Rope Weave Outdoor Chaise Lounge & Round Daybed with Teak Armrest

Rope Weave Outdoor Chaise Lounge & Round Daybed with Teak Armrest

Description

Coastal rope weave poolside collection, including adjustable sun loungers and spacious round daybed. Consistent teak arm detail for resort and villa leisure areas.

Description

This matching leisure set comes with adjustable rope chaise loungers and a generous round outdoor daybed, sharing the same rope weave and teak arm design language of the collection. The sun lounger supports multiple recline angles for sunbathing and resting. The round daybed creates a cosy social relaxation spot. The aluminium frame is built to withstand seaside salt air, and cushions use outdoor-grade performance fabric. Ideal for hotel pool decks, beach resorts and luxury villa poolside. Custom cushion fabrics, accent pillows and frame colours can be arranged for hospitality projects.

Features

  • - Hand-woven vertical rope, salt & weather resistant
  • - Powder-coated aluminium frame, anti-rust for coastal use
  • - Natural teak arm caps
  • - Chaise with multi-position reclining backrest
  • - Large round daybed for group lounging
  • - Outdoor performance cushion fabric, UV & water repellent
  • - Coordinated with our rope dining & sofa series
  • - Custom cushion colours, patterns and frame finish