A wall-hung basin looks simple on a mood board and complicated on site. The Wall Hung Ceramic Basin 1050WC, Luxury Gold Line Wall Mount Sink is a good test case: it is a tall, slim, back-panel-mounted basin with a pre-drilled faucet hole and a gold line accent, so the decisions that matter are dimensional, structural and coordination-related rather than stylistic. The specification below shows how a procurement team can describe this basin in a way a factory, an installer and a consultant all read the same way.
1. Fix the item description before the quantity survey
Write one line that nobody has to interpret. For this model that line is: tall wall-hung vitreous ceramic basin, gold line accent, back-panel wall fixing, pre-drilled faucet hole, supplied as part of the 1050 Gold Line sanitary collection. The published page dimensions are 410×340×620 mm. Carry those numbers into the schedule exactly as published and treat them as nominal until the factory's technical sheet is returned signed. If a project needs a confirmed dimension for setting-out, ask for the drawing rather than assuming the catalogue figure is the rough-in.
Two details on this basin change what the site team expects. The vertical silhouette makes it a feature piece in a guest powder room or a villa bathroom, and the open floor beneath it is part of the selling point for housekeeping. Both belong in the specification note, because they explain why the item was chosen and stop a substitute being approved later on price alone.
2. Specify the mounting condition, not just the product
Wall-hung ceramics fail at the wall, not at the basin. For the 1050WC, the fixing method stated on the product page is a back panel that reinforces the wall-mounted installation, so the specification has to say what that panel bears against:
- The substrate behind the finish: masonry, framed studwork with noggin at the correct height, or a proprietary framing system.
- The finished wall line, so the projection from the basin to the front face of tiles is measured after tiling, not before.
- The tap arrangement: the pre-drilled hole governs where the faucet sits, so agree the faucet model and set the supply and waste routes before the wall is closed.
- Access for future servicing of the waste connection.
Trap type and rough-in are not published on this product page. That gap should be recorded as an open item in the schedule with a named owner and a date, not filled in from another project's habit. For the matching 1050A one-piece toilet in the same collection, dual rough-in options are stated on its own page; do not transfer that assumption to the basin.
3. State the material and finish in terms you can inspect
The product page describes high-density vitreous ceramic with a glaze that resists staining, yellowing and mineral deposits, which is the practical reason this basin suits high-use guest bathrooms. In a specification, translate that into what an inspector checks on delivery: glaze continuity on visible faces, consistency of the gold line decoration between units in one batch, no crazing or pinholes, and packaging that protects the rim and the tall vertical body through freight.
Gold-line detailing is a decorative element, so agree how it is approved. A signed physical sample, photographed against the batch number, settles arguments that a colour reference in a PDF never will.
4. Specify the set, not one basin
The 1050WC is sold as part of a matched collection, and that is where a specification earns its keep. The same Gold Line family covers the Wall Hung Ceramic Basin 1050WB in a trapezoid form for secondary bathrooms, the Freestanding Pedestal Basin 1050B where a floor-mounted stand basin is preferred, and the Washdown One Piece Toilet 1050A. Listing the family as one line item with per-room variants keeps the gold accent consistent across floors and prevents a mixed look that no one can explain afterwards.
Group these ceramics with the rest of the wet-zone package when you order. Cabinetry, shower fittings, vanity lighting and wall finishes all touch the same wall, so coordinating them through one one-stop solution workflow means a single drawing set governs the setting-out instead of four suppliers working from separate assumptions.
5. Record quantities, rooms and spares in one schedule
A usable schedule for this basin has six columns: room or floor code, model, quantity, mounting condition, open items, and approval status. Add a spare line sized against the number of guest bathrooms on the project and your own maintenance policy; holding spares for a boutique hotel with many rooms and a villa with two or three bathrooms are different decisions.
For projects where the ceramics travel internationally, the specification should also name who prepares packing lists and commercial documents and who confirms the delivery point. SANTERSON's logistics and door-to-door delivery service covers freight forwarding and paperwork; transit time, import terms and duties are still project-specific and should be confirmed in writing for each destination before the order is released.
6. Close out with an inspection record
Before the walls close, photograph the framing at the basin position with a tape visible, then check three things on delivery: the model code on the carton matches the schedule, the gold line decoration matches the approved sample, and the pre-drilled faucet hole is undamaged. Record the batch number against the room list. That record is what makes a replacement or an additional order six months later a routine purchase rather than a search for a discontinued item.
Send the finished schedule to the factory with two questions attached: confirm the technical drawing and mounting detail, and confirm which items in the collection are stocked against which are made to order. Answers to those two questions decide whether this basin is a specification you can build to or an aspiration on a drawing.
Common mistakes to avoid
- Specifying the catalogue size as the setting-out dimension without a returned technical drawing.
- Leaving trap type and rough-in blank on the assumption they match another model in the range.
- Approving the gold line accent from a screen image instead of a physical sample.
- Ordering the basin without the matching collection items, then trying to complete the look later.
- Closing the wall before the supply and waste routes are agreed with the mechanical contractor.
For project enquiries on the 1050 Gold Line collection, including matched basins and toilets for villa and boutique hotel bathrooms, contact SANTERSON through the contact page.