A wall-hung basin looks simple on a schedule, yet it is one of the few bathroom items where three separate decisions have to line up at once: the clay body underneath the glaze, the surface finish that housekeeping will scrub every day, and the shape that has to clear the faucet, the trap and the guest's elbows. This guide uses the Wall Hung Ceramic Basin 1004B as the reference model and compares it against the other wall-mounted sinks in our catalogue, so buyers, contractors and interior teams can specify on evidence rather than on a photograph.
What the 1004B Actually Is Before You Compare Finishes
The 1004B is a wall-hung basin in the 1004 sanitary series, fixed to the wall by its back panel rather than by a pedestal or a vanity carcass. The published page description lists it at 510×420×380 mm with a trapezoid silhouette, a single tap hole for a single-hole faucet, and a glossy glaze over vitreous ceramic. It is specified for home renovations, apartments, hotels and public washrooms, and it can be paired within the same series with the 1004A one-piece toilet and the 1004S freestanding pedestal basin when a project needs matched ceramics across several bathroom types.
Those two words that matter most for comparison are vitreous ceramic and back-panel fixing. Everything else — the trapezoid plan, the gloss level, whether or not there is a gold line on the rim — is a decision you make per room type. Get the body and the fixing method right first, because neither can be changed after the wall is closed up.
Published dimensions for 1004B: 510 mm wide × 420 mm projection × 380 mm high. Treat these as catalogue figures and confirm them, together with waste position and water-supply rough-in, against the current technical sheet before any wall is set out.
Material Comparison: What "Vitreous Ceramic" Means on a Purchase Order
Every wall-hung basin in our range is described as vitreous ceramic or vitreous china. That single term answers most of the practical questions a specifier asks, because it describes a fired clay body that has been brought to near-zero water absorption and then covered with a glassy glaze. The consequences are concrete:
- Water absorption. A vitreous body does not drink water through the glaze, so the basin does not saturate, crack from freeze-thaw stress in unheated washrooms, or develop the odour that comes from a porous body behind a chipped glaze.
- Surface hardness. The glaze is the wearing layer. Housekeeping abrasion, hair-dye residues, and daily contact with taps all act on the glaze, not on the clay.
- Edge integrity. A dense body holds a crisp rim. Warped or soft rims are what cause basins to sit out of true against a tiled wall.
Where products genuinely differ is in the density and thickness of that glaze layer, and in how much of the visible surface is glazed. The 1004B page calls out a "dense glazed layer" that resists water stain and limescale; the 1003B and 1051B pages use the same logic, adding resistance to yellowing. If you are comparing two basins from different suppliers and both say "ceramic", ask what the glaze covers, how many firings it takes, and whether the underside — the part visible under a wall-hung rim in a hotel washroom — is finished to the same standard as the deck.
Cast stone, solid surface and glass basins behave differently again, and we supply those through separate product families rather than in this series. For high-traffic guest washrooms, ceramic with a dense glaze remains the default because a damaged unit is replaced identically at any point in the building's life; a solid-surface colour matched to a batch five years later is a different procurement problem.
Finish Comparison: Gloss, Matt and Metallic Decoration
Within our own catalogue you can compare finishes on like-for-like bodies, which is the cleanest comparison available to a buyer.
| Model | Shape and size (published) | Finish and decoration | Where it works |
|---|---|---|---|
| Wall Hung Ceramic Basin 1004B | Trapezoid, 510×420×380 mm, single tap hole | Glossy clear glaze, no applied decoration | Apartments, hotels, public washrooms — the highest-frequency cleaning case |
| Wall Hung Ceramic Basin 1051B | Curved, 400×380×450 mm, tap hole reserved | Glossy glaze, plain | Compact bathrooms and boutique hotel rooms where projection is tight |
| Wall Hung Ceramic Basin 1050WB | Soft trapezoid, 495×440×390 mm, pre-drilled faucet hole | Glossy glaze with gold line ornament | Boutique hotels, luxury apartments, villa secondary bathrooms |
| Wall Hung Ceramic Basin 1050WC | Tall vertical body, 410×340×620 mm, pre-drilled faucet hole | High-density vitreous ceramic with gold line accent | Feature bathrooms where the basin is a visual element, not just a fixture |
| Wall Hung Basin 1038WB | Streamlined modern form, depth specified to limit splashing | High-grade vitreous ceramic, plain | Guest washrooms and commercial restrooms ordered in volume |
| Wall Hung Ceramic Basin 1003B | Tapered curved outline, single-faucet mounting area | Glossy glaze stated to resist stain, limescale and yellowing | Villas and residential renovations in the 1003 suite |
Read that table as a finish ladder rather than a price ladder. The plain glossy models — 1004B, 1051B, 1003B, 1038WB — carry no applied decoration, so the only surface to maintain is the glaze itself. The Gold Line models add a metallic decoration line, which changes two things: the look reads as intentional luxury at close range, and the decoration becomes a place housekeeping must be told about, because abrasive powders and acidic descalers are what lift edge decoration long before they dull the glaze beside it.
Gloss versus Matt
The wall-hung basins in this series are glossy. That is a maintenance decision, not only an aesthetic one: a smooth glassy surface gives limescale nothing to grip, and the 1004B page states the dense glazed layer resists water stain and limescale build-up, which is exactly what you want in hard-water regions and in washrooms cleaned by staff on a rota rather than by an owner. A matt or textured surface hides water spots better between cleans but holds deposits harder when they do form, and it shows streaking from cloth cleaning.
If your project calls for a soft-touch matt basin, that is a custom finish conversation, not a catalogue swap. Our Custom & OEM Service covers bespoke finishes, textures and materials, with prototyping before production, so a specified surface can be sampled on the actual body shape rather than on a test tile.
Shape and Size Comparison: The Dimension That Drives Everything Else
Comparing finishes is safe work; comparing shapes is where specification errors get expensive. Three numbers decide whether the 1004B fits your wall:
- Projection (420 mm on the 1004B). This sets how far the basin sits into the room and therefore the clear circulation in front of it. The 1051B at 380 mm and the 1050WC at 340 mm exist precisely because some guest rooms cannot absorb a 420 mm projection beside a door swing.
- Height (380 mm on the 1004B). Rim height interacts with faucet selection and with the height of the waste connection behind the wall. A tall body such as the 620 mm 1050WC is a deliberate visual choice that also changes where pipework lands.
- Bowl depth and rim geometry. The 1038WB page states its depth is set to prevent splashing. A shallow, wide trapezoid deck reads modern but has to be judged against actual hand-washing use and against the tap spout reach you have specified.
The trapezoid plan of the 1004B is worth understanding as a trade-off. The wider front edge gives more usable deck area for soap and glassware than a rounded bowl of the same projection, and it sits cleanly against a straight tiled wall or a mirror. The cost is that the two rear corners are the parts of any basin that get wiped least often, so a dense glaze with no decoration in those corners makes life easier for housekeeping.
How the Finish Behaves Under Hotel Housekeeping
In a residential bathroom a basin is cleaned by one household using one product. In a hotel or serviced-apartment washroom it is cleaned daily by different staff, with whatever descaler is stocked that week, on a schedule measured in minutes per room. That is the real test of a finish, and it is why we recommend specifying finishes by cleaning regime rather than by sample board.
For that case the plain glossy 1004B is the least demanding option in our wall-hung range: no decoration line to protect, no texture to trap deposits, and a stated resistance to water stain and limescale. Where a project wants visible luxury in guest bathrooms, use the Gold Line pieces in lower-frequency rooms — villa secondary bathrooms, suites, penthouse guest WCs — and keep the plain glossy model in the standard rooms and public washrooms. That single split keeps one cleaning protocol simple across most of the building while still giving feature rooms a distinct finish.
Pairing the Basin with the Rest of the Bathroom
Basin finish does not sit alone. Two comparisons matter once the surface is chosen:
Matched suites. The 1004B belongs to a series that includes the 1004A one-piece toilet and the 1004S freestanding pedestal basin, plus the wall-hung 1004F bidet, which the product page describes as combining with matched toilets and wash basins to form a complete sanitary set. Ordering one series across a project means the glaze tone, rim radius and tap-hole geometry are consistent from guest bathroom to public washroom, and replacements come from the same tooling. The 1050 Gold Line and 1051 series work the same way.
Vanity and counter alternatives. Not every wall-hung decision is a ceramic decision. A Santerson Floating Vanity is made to measure with material and finish options, so the carcass can be matched to joinery elsewhere in the project while the basin above it stays ceramic. Where a counter is required instead, our undermount and vessel basin options are specified against the cut-out and the counter material, which is a separate coordination task from wall fixing.
For procurement, that comparison belongs in one conversation rather than three. The Bathroom Sanitary Fixtures range is ordered alongside vanities, shower systems, lighting, wall panels and flooring on the same project schedule, so a finish decision taken for one basin can be carried consistently through every bathroom in the building.
A Buyer's Checklist Before You Order Wall Hung Basins
- Confirm the published catalogue dimensions against the current technical sheet, then set out the wall from the sheet, not from the brochure.
- Confirm waste position, trap type and water rough-in for the exact model; the same series can differ between wall-hung and pedestal versions.
- Confirm tap-hole count and diameter against the faucet you have specified — the 1004B is described for a single-faucet installation.
- Decide the finish by cleaning regime: plain glossy glaze for high-frequency rooms, decorated Gold Line pieces for feature rooms, with a written housekeeping instruction wherever decoration is applied.
- Order matched series items together — basin, toilet, bidet, pedestal version — so glaze tone and geometry stay consistent across the project.
- Confirm the supporting wall assembly and fixing carrier with the contractor before tiles are set.
- Order a physical sample of the chosen finish for on-site comparison against tile, counter and hardware under the actual lighting.
Ordering and Project Supply
We manufacture and supply these basins as part of a one-stop programme that covers design coordination, custom and OEM production, packing and container loading, freight by sea, air or rail with customs paperwork, door-to-door delivery, then installation support and after-sales service including spare parts. That matters for ceramics specifically: a project that has to top up two basins eighteen months after handover needs the same tooling and the same glaze batch behaviour, and it is far easier to protect when the original order was placed with the manufacturer rather than through a chain of resellers.
Send us the room schedule — model, quantity per room type, water hardness at site, and who will clean each washroom — and we will confirm which of the six basins above fits each case, what has to be sampled before production, and what the wall assembly needs from your contractor.
Compare 1004B finishes for your project
Talk to PHILLIP about wall-hung basin selection, matched sanitary suites and custom finishes for hotel, villa and apartment projects. Phone / WhatsApp: +86-13928214007 · Email: santerson@qq.com · Enquiries through our Contact page.