A swim spa the size of a large wardrobe footprint, deep enough to sit in, and packed with jets — that is what the catalogue entry for Outdoor Swim Spa WS-S04B describes. It is also exactly the kind of product where a buyer's approval email and the finished crate can disagree, because most of what matters is decided after the catalogue page: which pumps are wired in, how the shell is supported, what the power supply has to carry, and who signs off on the drawing before tooling starts.
If you are specifying one unit for a villa terrace or a small batch for a resort or wellness floor, the questions below are the ones worth settling with your supplier before production begins. Each one changes either the price, the shipping method, or whether the unit works once it arrives on site.
1. Start from the shell size and how it will be supported
The catalogue lists WS-S04B at 3900 × 2200 × 1450 mm. Two numbers in that line do real work. The 3900 mm length puts the unit inside a tight terrace or an indoor plant room rather than a long lap channel, and the 1450 mm depth means an adult can sit with water to shoulder height — useful for hydrotherapy seating, but it also raises the dead load once the shell is full.
Before anything else is confirmed, get three things on paper:
- The finished external dimensions your supplier will build to, including the cabinet cladding and any steps, not just the acrylic shell.
- The filled weight and the required support structure — a continuous concrete slab, a steel frame, or a reinforced timber deck. Ask which one the design assumes.
- Whether the site is ground level, on a slab, or elevated. An elevated terrace needs a structural engineer's sign-off from your side; that decision should be made before you lock the order, not after delivery.
Send your supplier a simple dimensioned sketch of the location with access routes marked. A unit that fits the finished opening but cannot be carried through the gate or lifted to the level is a very expensive mistake to discover at handover.
2. Confirm what is in the water system, item by item
The published specification for WS-S04B shows one control system, three water pumps, one filter pump, 31 jets with 6 water columns, and two LED lights plus 28 small LED lights. Treat that as the reference build, not as a promise about your unit. The catalogue also lists options such as UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps — and availability changes between configurations.
Ask for a written bill of materials against your order, stating:
- Pump count and duty for each pump: which unit drives the jets, which drives the water columns, which runs filtration.
- The jet layout on the actual shell drawing — 31 jets is only useful if their positions match how the seats will be used.
- Whether ozone is included as standard or offered as an upgrade, and whether UV sterilisation is added on top.
- Filtration type: cartridge or sand, plus the run time the control system defaults to.
If you are buying several units for a hotel or club project, insist that every unit in the batch is built to one signed configuration sheet. Mixed equipment across rooms turns into a maintenance problem for the operator within a year.
3. Settle the electrical supply before production, not on site
The catalogue figure for WS-S04B is 10.35 kW total power. That number is only a starting point for an electrician — what matters is how it is delivered. Confirm with your supplier:
- Voltage and phase for the destination market, and whether the control system, pumps and any added heat pump are all supplied on that same service.
- Circuit sizing, protection device rating and where the local disconnect should sit relative to the shell.
- Whether a heat pump is included or excluded from the quoted power figure. Adding one later changes both the load and the cable you have already run.
- Which side supplies the dedicated electrical connection and which side supplies the equipment — your contractor or the factory.
This is the most common point where a project loses time. The spa can be finished and crated while the site still cannot energise it, so make the electrical drawing part of the pre-production approval pack.
4. Decide what "custom" actually covers on this model
The same range includes configurable options, and Santerson also publishes a Customizable Shape Outdoor Spa for projects that need square, round, oval or curved shells instead of a standard mould. Those are two different conversations, and the cost difference is large.
| Decision | Standard model route | Fully custom route |
|---|---|---|
| Shell geometry | Existing mould, catalogue dimensions | New shape to suit the space |
| Equipment | Reference build plus catalog options | Specified per project configuration sheet |
| Finish and cladding | Catalogue cabinet finishes | Bespoke material and colour to match the scheme |
| Approval needed | Configuration sheet sign-off | Drawing plus prototype or sample sign-off |
For a single villa, the standard model with selected options is usually enough. For a resort where the spa has to sit inside a designed landscape or match other joinery, put the custom route in front of your supplier early — Custom & OEM Service covers bespoke finishes and prototypes, but it adds approval steps you need to build into the programme.
5. Agree the inspection points before tooling starts
A swim spa is a pressure vessel full of water sitting on your structure, so pre-shipment checks are worth more than photographs of a finished showroom unit. Ask which checkpoints are included:
- Signed configuration sheet with model, dimensions, pump schedule and jet layout.
- Shell and cabinet inspection before the cladding is closed up.
- Full fill and jet test, with the unit running long enough to check for leaks at every joint.
- Electrical test report matched to the voltage and phase you specified.
- Packaging method, crate dimensions and lifting points for your freight plan.
Then confirm what happens after delivery. The service scope on this site covers installation support, inspection and snags, spare parts and maintenance — but the practical details, such as who installs on site in your country and which parts are stocked versus made to order, should be written into the order before you sign.
6. Check neighbouring models so you pick once
It is easy to commit to a model and then find a closer fit next to it in the same range. Within the S04 family, WS-S04 is listed at 4090 × 2200 × 1110 mm with a waterfall feature and 8.25 kW total power, while WS-S04X is listed at 3990 × 2260 × 950 mm with a shallower shell. WS-S04B, by contrast, is the deeper of the three at 1450 mm and is shown without a waterfall in the catalogue.
Those differences matter when you are matching a user brief: a deeper shell suits seated hydrotherapy, while a shallower one suits reclining. If your project needs longer swimming distance rather than a compact deep shell, larger models such as WS-S06B at 5800 × 2200 × 1250 mm sit further up the range, and the full list is in Swimming Pools and Swim Spas. Compare two or three candidates on paper before you start asking for a production slot.
A short pre-production checklist
- Finished external dimensions and access route confirmed against the site drawing.
- Filled weight and support structure agreed with the engineer on your side.
- Bill of materials signed: pumps, jets, water columns, lighting, ozone, filtration.
- Voltage, phase and circuit sizing confirmed; heat pump inclusion stated in writing.
- Standard versus custom route chosen, with approval steps in the programme.
- Fill test, jet test and electrical report named as pre-shipment checkpoints.
- Crate size, lifting points and delivery terms agreed with your freight plan.
- Installation responsibility and spare-parts supply defined before signature.
Note: dimensions, equipment counts and power figures quoted here are the catalogue values published for each model. Options and included equipment vary by configuration, so confirm the specification for your own order in writing before production begins.
Send us your site drawing and target configuration. We will return a configuration sheet with dimensions, pump schedule, power requirement and packaging details for WS-S04B, or point you to the closest model in the range if your space or brief calls for something else.
Talk to us through SANTERSON, or review the full range under Swimming Pools and Swim Spas.