A wall-hung basin looks simple on a drawing. It is a bowl fixed to a wall, a tap above it and a waste below. What makes it fail on site is never the basin itself — it is the frame behind the plasterboard, the height the rim ends up at, the trap that no one confirmed against the floor slab, and the tap hole that was drilled before the mixer was chosen. The Wall Hung Ceramic Basin 1050WB from the Luxury Gold Line reduces several of those unknowns, because it arrives with a defined outline, a pre-drilled faucet hole and a back panel that carries the load into the wall. The rest still has to be planned by you.

This article sets out what a complete installation plan for this basin should contain, in the order a project team actually needs it: fixing method first, then dimensioning, then drainage and supply, then coordination with the rest of the suite, and finally the checks before tiles go on.

Wall Hung Ceramic Basin 1050WB with gold line detail, installed as a wall mount bathroom sink
Model 1050WB: soft trapezoid body with a gold line accent, fixed to the wall by its back panel.

Start With the Fixing Method, Not the Basin

The 1050WB is a wall-mounted basin secured through its back panel, with no pedestal and no vanity unit underneath. That single decision drives everything else in the plan, because the wall becomes the structure that carries a wet, loaded basin day after day.

Before any setting-out drawing is issued, record which of these two situations the room is in:

  • An masonry wall. Solid brick or block needs anchors and a level, sound face. Confirm the substrate can take the fixing pattern of the back panel, and confirm the plaster or render behind the tile is not hollow.
  • A stud or partition wall. The cavity framing must be designed for the load before the board goes on — a reinforcement frame set at the height of the basin's back panel, not added afterwards. Once the wall is closed, adding support means opening it again.

The same applies to any wall-hung fixture in the room. If the plan also includes a wall-hung WC or a tall wall-mounted basin such as 1050WC, every one of those items needs its own support frame resolved at framing stage. Teams that treat the basin as a "finish-stage item" are the ones who end up cutting back finished tile work.

Dimensioning: What Has to Be on the Setting-Out Drawing

The catalogue records 1050WB as 495 mm wide, 440 mm deep and 390 mm high. Use those figures for space planning, then confirm them against the technical sheet that ships with your order before you dimension anything fixed — tile set-out, niche positions, mirror centres or glass screens are all expensive to change later.

Catalogue outline495 × 440 × 390 mm (width × depth × height)
MountingWall-mounted, fixed by back panel; no pedestal or cabinet required
Faucet provisionPre-drilled faucet hole for single-mixer assembly
Body and glazeVitreous china with a smooth, dense glaze
ShapeSoft trapezoid silhouette, gold line ornament
Under-basin zoneFloor left clear; waste and supply run in the wall or floor

Beyond the outline, four measurements decide whether the finished installation feels right or feels wrong to use:

  • Rim height. Fix one number for the top of the basin and put it on the drawing as a reduced level. A wall-hung basin gives you that freedom precisely because nothing fixes it to floor height — but if nobody writes the number down, the fitter will improvise, and guest bathrooms with two basins at slightly different heights are immediately obvious.
  • Projection from the finished face of the wall. Depth is 440 mm, so allow for the build-up: waterproofing, adhesive and tile thickness all move the finished face outward. Measure from the finished face, not from the bare substrate.
  • Clearance to side walls and screens. The trapezoid form reads cleanly when it has air around it. Squeezing it between two tiled returns costs you the elbow room people expect at a washbasin.
  • Spill zone behind the basin. Where the back panel meets the wall, the tile must run down to the ceramic and be sealed. Plan that junction on paper; do not leave it for silicone on site.

Sizes, trap type and rough-in dimensions should always be re-checked against the current technical sheet for the order. Catalogue figures describe the basin, not your wall build-up or your drainage layout.

Drainage and Water Supply: Resolve These Before the Wall Closes

Waste and trap

A basin with no pedestal hides its plumbing, which means the trap position has to be designed rather than discovered. Decide and draw:

  • The waste outlet position relative to the finished wall face and to floor level.
  • Whether the waste drops into the floor or returns through the wall — this depends on the slab or cavity available, and it changes what the fitter can achieve without chasing finished work.
  • The trap type and its access. Concealing a trap completely is poor planning: blockages happen in hotel rooms and villa guest bathrooms alike, and someone has to open that connection later without destroying the finish.

Supply lines and the tap hole

The 1050WB comes with a pre-drilled faucet hole for quick tap assembly, which removes one on-site operation — but it also fixes where the mixer sits. Choose the tap before the wall is closed, because the hot and cold outlets have to meet that hole in plan and in height. Record on the drawing:

  • Hot and cold outlet centres and their height above finished floor.
  • Spout reach relative to the basin's 440 mm depth, so water lands in the bowl rather than on the rim or the mirror.
  • Whether an overflow is required by the project specification, and whether the selected waste matches it.

Coordinate the Basin With the Rest of the Bathroom

1050WB belongs to the 1050 matching sanitary collection, which is the practical reason buyers specify it rather than an isolated bowl. The suite gives a procurement and design package with one gold line detail running through every piece:

  • Washdown One Piece Toilet 1050A — the same gold line inlay, with both P-trap and S-trap rough-in options so a single suite can serve rooms whose drains are in the wall and rooms whose drains are in the floor.
  • Freestanding Pedestal Basin 1050B — for main bathrooms where a floor-standing basin is preferred and the wall build-up can be avoided entirely.
  • Wall Hung Ceramic Basin 1050WC — a tall, slim wall basin used as a feature sink in powder rooms and villa guest bathrooms.

That mix matters on real projects. A boutique hotel typically uses the wall-hung 1050WB in guest bathrooms where the floor needs to stay clear for cleaning, the pedestal 1050B in larger master bathrooms, and the tall 1050WC as a statement piece in the reception powder room — one gold line detail, three fixing conditions. Specify them as one suite and the visual language holds; order them separately across different lots and it usually does not.

Because the wall-hung form leaves the floor open, housekeeping can mop under the basin without working around a pedestal, and the open floor makes a small bathroom read larger than it is. Those are the two arguments that win this specification in hotel and commercial bathroom projects, where secondary bathrooms are tight and cleaned daily.

Maintenance, Finish and Handover Notes

The glaze on vitreous china is what does the work in service: a dense, smooth surface resists water staining, limescale and yellowing, so routine cleaning is wiping with a soft cloth and a mild detergent. Two things shorten the life of that finish, and both belong in the handover document rather than in someone's memory:

  • Abrasive pads, scouring powders and strong acid cleaners attack the glaze and dull the gold line detail. Say so explicitly in the maintenance instructions you hand to a facilities team.
  • Where water is hard, descaling frequency should be written into the maintenance schedule instead of being improvised by whoever cleans the room.

Include a short snag list with the installation: fixing security once the basin is in use, seal integrity at the wall junction and around the tap, and waste connections tested under a full bowl.

The Installation Plan Checklist

  • Wall type confirmed — masonry or framed partition — with support designed for the back panel at basin height.
  • Rim height written as a reduced level on the setting-out drawing, and repeated for every basin in a pair.
  • Outline dimensions taken from the current technical sheet, not assumed from the catalogue.
  • Finished wall face established, including waterproofing, adhesive and tile build-up.
  • Waste outlet position, trap type and access point drawn before the wall closes.
  • Tap selected first; hot and cold outlet centres set to the pre-drilled hole; spout reach checked against basin depth.
  • Overflow requirement and matching waste confirmed against project specification.
  • Suite coordinated with 1050A, 1050B and 1050WC where the design calls for one matching collection.
  • Tile-to-ceramic junctions planned and sealed, not left to site silicone.
  • Maintenance instructions issued in writing, covering cleaning agents and descaling interval.

Ordering as Part of a Project Package

Basins rarely travel alone on a fit-out. When the same order carries interior fixtures such as mirror cabinets, vanity units and shower systems alongside the sanitary ware, one supplier handles the specification sheet, the packing list and the delivery window instead of three. SANTERSON works as a one-stop furniture and building materials supplier for villa, hospitality and office projects, covering product specification, production, door-to-door logistics and installation support — which is where rough-in drawings, spare gaskets and replacement bowls get resolved instead of becoming site arguments.

Send the room layout, the wall build-up detail and your preferred rim height with the enquiry. Those three inputs let the supplier confirm which 1050 pieces fit which walls, and flag drainage conflicts while they are still lines on a drawing rather than broken tile.

Planning a bathroom package? Send us your room dimensions, wall construction and rim height. We will confirm which Luxury Gold Line pieces suit each wall condition, and quote the suite — basins, WC and matching fixtures — as one delivery.

Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com