A submittal for MCM flexible rammed earth panel has a job that a normal stone submittal does not: it has to prove to an architect, contractor or consultant that a thin, bendable clay sheet can really deliver the layered look of a rammed earth wall on a curved surface, and stay there for years. Most packages we receive from project teams cover only colour and size, then stall at review because nobody addressed bending, fixing method or joint treatment. The checklist below is what a complete submittal for this material should contain, using our own panel as the worked example.
1. Product identification and naming
State the name once, clearly, and keep it identical on every drawing, sample label and invoice that follows. Our product is listed as MCM flexible rammed earth panel; buyers also call it soft stone panel or soft ceramic sheet, because it is a modified clay material rather than quarried stone. Using one consistent name avoids the mismatch where a consultant approves "soft stone" on paper and then rejects a delivery labelled differently.
Include the product page reference, the two colourways we hold for this line, white and earth brown, and the finish you intend to supply. If your project needs both colours on the same wall, say so in the submittal rather than at delivery.
2. What the material actually is
Reviewers who have not handled flexible clay often assume it is a vinyl film, or real stone sliced thin and glued to a backing. A one-paragraph definition removes that doubt: this is a moulded, modified clay sheet produced to reproduce the rough, stratified texture of a traditional rammed earth wall. It carries the visual character of hand-built earth, including the horizontal bands and muted tonal shifts, without the mass, thickness or wet trades of building an earth wall on site.
3. Bending capability and minimum radius
This is the section that decides whether a curved-wall design survives at all, and it is usually the thinnest part of the submittal we see. The material is thin and flexible, so it can be bent onto curved walls, cylinders and other special-shaped surfaces that rigid panels cannot wrap. What most packages leave out is the number.
Ask us for the minimum bending radius before your designer sets the curve, then put that radius in writing in the submittal alongside your own drawing of the arc or column you intend to clad. If a tight column needs a radius below what an on-site cold bend can safely reach, say how you propose to get there: pre-formed pieces, segmented facets, or a larger radius. A submittal that shows the curve and states the achievable radius gets approved; one that only says "flexible" gets queried.
4. Substrate requirements and fixing method
Flexible cladding is only as good as the surface it is bonded to, so the submittal must name the substrate and the adhesive together. Our panels are fixed directly to a sound cement base or to gypsum board with tile adhesive. The following should be stated:
- the substrate type (cement screed, plaster, gypsum board) and confirmation that it is clean, dry, flat and load-bearing;
- the adhesive type, and confirmation that it is applied so no voids are left behind a bend;
- who supplies the adhesive, and whether it ships with the panels or is sourced locally;
- the fixing sequence for curved work, agreed with us before the first sheet goes up.
For external walls and for any wall that carries moisture, name a substrate and adhesive combination suited to exposure. We will confirm what we recommend for your wall build-up instead of leaving the contractor to guess.
5. Cutting, joints and edge details
The construction advantage of this material is that it is worked on site with simple hand tools: sheets are cut to size, corners and outlets are opened out on site, and joint treatment is straightforward. That matters commercially: no heavy equipment, fewer trades on site, faster coverage per day than rigid board.
Your submittal should still show the joint strategy: whether joints are tight-butted or left open, how inside and outside corners are formed, and how the panel meets frames, skirting and reveals. Curved surfaces concentrate these details, so include one typical detail drawing for a curve and one for a straight return.
6. Weight and structural load
One of the reasons project teams specify flexible cladding is that it reduces wall load compared with thick rigid board or natural stone, and it simplifies transportation and handling on site. Give the reviewer the weight per square metre for the panel you are supplying, together with the weight of the finished build-up including adhesive and substrate. On renovation work, where an old wall is being re-clad, that figure is often what gets the design accepted.
7. Colour, texture and approval samples
Rammed earth is a textured material, so colour chips alone mislead. Request physical samples and submit them with the package: one flat sample for colour, and one sample bent over a former to show how the texture reads on a curve. Note that lighting changes this finish considerably. An earth brown wall under warm downlights in a restaurant reads very differently from the same sheet under cool daylight in a lobby.
Have the client sign off the exact sample, and record the approved sample reference in the submittal so production matches what was approved rather than a photograph on a screen.
8. Where the material is being used
A submittal reads better when it shows the reviewer that the same finish has been used in comparable settings. Our flexible rammed earth panels are specified for homestays and cultural tourism projects, ancient building renovation, exhibition halls, restaurants and retail shops, villa feature walls and exterior wall renovation. If your project is one of these, name it plainly; if you are proposing the material for a setting we have not covered, such as a wet area or a facade in a severe exposure, raise that question with us before submission rather than after.
9. Quantities, packaging and delivery
Because the sheets are thin and bendable, they pack and ship far more efficiently than rigid board, which is where part of the cost saving sits. Still, submit a proper schedule: area by wall or room, plus a cutting allowance for your curved work, which wastes more material than straight runs do. State the delivery terms that apply to your site, and confirm how the sheets are packed so they arrive flat and undamaged.
If you are coordinating this finish alongside other elements of the same fit-out, such as joinery, flooring, lighting and stone surfaces, a single supplier handling several scopes reduces the number of separate deliveries and inspections. As a one-stop furniture and building materials supplier, we supply wall finishes alongside the rest of the interior package on villa and hospitality projects.
10. Installation support and responsibility split
State who does what: supplier, installer, substrate preparer. We supply the panels, the technical guidance on bending radius and adhesive, and custom or OEM work where a project needs a specific colourway or format. On turnkey projects we also handle logistics to site, installation support and after-sales service, so the responsibility boundary is written into one contract instead of three.
11. What to verify before you submit
Submittal completeness check
- Product name identical across drawings, samples and order documents
- Minimum bending radius stated, matched to your curve drawing
- Substrate and adhesive named together, with supplier identified
- Weight per square metre for panel and finished build-up
- Signed physical samples, flat and curved
- Joint, corner and edge details drawn for both straight and curved work
- Area schedule with a cutting allowance for curves
- Responsibility split between supplier and installer stated
Send us your drawings first
Before you write the submittal, send the elevations of your curved walls and columns. We will confirm the achievable bending radius, the recommended substrate and adhesive for your wall build-up, and which of the two colourways suits your lighting, so the numbers in your package are ours on record rather than an assumption.
Related finishes on the same project
Where a design calls for a mineral finish rather than clay, our flexible wood grain cement wall panel covers curved walls and arches with a cement-based sheet that can be rolled for delivery and painted on site. For a stone look, MCM flexible travertine stone veneer replicates natural travertine in a thin, bendable sheet for interior and exterior cladding. Both are submitted the same way as the rammed earth panel: radius first, then substrate, adhesive and samples.
If you need other wall finishes coordinated with the rest of the fit-out, browse our building and construction materials range, or talk to us directly about a project package.
Request samples and bending data for your project
Contact PHILLIP. Phone / WhatsApp: +86-13928214007. Email: santerson@qq.com. Send your elevations, wall build-up and quantities, and we will return the bending radius, fixing specification and a sample set for sign-off.
Figures such as minimum bending radius, weight per square metre and adhesive type vary by format and wall build-up. The values used in your submittal should be those we confirm in writing for the panels you order.