A wall-hung basin looks simple on a rendering and complicated on a purchase order. Before Wall Hung Ceramic Basin 1050WB, Luxury Gold Line Wall Mount Bathroom Sink reaches a guest bathroom or a villa powder room, someone has to write down what the buyer is actually approving: the model, the finish detail, the mounting method, the faucet provision, and how the item coordinates with everything else in the same room. This article walks through the fields that belong in that brief for the 1050WB, so quotations come back comparable and site installation does not stall.
Where this basin normally lands in a project
The 1050WB is specified most often where floor area is tight and the design still asks for a dressed-up look: boutique hotel restrooms, luxury apartments, and secondary bathrooms in villas. The wall-mounted structure leaves the floor open, which is why it reads well in small rooms — visually the space feels larger, and housekeeping can get under the bowl instead of working around a pedestal.
If a project has both a feature guest bathroom and smaller ensuite or powder rooms, the same series covers both. The 1050WB is part of the 1050 matching sanitary collection and coordinates with Freestanding Pedestal Basin 1050B, Luxury Gold Line Ceramic Stand Basin for the bathrooms that can carry a floor-standing fixture, and with Washdown One Piece Toilet 1050A, Luxury Gold Line Ceramic WC for the water-closet side. Specifying the whole room from one series is what keeps gold accents, ceramic body colour and silhouette consistent across floors.
The identification block: model name and finish detail
Write the full product name and model number exactly once at the top of the line item, then refer to the model number everywhere else. For this fixture that is "1050WB" plus the series name. The identifying visual feature is the gold line decoration on a soft trapezoid body — state it in words rather than relying on a picture, because a substitute supplier will otherwise quote a plain white bowl with a similar outline.
Ask for a physical or mailed sample of the glaze and the gold line before releasing volume. Two things to check on the sample: whether the ceramic body colour matches the tiles and stone already procured for the room, and how the gold line reads under the room's actual lighting rather than in a showroom.
Dimensions and clearances to state before pricing
The product page gives an overall size for 1050WB of 495 × 440 × 390 mm. Put that figure in the brief as a starting point for setting-out, and add one line that the final technical sheet governs. Rough-in heights, waste position and the fixing centres are set by the wall framing and the contractor's first-fix stage, so they need confirming against the drawing pack — not inferred from a catalogue image.
| Item | Wall Hung Ceramic Basin 1050WB |
| Overall size on product page | 495 × 440 × 390 mm (width × projection × height) |
| Body shape | Trapezoid, wall-mounted, back-panel fixing |
| Finish detail | Glossy glaze with gold line ornament |
| Faucet provision | Pre-drilled faucet hole for single tap assembly |
| Confirm before order release | Final technical sheet dimensions, waste and trap arrangement, fixing detail for the wall build-up in use |
Two numbers people forget to put in the brief are not about the basin at all: the finished floor level and the height of the tap above the rim. Both come from the setting-out drawing, and both change how the fixture looks once installed.
Mounting method and the wall that carries it
The 1050WB is fixed to the wall through its back panel, with no cabinet underneath. That single sentence has consequences across trades, so spell them out in the brief:
- The wall build-up and framing must be designed to carry a wall-hung fixture; confirm the fixing detail with the wall system being used before the basin is ordered.
- Waste and supply positions have to match the setting-out, because once the wall is closed the position is fixed.
- No vanity means storage has to come from elsewhere in the room — mirror cabinets or towel warmers and rails usually absorb that role.
- The open floor under the basin is a housekeeping advantage in a hotel restroom, so record it as a requirement if operations teams have signed off on it.
Material and maintenance wording that survives handover
The body is vitreous china with a smooth glossy glaze, which is what the site describes as repelling water stains and limescale and needing only simple wiping for daily upkeep. Write this into the brief in operational terms rather than marketing terms: what cleaners are permitted, how often the gold line area needs attention in a high-use restroom, and who signs off the sample after it has been cleaned a few times.
For bathroom fixtures on a hotel project, this is also the point where you decide whether one cleaning protocol covers every bathroom in the building. Mixing a gold-accented series in guest rooms with a plain series in staff or back-of-house areas is a legitimate decision — but it should be a written decision, not something discovered during snagging.
Coordinating the rest of the bathroom in the same brief
A basin specified alone tends to arrive fine and then sit badly in the room. Add the neighbouring items to the line item list so they are quoted and delivered together:
- The matching WC from the 1050 series, on the same wall, at compatible heights.
- Vanity and mirror lighting, which decides how the gold line reads — see vanity lighting options if the room depends on it for the luxury effect.
- The shower side of the room where the design carries the same accent, such as a modern rainfall shower system with handheld sprayer.
- A feature option for larger bathrooms in the same building: Wall Hung Ceramic Basin 1050WC, Luxury Gold Line Wall Mount Sink, the taller silhouette in the collection, used as a decorative focus.
Grouping these under one project procurement line rather than splitting them across suppliers is what keeps ceramic colour, metal tone and profile aligned.
What to ask the supplier for before release
- The final technical sheet with dimensioned drawing, fixing detail and waste arrangement.
- A glaze and gold-line sample, referenced by batch, so later orders match the approved room.
- Packing specification per unit and per carton, plus carton count for the full quantity — this drives container planning more than the basin dimensions do.
- Which items in the 1050 collection ship together and which are made separately, since split deliveries across a bathroom fit-out create storage and damage risk.
- Spares allowance: a small percentage of extra basins for a multi-room project is cheaper than matching ceramic years later during refurbishment.
SANTERSON works as a one-stop manufacturer and supplier across furniture, building materials and interior fixtures, with services covering custom/OEM work, door-to-door logistics, installation support and after-sales support. For an interior fit-out project, that means the basin, the cabinetry, the lighting and the finishes can be coordinated from one procurement package instead of five.