A wall hung toilet looks simple on a specification sheet. The same photograph, the same "modern ceramic WC" description and a similar price can sit behind very different proposals from different suppliers. Where a project goes wrong is rarely in the visible shape of the bowl; it is in what arrives on site, whether it fits the waste outlet that has already been built, and how the missing pieces are handled afterwards. This guide uses our Wall Hung Toilet 1051W, a modern wall mounted ceramic WC, to show buyers and project teams how to compare samples and written proposals line by line before an order is placed.
Start With the Specification Sheet, Not the Photograph
The 1051W is a wall-hung vitreous ceramic toilet with a smooth glossy glaze and a compact body of 530 × 360 × 360 mm, designed around an 180 mm P-trap wall drain and a concealed water tank. It shares its design language with the rest of the 1051 sanitary series, which is why it is specified so often in apartment bathrooms, boutique hotel guest rooms and villa remodels where a clean, floating look matters.
When you receive proposals for comparable wall mounted WCs, ask each supplier to state the same five items in writing. If one of them refuses or answers vaguely, that is your first comparison point:
- Trap type and rough-in dimension. A 180 mm P-trap (wall outlet) pan will not solve a site with a floor outlet, and vice versa. Confirm the exact figure, not just "P-trap".
- Overall dimensions and projection. Compare depth from finished wall to front of bowl, width and height, and check them against your partition setting-out drawing.
- Ceramic body and glaze description. Ask what body material is used and how the glaze is described in relation to limescale, staining and yellowing.
- What is included and what is not. Concealed cistern, actuator plate, mounting frame, water inlet connection, seat and cover — state item by item whether each is supplied, optional or excluded.
- Packaging and spare-part supply. Ask how the pan is crated for ocean freight, and whether replacement seats, glaze-touch-up material and mounting hardware remain orderable after the main shipment.
What a Physical Sample Should Reveal
A sample pan is worth ordering for any repeat or multi-unit bathroom package, because several things simply cannot be judged from an image:
- Glaze quality under raking light. Run your hand across the interior and exterior surfaces. Thin or uneven glaze shows as a dry patch and will hold marks; a dense, even glaze reads as one continuous surface and resists limescale and staining.
- Wall and edge thickness. Look at the back panel and the fixing area. A substantial back panel is what allows the pan to be anchored safely to the frame or masonry, and it also hides the connection detail.
- Colour consistency. Compare the sample against your tiles, vanity tops and any other ceramic in the same room. "White" varies noticeably between factories, and on a hotel floor that variation is visible to every guest.
- The seat fit. Check how the seat sits on the rim, whether it rocks, and how it releases for cleaning. A wall hung pan leaves the floor empty precisely so the floor and the underside can be cleaned easily — a badly fitting seat defeats that advantage.
- Marking and documentation. Note whether model number, size and trap dimension are marked on the piece or in the packing list. On site, unlabelled cartons cause the wrong units to be installed in the wrong bathrooms.
Compare samples side by side rather than one at a time, and keep the sample itself as your acceptance reference for incoming deliveries.
Reading the Proposal: Where Identical Products Differ in Price
Once two proposals both quote a wall hung toilet of similar size and appearance, the difference is usually hiding in scope rather than in the ceramic. Use this comparison before you accept the lower figure.
| Line to compare | Ask the question | Why it changes the outcome |
|---|---|---|
| Drain configuration | Is the quoted pan matched to the outlet on my drawings — wall P-trap or floor S-trap? | A wrong trap means broken-out screed and re-plumbing. Some models, such as our Washdown One Piece Toilet 1051A, are offered with both P-trap and S-trap options, which is useful when a project mixes wall and floor outlets. |
| Inclusions | Is the concealed tank, plate and frame in this price, or priced separately? | A low pan price plus separately quoted frames and tanks often ends up higher than one complete, coordinated quotation. |
| Series coordination | Can basins and other ware be supplied from the same series and the same production run? | Mixing ranges is where colour and profile mismatch appear. The 1051 suite covers Wall Hung Ceramic Basin 1051B, the freestanding pedestal basin 1051S and the one-piece toilet 1051A, so a guest-room floor can be specified consistently. |
| Customisation | Can finish, packaging or branding be adjusted if my project needs it? | Project buyers often need labelled cartons by room or floor. Our Custom & OEM Service covers bespoke finishes and packaging, which removes a lot of on-site sorting. |
| Delivery scope | Is the price ex-works, or does it include freight, customs paperwork and door-to-door delivery? | Comparing an ex-works figure against a delivered figure is not a comparison at all. Ask every supplier to quote the same Incoterms. |
| After the shipment | Who handles damaged units, missing parts and replacement seats six months later? | Ceramics travel long distances. A proposal that names the spare-part route is worth more than a slightly lower unit price. |
Figures such as trap dimensions and body sizes are taken from the published product page for each model. Confirm them against the current technical data sheet for your order, since specifications can be revised between production runs.
Ask Both Suppliers the Same Seven Questions
Send an identical enquiry to every supplier you are comparing. Differences in the answers — not differences in the brochure — tell you who can actually deliver a bathroom package:
- Which carton is for which room, and how is that marked? Ask for a packing list organised by your room schedule.
- What is the lead time for the ceramic body itself, separately from any frame or tank?
- How are fragile ceramics packed for sea freight, and what is the breakage claim process?
- Can you supply matching ware — basins, bidets, vanities — in the same series and colour?
- Which documents come with the shipment: commercial invoice, packing list, certificate of origin?
- What is covered if a unit arrives chipped, and how fast can a replacement be produced?
- Who supports installation on site — instructions, guidance, snag inspection?
As an one-stop furniture and building materials supplier, we handle sanitary ware in the same order as cabinetry, flooring, wall panels, lighting and outdoor furniture for villa and hospitality projects. That matters at comparison stage because a single coordinated package means one set of drawings to reconcile, one packing schedule and one point of contact — instead of six suppliers each defending their own carton.
From Approved Sample to Site: What Should Be in Writing
Before production starts, make sure the following is agreed on paper. This is the stage where a well-managed order separates itself from a cheap one:
- A signed sample reference. Keep the approved pan and note its model, size and trap dimension; make incoming goods inspection against that reference, not against a photograph.
- A confirmed setting-out drawing. Frame position, finished floor level, inlet location and waste height should match the quoted trap dimension before any wall is closed up.
- A room-by-room quantity schedule. Quantities stated by floor and room type prevent both short shipments and over-ordering on a multi-unit project.
- An inspection and snag step. Our Installation & After-sales Support includes on-site installation, inspection with snags, warranty coverage, spare parts and ongoing maintenance — so the handover is documented rather than assumed.
- A logistics plan. Freight by sea, air or rail, customs paperwork, container loading and Logistics & Door-to-Door Delivery should be described in the proposal, including who handles which step.
Common Comparison Mistakes We See on Bathroom Packages
Comparing unit price only. A wall hung pan needs a frame, a concealed cistern and an actuator plate to function. Quote the complete assembly from each supplier.
Assuming "wall hung" means "fits my wall". Outlet type and rough-in distance decide fit. Check the 180 mm P-trap requirement against your built condition before ordering, not after.
Ordering ware from several ranges to save money. Colour and profile mismatch across a guest-room floor is expensive to live with and impossible to fix cheaply.
No spare-part plan. Hotels replace seats and covers for years. Confirm those parts remain orderable for the series you specify.
Skipping the sample because the schedule is tight. A single sample pan ordered early prevents a full floor of ceramic being rejected late — usually the slower option.
Frequently Asked Questions
Is a wall hung toilet harder to maintain than a floor-standing WC?
Cleaning is easier, because the wall-mounted structure leaves the floor empty and mopping reaches right underneath. The concealed tank means the flush mechanism sits behind the wall, so access to it should be planned at the framing stage — the actuator plate opening is what you service through.
Does the 1051W suit small bathrooms?
Yes. Its compact 530 × 360 × 360 mm body and wall-mounted installation keep both floor area and visual bulk to a minimum, which is why it is specified for apartments and compact hotel bathrooms.
Can I order the whole bathroom from one series?
Yes. The 1051 suite includes the wall hung pan, the matching wall hung basin, the freestanding pedestal basin and the one-piece toilet, so ware in the same room can share one profile and colour.
What should I do if my site has a floor outlet instead of a wall outlet?
Do not force a P-trap pan into a floor outlet. Ask the supplier which models offer both trap options — the 1051 series one-piece toilet is offered with P-trap and S-trap variants — or revise the setting-out before the screed goes down.
Send us your bathroom schedule, the outlet type for each room and the model you are evaluating. We will quote the complete package — ceramic ware, matching series pieces, packaging marked by room, freight and delivery — so you can compare it against competing proposals on equal terms.
Contact SANTERSON — ask for PHILLIP. Enquiries receive a response within 24 hours, Monday to Saturday, 8:00 AM – 6:00 PM (GMT+8).