Luxury Gold Line Wall Mount Bathroom Sink should carry more than a product name and a quantity. The more of the list below you can answer in your first message, the fewer rounds of drawings, samples and revisions the project needs.

The 1050WB is a vitreous china wall basin with a soft trapezoid outline and a thin gold line accent. It is fixed to the wall through a back panel rather than sitting on a cabinet or a pedestal, which keeps the floor clear and makes cleaning underneath straightforward. A pre-drilled faucet hole takes care of tap assembly on site. The dense glaze is what you are really buying in a hospitality setting: it resists water staining and limescale, so daily maintenance is a wipe rather than a scrub. Catalogue dimensions for this model are listed as 495×440×390 mm, and that figure is the first number to confirm in writing.

Start with the room, not the catalogue

Before you ask for a price, decide what the basin has to do. A powder room or guest bathroom in a villa uses a wall basin very differently from a boutique hotel restroom that is wiped down several times a day. Tell the supplier the room type, the daily traffic you expect and who maintains it. That single line of context changes which finishes, which faucet height and which spare-parts plan make sense.

Then send the drawings. A reflected ceiling plan is not enough; what matters for a wall-hung basin is the wall section. Share the finished floor level, the intended rim height, the position of the waste outlet and whether the wall is stud, steel frame or masonry. If the wall will be tiled or panelled, say so, because the thickness of the finish changes the length of the waste and supply connections that have to reach through it.

Confirm the dimensions on the current technical sheet

Catalogue sizes are useful for space planning, but they are not installation drawings. Ask for the dimensional drawing for the exact production batch and check three things against your own drawings:

  • The overall envelope of the basin, so the gold line accent and the trapezoid edge clear any adjacent mirror, glass partition or door swing.
  • The centre line of the waste outlet relative to the finished wall face, since this is what sets the soil pipe position.
  • The fixing points for the back panel, and whether the framing you intend to build can carry them at those heights.

If any of these numbers are still marked as provisional on your own drawings, flag it in the enquiry. A supplier who knows a rough-in is not yet frozen can hold the order and confirm the drawing before production starts, instead of shipping against an assumption.

Decide how the basin sits in the rest of the bathroom

The 1050WB belongs to a matched series, and this is where procurement saves the most time. The same gold line detail appears on the Wall Hung Ceramic Basin 1050WC, a taller wall basin that works as a feature sink, and on the Freestanding Pedestal Basin 1050B for rooms where a floor-standing basin is preferred. The series also covers the matching one-piece WC, so guest bathrooms, master bathrooms and public restrooms in the same building can share one visual language without three separate approvals.

Send a room-by-room schedule rather than a single line item. For each location, note the basin model, the faucet style and reach you have in mind, the mirror or cabinet above it, and whether the wall will support a wall-hung fixture at all. A feature bathroom may take the tall 1050WC, while the secondary bathrooms take the 1050WB; specifying both in one enquiry keeps the glaze tone and the gold accent consistent across the building.

Be specific about quantity, phasing and packaging

Give the total quantity, then break it down by room or by phase. Bathroom basins are rarely installed in one week; a villa or hotel package usually arrives in batches so that fixtures do not sit on site unprotected. Tell the supplier which rooms come first and whether you have dry storage. Ask how the basins are packed and palletised, how many pieces per carton, and what the protection looks like for the gold line edge. Damage claims on ceramic ware turn into arguments very quickly when nobody agreed the packing standard in advance.

Also ask about spares. For a commercial project it is normal to order a small number of extra basins, or at least confirm which model stays available for replacement, so a chipped unit two years from now does not become a visible mismatch.

Agree the documents and the delivery terms in the first exchange

State your Incoterms and destination, then ask what paperwork comes with the shipment: commercial invoice, packing list and any certificates your customs broker will expect. Confirm who arranges freight, how the consignment is tracked, and where responsibility for the goods changes hands. If the basins are part of a wider fit-out package, say so in the same enquiry. Sanitary ware shares a container far more economically with interior fixtures, cabinetry and finishes ordered for the same building, and one consolidated delivery means one inspection instead of several.

Close the loop on the practical questions that decide whether a project runs to programme: when production starts after the drawing is signed off, how the shipment will be notified before it sails, what happens if a unit arrives damaged, and who supports installation once the basins are on site. You do not need promises in writing about response times to ask these questions; you need clear answers from whoever is managing your order.

What to attach to your enquiry

  • The bathroom layout and a wall section for each basin position.
  • A schedule listing model, quantity per room and required delivery phase.
  • Your chosen faucet model or reach, so the pre-drilled hole and spout projection are checked together.
  • Wall build-up details: frame type, finish thickness, tank or concealed cistern arrangement if one is used.
  • Destination port, preferred Incoterms and the documents your broker requires.
  • Photographs of a sample bathroom if you want the supplier to check the gold accent against your colour scheme.

A short checklist before you press send

  • Room type and traffic level stated for every location.
  • Dimensions requested in writing from the current technical sheet, not the catalogue page.
  • Waste centre line, supply positions and back-panel fixing points confirmed against your framing.
  • Matching series models chosen per room, with one approval covering all of them.
  • Total quantity plus phasing, packing standard and spares discussed.
  • Delivery terms, destination and required documents named.

A supplier enquiry is not a shopping list; it is the first version of the installation record. Every number you lock down before production is one site variation you will not have to solve with tiles already cut and walls already closed.

If you are specifying this basin for a villa, apartment or hospitality project, send your room schedule and wall sections to SANTERSON. As a China-based furniture and building materials manufacturer working on turnkey projects, we will check the rough-in against your drawings, confirm which pieces of the 1050 series suit each bathroom, and consolidate the basins with the rest of your fixtures into one coordinated shipment.