A swim spa that fits a villa terrace, a resort pool deck or a compact garden is one of the few outdoor purchases where the specification sheet matters more than the photograph. Outdoor Swim Spa WS-S04B sits in the middle of that reality: it is a compact outdoor spa for swimming, hydrotherapy and relaxation rather than a full swimming pool, and the buying decision comes down to whether its footprint, jet layout and power load match how you intend to use it. This guide walks through the checks we would apply before an enquiry, so the quotation you receive can be compared against other models on the same terms.
Start with the job the spa has to do
Before comparing any numbers, decide which of three jobs dominates: daily lap swimming, hydrotherapy and relaxation, or a family spa used mainly in the warm months. A unit sized for exercise therapy spends most of its value on jet placement and water movement; one used mainly for evening relaxation is judged on seating depth, lighting and how easy it is to keep the water clean.
WS-S04B is listed in our configurable outdoor swim and hydrotherapy range with water jets, LED lighting and ozone as its shown features. The catalog does not list a swim training system for this model, so if your main goal is swimming against a current, raise that with us at the enquiry stage rather than assuming it is fitted.
Check the footprint against your site, not your wish list
The catalog lists WS-S04B at 3900 × 2200 × 1450 mm. Read those three numbers as decisions about your site:
- Length, 3900 mm — the length of the internal swimming and standing zone. It suits short training lengths, water-based exercise and children playing; it is not a full-length pool. Measure the clear run on your deck, including space to step out of the shell.
- Width, 2200 mm — wide enough for two people side by side in the jet seats, while still being a shell size you can usually route through a side gate or lift opening. Check your own access route rather than assuming.
- Depth, 1450 mm — the catalog depth for this shell. Confirm how it relates to the finished water line once steps are added, because seating comfort depends on the difference between shell depth and your platform height.
Treat catalog dimensions as starting points for site design. Foundation bearing, drainage around the shell, access for a crane or forklift, and local electrical and barrier requirements must be confirmed with your builder and installer before any order is placed.
Read the equipment list line by line
The specification area for WS-S04B records one control system, three water pumps, one filter pump, a jet total of 31 pieces including six water columns, two LED lights with 28 small LED lights, and a catalog-listed total power figure of 10.35 kW. Each line answers a practical question:
| Specification shown | What it tells you as a buyer |
|---|---|
| Jet total: 31 pcs, with 6 water columns | Ask for the layout drawing so you can see which seats and back zones the jets serve. Water columns give a vertical sheet of water rather than a point jet. |
| Water pump: 3 pcs | Ask how the three pumps are assigned — which drive jet circuits and which drive circulation — because that determines what you can run at once and what a fault would take out of service. |
| Filter pump: 1 pc | Ask what filtration cycle is assumed, what filter area is fitted, and whether sand filtration is included or optional on your configuration. |
| Total power: 10.35 kW as catalog-listed | This is the figure that shapes your electrical supply design. Hand it to your electrician together with the required supply phase, dedicated circuit and protection; do not assume an existing outdoor socket will carry a unit of this load. |
| LED lighting: 2 pcs plus 28 small LED lights | Relevant for evening use and for judging water clarity during maintenance. Confirm control options and whether colour or dimming is part of the quoted package. |
| Ozone | Reduces, but does not remove, the need for routine sanitiser dosing. Ask what daily chemical routine the manufacturer recommends for your water type and usage level. |
Equipment counts and power figures are transcribed from the catalog page for this model. The list that applies to your order is the one written into your confirmed configuration, because optional items change both the specification and the price.
Decide what is included before you compare prices
Most swim spa quotations look comparable until you check the options. For this range, catalog-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Work through them as a checklist:
- Heat pump — a catalog-listed option for this range. It determines whether you can hold a comfortable water temperature outside the warm months, and heating is normally where running cost is decided.
- Insulation and cover — insulation is a catalog-listed option for this range; ask what is fitted to the shell, whether a cover is included in your quotation, and how both affect heat retention at your site.
- Steps — affects entry height, deck layout and the finished footprint you have to allow for.
- UV sterilisation and sand filtration — change the maintenance routine, not just the invoice.
- Swim training system — the catalog does not list one for this model. If you want to swim against a continuous current, ask explicitly what is offered on WS-S04B and how it is configured.
Compare within the range instead of guessing
If any part of the WS-S04B specification misses your brief, the answer is usually a different model in the same Swimming Pools and Swim Spas range rather than a custom modification. Two useful comparisons from the catalog:
- Outdoor Swim Spa WS-S04 is listed at 4090 × 2200 × 1110 mm with a shallower shell, a waterfall among its shown features and a lower total power figure. It suits sites where a lower water line and an added water feature matter more than depth.
- Outdoor Swim Spa WS-S06 is listed at 5820 × 2220 × 1110 mm with a longer shell and four water columns, aimed at buyers who have the deck length for it.
Comparing two or three models on footprint, jet layout and power in one sheet is the fastest way to see whether you are paying for capacity you will not use — or under-sizing a unit that will be run harder than intended.
Ask about delivery, installation and after-sales as part of the price
A swim spa is a project, not a parcel. Our project services cover specification and material selection, manufacturing and quality control, freight and door-to-door delivery, then installation support, inspection and after-sales. For an enquiry, we suggest sending three things with the model name: a site photo or plan with the clear deck dimensions marked, your available electrical supply details, and the intended weekly usage pattern. With those, we can confirm which configuration fits and what still needs local design work.
Questions worth putting in writing before you commit: which items are included versus optional on your configuration; who prepares the foundation and who signs off the electrical connection; what the warranty covers for the shell, pumps and control system; and how spare parts are supplied after handover. Answers to those four questions usually decide whether a supplier is a fit.
If WS-S04B looks close to your brief, or you would like it measured against another model in the range, send us the site dimensions and usage plan and we will confirm the specification, options and delivered price before anything is committed.