A swim spa that arrives complete is one you can actually switch on. A swim spa that arrives as a shell, a pump and a promise is a project you finish paying for. The checklist below is the one we ask buyers to work through before they confirm an Outdoor Swim Spa WS-S04 — and it works just as well for any model in our swimming pool and swim spa range.
1. The shell: footprint, depth and water depth
Start with the outside dimensions against the slab or deck you have prepared, then check the internal water depth separately. Catalogue dimensions describe the cabinet; they do not tell you how deep you can sit, and they do not include steps, coping or clearance for access panels.
| Item to confirm | Why it matters |
|---|---|
| Overall length, width, height | Determines the pad size, the delivery route and whether a crane or hiab is needed on site. |
| Internal water depth | Sets what the spa is good for — seated hydrotherapy, standing soaks, or lap-style swimming. |
| Shell material and reinforcement | An acrylic shell with structural reinforcement behaves differently under ground movement than an unreinforced basin. |
| Access panel locations | Pumps, filters and controls need reachable service points, not panels buried behind a finished wall. |
2. The water system: pumps, jets and what is actually included
Jet counts sell spas; pump layout runs them. For the WS-S04 the catalogue lists three water pumps, one filter pump, a jet total of 26 with four water columns, and a total power figure of 8.25 kW. Compare that against what your quotation says line by line, because options move both the count and the load.
- Which pumps drive jets, which drive filtration, and whether any jet shares a pump with the filtration circuit.
- Whether the water columns shown in the photographs are standard on your configuration or an added option.
- The filter pump flow rate against the spa volume — undersized filtration is the most common cause of cloudy water complaints.
3. Control, sanitation and lighting package
The WS-S04 specification shows one control system, ozone sanitisation, and LED lighting recorded as three lights plus 18 small LED lights. Ozone is a sanitisation aid, not a replacement for the routine water chemistry you will maintain on site — ask which sanitisation method the configuration relies on day to day.
- Control system type, user interface and where it mounts (on the cabinet, in a plant room, or wall-mounted).
- Whether UV sterilisation is included or quoted as an accessory.
- Lighting count, placement and whether fixtures are specified for submerged service.
4. Heating, insulation and running cost
Total power on a spec sheet is a machine rating, not your electricity bill. If the spa will hold water through cold months, heat pump and insulation choices matter more than jet count. Our catalogue options include heat pumps, insulation and sand filtration; availability and compatibility vary by model, so confirm them for the configuration you are ordering.
- Heat source: heat pump, electric heater, or neither — and who supplies it.
- Insulation package for cabinet, shell and pipework in your climate.
- Cover specification, since an uncovered spa loses most of its heat.
5. Site, electrical and plumbing preconditions
Before the spa ships, the site needs a load-bearing pad at the correct level, a dedicated electrical supply sized to the confirmed total load, drainage, and a route for the delivery vehicle. Electrical requirements depend on the final configuration, so we ask buyers to have a local electrician confirm supply sizing against the delivered specification — local wiring rules and inspection requirements are the site's responsibility.
6. Delivery, installation and after-sales terms
Ask what the quotation ends at: port, kerbside, or the prepared pad. As a one-stop furniture and building materials supplier, we handle freight by sea, air and rail with customs paperwork and door-to-door delivery, then support installation and after-sales service on project work. Get the scope in writing anyway — Incoterms, insurance, offloading equipment and site access all change the price.
- Incoterm and delivery point, plus who arranges offloading.
- Packaging and container loading plan for a spa plus its plant.
- Warranty scope, spare parts availability and how faults are reported.
7. When the standard model is not the right one
The S04 family shows why model selection is a site question rather than a preference. The WS-S04B runs 3900 × 2200 × 1450 mm — deeper, with 31 jets and six water columns at 10.35 kW — while the WS-S04X is a shallower 3990 × 2260 × 950 mm layout with 85 jets at 8.85 kW. Longer layouts such as the Outdoor Swim Spa WS-S10 suit sites where swim length is the priority.
Where a terrace plan calls for something other than a rectangle, our Customizable Shape Outdoor Spa supports square, round, oval and curved designs on an acrylic shell with structural reinforcement. Browse the full Swimming Pools and Swim Spas category to compare configurations side by side.
Send us the site plan and the configuration
If you are specifying a swim spa for a villa, resort or residential development, send the pad dimensions, your intended use (hydrotherapy, swimming, or both) and the climate the spa will sit in. We will quote the matching model with the pumps, heating and insulation that configuration actually needs, and take it through logistics and door-to-door delivery to your site.