A request for quote that only says "6-seater rope weave dining set, please quote" gets you a number, not a comparable offer. Two factories can price the same-looking suite very differently, because the differences sit inside the frame, the rope, the cushion and the way the pieces are packed. If you are furnishing a resort terrace, a pool bar or a villa outdoor dining area, the Rope Weave Outdoor Dining Set & Bar Table Stool Set with Teak Armrest is one coordinated suite that carries both a low oval dining group and a high bar group in the same design language — and it is exactly the kind of item where a thin RFQ causes expensive rework later.
Below is the information we ask buyers to put into the RFQ, and why each line changes the price. Send these details up front and you will receive an itemised quotation you can compare line by line against other suppliers.
1. The quantity breakdown: how many of each piece
This collection covers two seating heights, so a single "set" figure is never enough. State the count for every component separately:
- Dining group: number of oval dining tables, and the number of dining chairs per table.
- Bar group: number of high bar tables and the number of bar stools per table.
- Mix by zone: how many suites go to the restaurant terrace, how many to the pool bar, and how many to guest villa patios. Different zones often need different seat counts.
- Spares: whether you want extra stools or a spare chair per zone held in storage, which is common for hospitality operations.
Why it matters: bar stools and dining chairs are not interchangeable. A stool built to sit at a high bar table has a different seat height and footrest position from a dining chair with teak armrests. Quote both groups separately so you can see the real cost of each zone.
2. Frame and finish specification
The product page describes a solid aluminium frame with an anti-rust powder coating. In an RFQ, name what you actually need rather than accepting the default:
- Frame material and profile: confirm solid aluminium framing and ask for the tube profile used on the table base and chair legs.
- Coating type and colour: state the powder-coat finish and RAL or house colour you want. Coastal projects often specify a lighter tone to keep frame surfaces cooler in direct sun.
- Teak components: identify which parts carry teak — armrest caps, table edges, stool footrests — and say whether you want the teak left natural, oiled, or finished in a darker tone.
- Fixings: ask what fasteners and connection hardware are supplied, and whether replacement fixings can be ordered later.
Why it matters: frame thickness, coating system and how much solid teak appears on the piece are among the biggest drivers of unit price in this category. If your RFQ does not name them, every supplier answers a different question.
3. Rope weave and cushion specification
The vertical rope weave is the visual signature of this suite, and it is also where quality varies most quietly. Put these points in writing:
- Weave pattern and direction: confirm the vertical rope layout shown on the product page, or supply your own reference drawing if you need a different pitch.
- Rope colour: give the colour code or send a sample. Mixed zones sometimes use two rope colours to separate dining from bar seating.
- Cushion fabric: the page states outdoor-grade fabric for sunlight and rain exposure. Specify the fabric type, colour, and whether you need a removable, washable cover.
- Foam and drainage: ask what cushion filling is used and how water drains from the seat, since cushions on an uncovered terrace take rain between services.
Why it matters: a rope weave that looks identical in a photograph can differ in rope diameter, tension and how the ends are anchored. Ask the supplier to describe the anchoring method, not just the pattern name.
4. Dimensions and space planning
The product page states that table dimensions can be adjusted for hospitality project orders, so treat size as a specification line, not a fixed number:
- Table sizes: the oval dining table length and width you need, and the diameter or footprint of the bar table.
- Clearance: send your floor plan or a sketch with walkway widths, so seat counts can be checked against the space before production.
- Level thresholds: note steps, kerbs and door widths the pieces must pass through on delivery day, especially for rooftop and upper-terrace venues.
5. Customisation, branding and order terms
Before the custom lines below, state your order volume per component and ask how it affects unit price — flexible minimum order quantities are part of the service range, but the figure you give changes what a supplier is willing to tool and produce. Useful specification lines:
- Matching pieces: whether you also want the Rope Weave Outdoor Sofa Set with Teak Armrest & Nesting Coffee Tables or the Rope Weave Outdoor Chaise Lounge & Round Daybed with Teak Armrest quoted in the same rope colour and frame finish, so one terrace reads as one collection.
- Branding: any engraved or embossed logo on teak parts, plus packaging requirements if you want private label furniture manufacturing under your own brand.
- Sample order: whether you want one prototype suite approved before the full production run.
- Delivery terms: destination port or site address, and your preferred Incoterms. Specify these so the logistics and door-to-door delivery service can quote freight, customs paperwork and final delivery to your project.
6. What a complete RFQ looks like
A short version you can copy into an email:
Product: Rope Weave Outdoor Dining Set & Bar Table Stool Set with Teak Armrest. Quantities: X oval dining tables, Y dining chairs, Z bar tables, N bar stools, plus spares. Frame: solid aluminium, powder-coat colour ___. Teak parts: ___ finish. Rope: vertical weave, colour ___. Cushions: outdoor-grade fabric, colour ___, removable covers yes/no. Table dimensions: ___ (or "as per attached plan"). Matching items in the same finish: ___. Branding: ___. Sample required: yes/no. Destination: ___ port or site address. Preferred Incoterms: ___. Target installation date: ___.
Include your project location and the date you need furniture on site. That single line lets the supplier sequence production, freight and installation support instead of quoting a warehouse order. The project cases page lists villa and hospitality projects in Sydney, Melbourne, Perth, Willoughby and North Turramurra — tell us the city and we will build the quotation around that delivery point.
Send your specification through our SANTERSON website, or reach us on WhatsApp at +86-13928214007. The more specific the RFQ, the faster you get a comparable price and the fewer surprises at production.