A wall-hung basin looks simple on a drawing, yet most specification errors trace back to information that was never exchanged: the distance from the finished floor to the waste outlet, the position of the water supply, the load path behind the plasterboard. This guide sets out what a procurement or site team should send when specifying Wall Hung Ceramic Basin 1050WB, Luxury Gold Line Wall Mount Bathroom Sink, so the fixture arrives matching the wall it is about to be fixed to.

The dimensions recorded for model 1050WB

The product page lists 1050WB at 495 mm wide × 440 mm projecting from the finished wall face × 390 mm high. Treat those three figures as outer envelope, not as clearance. A guest bathroom that works on paper can still fail on site if the projection clashes with a door swing, a shower screen edge or a towel rail line.

  • Width 495 mm — check it against the clear width of the wall panel, not the tile finish, and confirm the basin does not crowd the adjacent WC or vanity.
  • Projection 440 mm — measure from the finished wall face to the front edge, then verify circulation in front of the basin after floor finishes are built up.
  • Height 390 mm — this is the basin body itself. The mounting height on site is set by the waste and supply positions, so state the intended rim height in your enquiry rather than assuming a default.

Because rough-in geometry varies between projects, we confirm the trap position, waste centre and supply spacing against the current technical sheet for each order before production. Please request that sheet with your drawing instead of relying on catalogue dimensions alone.

How the basin is fixed, and what the wall must provide

1050WB is a wall-mounted basin fixed by its back panel, with no cabinet or pedestal underneath. That construction keeps the floor clear, which simplifies cleaning under the fixture and visually opens up a small bathroom — one reason this style is chosen for villa secondary bathrooms and boutique hotel restrooms.

The trade-off is that the wall becomes part of the structure. Send us the wall build-up before we quote: stud spacing, whether the cavity carries timber or steel framing, and where the reinforcement or backing frame will sit. On tiled partitions, tell us the finished tile thickness, because the fixing depth is measured from the completed surface. If a project uses lightweight partitions, raise it early — that is a design decision, not something to resolve with an anchor on site.

Drainage, water supply and the faucet hole

The basin has a pre-drilled faucet hole for single-lever tap assembly, so the spout and mixer positions must be known before the wall is closed up. Specify which faucet you intend to use, or ask us to match one from the same project package, so the spout reach suits a 440 mm projection.

For drainage, provide the waste outlet height above finished floor and whether the run is a wall drain or a floor drain. Wall-hung work usually runs into a ducted shaft; a floor-drain layout changes the trap route and may move the basin off its intended centrelines. If your drawings show a dual rough-in option on the matching WC in the same room, note it separately — each fixture carries its own geometry.

Specifying the 1050 series as one coordinated set

1050WB belongs to a matched sanitary collection built around the same soft trapezoid silhouette and thin gold line detail. Ordering the room as a set keeps glaze colour, edge radius and the gold accent consistent across fixtures from different production batches:

The vitreous china body with a smooth glaze resists water staining and limescale build-up, which matters in project settings where housekeeping rotates through many identical bathrooms. Daily upkeep is a wipe-down; no special treatment is required between inspections.

The project information that makes an enquiry quotable

Send the following with your request and we can return a specification rather than a generic price:

  • Fixture schedule with quantities per floor or room type, plus which rooms take 1050WB and which take 1050B or 1050WC.
  • Wall set-out drawings showing finished floor levels, waste centre heights and supply positions.
  • Wall build-up details and the intended fixing substrate for each bathroom type.
  • Faucet selection or finish reference, including whether the gold line accent should be coordinated with the tapware.
  • Delivery destination and packaging preference — palletised or mixed-container loading for a wider bathroom fixtures package.

As a China-based manufacturer of furniture and building materials, SANTERSON supplies these ceramics alongside the other fit-out elements of the same project — custom and OEM production, consolidated shipping through door-to-door delivery, and installation and after-sales support. Coordinating the sanitary ware with cabinetry, wall finishes and lighting in one order reduces the number of suppliers reconciling dimensions on site.

Before you lock the specification

Confirm three things in writing: the finished-floor datum your drawings use, the waste and supply coordinates at that datum, and the substrate behind the basin line. With those inputs fixed, 1050WB specifies cleanly — a 495 mm wall-hung basin with an open floor beneath it, matched to the rest of the 1050 collection. For dimension verification or a project schedule review, contact our team with your drawings and quantities.