Coastal rope weave dining and bar suite, unified design with teak arm details. Includes oval dining set and high bar set for flexible outdoor catering layouts.
This coordinated outdoor collection includes an oval dining set and a matching high bar table with bar stools, sharing the same rope weave chair design and teak arm details. The breathable vertical rope design works well in seaside environments. The solid aluminum frame is treated with anti-rust powder coating. All cushions adopt outdoor-grade fabric to withstand sunlight and rain. Suitable for villa terrace, resort restaurant, pool bar and beach café. Custom upholstery, frame finishes and table dimensions can be adjusted for hospitality project orders.