A freestanding pedestal basin sits in the middle of a bathroom sightline, so it is one of the first fixtures a guest or homeowner notices — and one of the last items to be resolved on a project schedule. When the piece is the Freestanding Pedestal Basin 1050B, Luxury Gold Line Ceramic Stand Basin, and you want it adapted to your drawings rather than ordered straight off the shelf, the quality of your written brief decides whether production starts cleanly or stalls in a round of clarifying questions.

What follows is the practical structure we use internally when a buyer asks for a customised 1050B: the fixture data you should state up front, the decisions that actually change the manufacturing route, and the points to confirm before anyone cuts a mould or fires a kiln.

Start From What the Standard 1050B Already Is

A custom brief is easier when both sides know the baseline. As published on the product page, the standard 1050B is a slim, tapered freestanding stand basin with a gold line accent, made from high-density vitreous ceramic with a glossy glaze. It carries a single reserved tap hole for a single lever faucet, and it is held in place by back panel reinforcement fixed to the wall — no vanity unit or floor pedestal footprint beyond the basin body itself.

The published outline for this model is 460 × 360 × 850 mm. Treat that number as a starting reference rather than a fixed dimension: our own product record carries a note to confirm sizes and plumbing rough-in against the current technical data sheet, and we ask buyers to do the same before issuing setting-out drawings on site. If your architect has already drawn a niche, a tiled return wall or a fixed tap position, send that drawing with the enquiry — it is the fastest way for us to tell you what can be adjusted and what cannot.

The Brief Sections That Change Manufacturing Cost

These are the items where an incomplete answer translates directly into rework, so we list them explicitly in our order form. Each one is a decision you can make before you send the enquiry.

1. Drainage and rough-in

  • Waste outlet: state whether the site waste connection is floor or wall, and give the finished-floor level so we can confirm the fall inside the basin body.
  • Trap type and depth: measure from the finished floor to the centre of the waste socket on site, not from the slab.
  • Overflow provision: say clearly whether you want an overflow or a clean open interior face, because that changes the mould path.

2. Tapping and faucet pairing

  • Send the exact faucet model, with its datasheet and spout reach. Deck-mounted single lever is the standard arrangement for this basin; wall-mounted spouts need a different tap-hole treatment and a check on splash line.
  • If you want the tap hole repositioned or an extra hole added, say so in the first message — drilling fired vitreous ware to a new position is not the same job as specifying it before casting.

3. The gold line and glaze finish

  • Confirm whether you want the published gold line detail kept, moved, widened, or dropped entirely for a plain white body.
  • If your project palette needs a different accent tone, send a physical sample or a colour reference rather than a photograph; bathroom lighting shifts ceramic colour dramatically.
  • State the glaze expectation for the setting. Guest bathrooms and public commercial washrooms see very different wear, and high-traffic washrooms are where we ask most questions about cleaning regime.

4. Fixing method and wall build-up

  • The 1050B is secured through back panel reinforcement to the wall, so tell us what that wall is: brick, block, stud with ply backing, or a tiled framed wall. Fixings and packing differ for each.
  • Give the finished wall face dimension including tiles and adhesive, so the fixing set arrives at the right depth.
  • For partitions in public washrooms, flag it early — those situations usually need a documented fixing detail agreed with your engineer before we ship.

5. Quantity, phasing and packaging

  • Give the total quantity and the room-by-room split, since a villa master bathroom and a boutique hotel restroom floor often take different variants of the same model.
  • Tell us whether units must arrive in room-coded batches with protective crating, or in bulk for your contractor to distribute.

Keeping 1050B Inside a Matched Sanitary Suite

The 1050 model line exists as a coordinated set, and buyers usually specify it that way: the Washdown One Piece Toilet 1050A with its matching gold line inlay, plus the wall-hung basins 1050WB and 1050WC. When you brief a custom change to the stand basin, decide at the same time whether the accent and glaze change carries across the rest of the suite. A gold line altered on the basin but left as published on the WC reads as a mistake on site, even when it was deliberate.

Where a project mixes fixture types — freestanding basins in guest suites, wall-hung basins in shared washrooms — send us the room schedule with the fixture codes against it. We will tell you which items are standard catalogue pieces and which become made-to-order.

A Simple Brief Template You Can Copy

Brief itemWhat to state
Project and settingVilla, boutique hotel or commercial washroom; number of storeys; whether the room is private or public access.
Model reference1050B freestanding pedestal basin, with the product link and any revision you have already reviewed.
DimensionsPublished outline as your starting point, plus any maximum set by a niche or tiled return wall on site.
Rough-in dataWaste position and height from finished floor; water supply positions; trap type.
FaucetMaker, model, mounting type, spout reach, and whether the tap hole stays as standard.
FinishGold line kept or modified; accent reference; glaze sheen; cleaning products your team will use.
Wall conditionWall build-up and finished face dimension; fixing detail if your engineer has specified one.
Suite scopeWhich other 1050 items are on the same order, so finishes stay matched.
Quantity and phasingTotal quantity, room split, delivery batches, crating and labelling requirements.
Site constraintsLift sizes, stair widths or door thresholds the packed basin has to pass through.

What Happens After the Brief Reaches Us

SANTERSON works as a China-based manufacturer and one-stop supplier for furniture and building materials, supplying hospitality, villa and office projects since 2008. Bathroom ceramics sit inside that same scope alongside interior fixtures, cabinetry, lighting, flooring and wall finishes, which is why a single fixture enquiry usually arrives with the rest of the washroom package attached.

For a customised item, our sequence follows the cooperation steps published on our services pages: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Before an order is released we send back a confirmed specification for signature — dimensions, finish, rough-in, packing — so that what your site team sets out matches what leaves the works.

A useful rule of thumb: if your brief answers where the waste lands, which faucet sits on the deck, and whether the gold line stays, most of the production questions are already closed before we open the order file. The remaining conversation is scheduling and packing.

Points to Confirm Before You Sign Off

  • Re-measure rough-in on site at finished floor level, after tiling, not from the construction drawing.
  • Approve a written specification that states dimensions and finish explicitly; verbal agreements about "the same gold as the photo" do not survive handover.
  • Check local plumbing and building requirements for your jurisdiction with your own engineer or certifier. We supply the fixture data; compliance sign-off in your country is your side of the job, and we do not claim certification we have not been issued.
  • Agree inspection at receipt: check glaze, gold line continuity and fixing points before your tiler closes the wall behind it.

Product dimensions, glaze options and rough-in figures quoted above follow the current published product page. Where your project depends on a precise figure, request the technical data sheet for that production batch rather than relying on the website listing.

If you are specifying customised freestanding basins for a villa or hospitality project, send us the room schedule and rough-in information and we will confirm what is standard and what is made to order. Enquiries reach our team through the contact page, and we reply with a specification sheet rather than a generic catalogue.