A wall-hung basin looks identical in three different quotations. The samples arrive, they look similar on the bench, and then a project buyer is expected to choose between prices that may differ by a wide margin. That difficulty is exactly why comparing Wall Hung Ceramic Basin 1004B, Modern Wall Mount Bathroom Sink against competing offers needs a written checklist rather than a glance at a photograph. The paragraphs below follow the order most procurement teams actually work in: confirm the specification, inspect the physical sample, price what is genuinely included, and only then compare unit rates.
Start From the Specification Sheet, Not the Photograph
The published data for the 1004B wall hung basin gives an overall size of 510×420×380 mm, a trapezoid body, a single tap hole for one faucet, and a vitreous ceramic body with a glossy glaze. It is fixed to the wall through its back panel rather than a cabinet or a pedestal, and it sits inside the 1004 sanitary series alongside the Washdown One Piece Toilet 1004A, the Wall Hung Bidet 1004F and the Freestanding Ceramic Pedestal Basin 1004S.
Before any sample is ordered, send each supplier that same list of points and ask them to confirm it line by line in writing. Suppliers frequently quote a visually similar basin from a different series, and the difference only surfaces once fixtures are on site and the toilet, bidet and basins no longer read as one family. A single reply that states model number, overall dimensions, tap hole count and the matching items in the series removes most of that risk.
What to Physically Check on the Sample
Once a sample of the 1004B is in hand, work through the checks below with all samples from all suppliers side by side. Comparing one basin at a time is how subtle differences get missed.
Glaze and body
- Glaze coverage. Run your hand over the inside of the bowl and the underside of the rim. A dense, continuous glaze is what resists water staining, limescale and yellowing; thin or patchy glazing shows up as a dry, matte feel on hidden surfaces.
- Underside finishing. Turn the basin over. Casting marks, rough grinding and exposed clay on surfaces you will see from below are a sign of rushed finishing.
- Colour consistency. Hold two samples from the same supplier together under daylight. A visible grey or cream cast between units of one batch shows up badly once a row of basins is installed in guest rooms along one corridor.
Tap hole and faucet fit
- The 1004B carries one tap hole for a single faucet. Confirm the hole position against the faucet you intend to specify, including spout reach, so water lands in the bowl rather than on the deck.
- Check the bowl depth and front edge for splash control at normal flow. A shallow basin looks elegant in a photo and is annoying in a shared bathroom.
Wall fixing
- The back panel is what carries the load. Ask which fixings are supplied, and confirm the bracket pattern before the wall framing or tiling is set out.
- Test-fit the sample against a timber or steel stud setup if your project uses a framed wall. The gap between basin back and finished wall surface decides whether the unit sits flush.
Read the Proposal Line by Line, Not the Bottom Number
Two proposals for the same model can both be correct and still not be comparable. The items below are where the difference usually hides.
| Line item | Question to put in writing |
|---|---|
| Packaging | Is each basin individually boxed with corner protection, and what is the breakage claim process on arrival? |
| Faucet and waste | Are the faucet, pop-up waste and trap included or priced as extras? A bare basin and a fitted set are not the same quotation. |
| Fixings | Which wall fixings and seals are supplied with each unit? |
| Series pairing | Can the supplier also quote the 1004A toilet, 1004F bidet and 1004S stand basin from the same series, on the same shipment? |
| Customisation | If a project needs a different finish or size, what does the custom and OEM service cover, and what changes the tooling cost? |
| Delivery scope | Is freight, customs paperwork and door-to-door delivery included, or is the price ex-works? The logistics page lists sea, air and rail forwarding with documentation. |
| After-sales | What happens to a damaged or mismatched unit after the container has been opened, and who supplies replacements? |
| Lead time | What is the production window for the full quantity, and does a partial batch ship first? |
Price per piece is only meaningful once every row above has an answer. A lower unit rate that excludes faucets, fixings and freight usually costs more by the time the goods reach site than a fuller quotation with a higher headline number.
Comparing Within the Same Series and Across Alternatives
Buyers often ask whether to standardise on one wall-hung basin across a whole project or mix models by room type. Both approaches are workable; what matters is that the decision is made deliberately.
| Model | Character in the catalogue | Where it usually goes |
|---|---|---|
| Wall Hung Ceramic Basin 1004B, Modern Wall Mount Bathroom Sink | Trapezoid body, 510×420×380 mm, single tap hole, back-panel wall fixing | Principal bathrooms and guest bathrooms in villas and apartments, hotel rooms where a matching toilet and bidet are specified |
| Wall Hung Ceramic Basin 1003B, Modern Wall Mount Bathroom Sink | Tapered curved outline, no cabinet required, same vitreous ceramic and glaze | Compact bathrooms where a softer outline is preferred; pairs with the matching 1003 series toilet and bidet |
| Wall Hung Ceramic Basin 1051B, Modern Wall Mount Bathroom Sink | Gentle curved shape, 400×380×450 mm, back-panel fixing, floor left clear underneath | Small en-suites and boutique hotel bathrooms where the taller body suits the counter-free layout |
| Wall Hung Ceramic Basin 1050WB, Luxury Gold Line Wall Mount Bathroom Sink | Soft trapezoid with gold line accent, 495×440×390 mm, part of the 1050 set | Secondary villa bathrooms and boutique hotel rooms where a decorative detail is wanted |
| Wall Hung Ceramic Basin 1050WC, Luxury Gold Line Wall Mount Sink | Tall vertical body, 410×340×620 mm, gold line accent | Feature and powder rooms used as a visual focal point |
| Wall Hung Basin 1038WB, Ceramic Wall Mounted Wash Basin for Bathroom | Streamlined modern shape with depth to limit splashing, back-panel fixing | Guest washrooms and commercial restrooms specified in bulk |
If you shortlist more than one of these, order a sample of each and place them together. Dimensions that read as close on paper often look quite different once mounted at the same height on a wall.
Plan the Basin With the Rest of the Bathroom
A wall-hung basin rarely fails on its own; it fails in combination. Before you sign off a sample, check it against the other elements in the same room.
- Toilet. The 1004B pairs with the one-piece Washdown One Piece Toilet 1004A. That toilet lists both a P-trap wall drain and an S-trap floor drain option, so confirm which outlet your drawings call for before ordering.
- Bidet. Where a bidet is part of the specification, the Wall Hung Bidet 1004F shares the same series language and back-panel mounting.
- Stand basin for other rooms. The Freestanding Ceramic Pedestal Basin 1004S carries the same square styling with a 400 mm footprint, which keeps secondary bathrooms consistent without repeating the wall-hung unit everywhere.
- Vanity. If some rooms use a cabinet rather than a wall-hung unit, Santerson Floating Vanity is specified with project dimensions and finish options, so the two approaches can be matched in one order.
- Shower. The Modern Rainfall Shower System with Handheld Sprayer covers the wet side of the same room, with an overhead rainfall head and a handheld sprayer on a slide bar.
- Catalogue range. Browsing the full Bathroom Sanitary Fixtures category is quicker than chasing individual datasheets when you need to confirm that a series covers every room type on the floor plan.
A Six-Step Comparison Checklist
- Issue one specification to every supplier. Model, dimensions, tap hole count, glaze expectation, wall fixing method and the matching series items. Same document to all bidders.
- Order at least two samples per shortlisted model. Two units from the same batch reveal colour and glaze variation that a single sample hides.
- Inspect blind. Number the samples and score glaze, underside finishing, colour match and fixing hardware before you know which supplier sent which.
- Test-fit against your wall build. Stud spacing, finished wall thickness and waste position must all clear the back panel and fixings.
- Normalise the quotations. Add faucets, wastes, fixings, packaging, freight and documentation into one landed figure per bathroom set rather than per piece.
- Confirm the after-sales terms in writing. Breakage claims, replacement supply and who pays for return freight should be settled before the order, not after the container is opened.
Common Comparison Mistakes
- Comparing a basin against a basin set. One quotation includes faucet and waste, the other does not. Put every quotation into the same "per complete bathroom set" column before comparing.
- Accepting a lookalike model. A supplier may offer a visually close unit from another series at a lower price. If the project requires matching toilets and bidets, that saving disappears when the pieces are installed together.
- Judging glaze by eye only. Feel the hidden surfaces and compare two units from the same batch; a single well-lit sample tells you very little.
- Skipping the fixing test. Wall-hung units depend on the wall behind the tiles. A sample that never meets a stud setup is an unfinished evaluation.
- Leaving freight and claims out of the comparison. The landed cost and the replacement route are part of the price.
Turning the Comparison Into an Order
Once one supplier has answered every line above, place a pilot order for a representative bathroom before committing the full quantity. That single room tests the glaze against your water, the faucet combination, the wall fixing detail and the packaging route under real conditions. It costs far less than re-ordering basins across a whole floor after the fact.
For projects that need basins, toilets, vanities, showers, lighting, flooring and joinery coordinated rather than sourced separately, a single supplier handling production, documentation and delivery reduces the number of handovers on site. The one-stop solution service covers design consultation, material selection, manufacturing and project coordination through to installation, and enquiries can be raised through the contact page.
Request a 1004B sample and a written specification confirmation. Send your drawings, room schedule and target delivery location, and ask for the technical drawing, fixing details and a landed quotation per complete bathroom set. Compare that document against every other bid line by line, and the price difference will explain itself.