A wall-hung basin looks simple on a drawing. It is a bowl, a gold line, and a bracket in the wall — until the first sample arrives with the tap hole in the wrong place, or the gold decoration comes out of register against the rim. The Wall Hung Ceramic Basin 1050WB is a soft trapezoid vitreous china basin with a gold line ornament, fixed to the wall by its back panel and carrying a pre-drilled faucet hole. Before production starts on a custom order of this basin, there are eight items worth putting in writing. Confirming them at quotation stage is what separates one smooth batch from three rounds of rework.

1. The dimensions you design around are the moulded ones

The 1050WB is listed at 495×440×390 mm, fixed on wall by back panel. Treat those figures as the reference for your setting-out drawing, then ask the factory to confirm them against the current technical sheet before you cut any tile or close any stud wall. Ceramic is fired at high temperature and moves; a custom order also changes tooling. What matters on site is not the brochure number but three practical distances:

  • the height of the waste connection above the finished floor;
  • the depth the basin projects from the finished wall face, which decides whether a walkway in front of it still works;
  • the position and spacing of the fixing bolts in the back panel, because they have to land on solid timber or steel, not on blocking you placed by guesswork.

Send your setting-out drawing to the factory and let them mark it up. That single exchange prevents the most expensive class of error on a wall-hung installation.

2. Rough-in, trap type and what sits behind the wall

A wall-hung basin is only as good as the frame inside the wall. Confirm which waste arrangement your project uses — wall drain or floor drain — and how much depth that leaves for the back panel and its reinforcement. In the same 1050 collection, the matching Washdown One Piece Toilet 1050A is offered with both P-trap and S-trap rough-in options, which is a good illustration of why the drainage layout has to be settled before you order anything from the series. For the basin itself, ask for the fixing detail: bolt pattern, load rating of the carrier, and whether your wall construction needs a steel frame or whether timber blocking is acceptable at the recorded depth.

If your project uses concealed cisterns, in-wall waste carriers or a particular brand of bracket, name it in the enquiry. The factory cannot design around an assumption.

3. The gold line: how it is applied and where it sits

The decoration is the whole reason this basin is specified, so it deserves its own line item in the specification. Ask three questions:

  • Is the gold line a fired-in glaze decoration or a surface applied band? This decides how it behaves under years of wiping and how it can be repaired if chipped.
  • Where exactly does it run relative to the rim and the front face? Approve it on a dimensioned sketch, not a photograph.
  • What tolerance is allowed between pieces in one batch? Gold detailing varies more from piece to piece than plain glaze does.

For a project where several bathrooms use the same basin, request that the whole order be fired in one production run. Batches fired weeks apart can differ subtly in gold tone and glaze sheen, and that difference is visible when two basins sit side by side in a guest suite.

4. Glaze colour, surface and what the sample proves

The 1050WB's smooth glaze is described as repelling water stains and limescale, needing only simple wiping for daily maintenance. In a project order you want that claim to survive contact with local water. Confirm the glaze colour against a physical sample rather than a screen, and check the sheen under your own bathroom lighting — a high-gloss white next to a warm 2700 K mirror light reads very differently from the same basin in a showroom.

Then test the sample the way the finished building will use it. Leave a wet sponge mark overnight, wipe it with the cleaning agent your housekeeping or maintenance contractor actually stocks, and look at the gold line afterwards. If the cleaner is too aggressive, you want to know now, while changing it costs nothing.

5. The faucet hole and the tap you intend to fit

The basin arrives with a pre-drilled faucet hole for quick tap assembly. That is convenient, but only if the tap you have chosen fits it. Confirm before production:

  • the diameter of the drilled hole and whether it suits your tap's shroud;
  • whether you need the hole left blank for a wall-mounted spout instead, which is common in boutique hotel schemes;
  • spout reach, so the water lands in the bowl rather than on the front edge of a shallow trapezoid.

Drilling and blanking are decisions made before firing. Changing them after the first batch is produced means starting again.

6. Whether 1050WB is the right member of the series

The 1050 range is a matched sanitary collection, and a custom order is the right moment to choose deliberately rather than by default. The standard 1050WB wall basin sits low and wide with its trapezoid silhouette, which suits a guest powder room or a villa secondary bathroom where the floor should stay clear. The tall 1050WC wall basin takes a vertical slim form and works as a decorative feature sink where the wall itself is part of the design. Where the layout allows a floor-fixed fixture, the freestanding pedestal basin 1050B gives the same gold-line language without an in-wall carrier at all.

Mixed unit types across a building are normal and often correct. What you want is that the choice was made per room, with each type's fixing method understood, rather than one model ordered for every bathroom on the schedule.

7. Packaging, spares and the breakage plan

Ceramic travelling to a site is ceramic at risk. For a custom run, specify the packaging in the order: moulded protectors around the rim and gold-decorated face, corner protection on the back panel, and clear labelling of each carton by room number from your bathroom schedule. Then agree the breakage terms before shipment — how many spare pieces are held at the factory, how quickly a replacement fires, and who pays for the first replacement in transit.

Ordering against a room-by-room schedule also means that if one piece is lost, you replace one basin for one bathroom instead of unpicking an entire delivery.

8. Who signs off the sample and when

None of the above works without a signed physical sample. Make it a condition of the order: one complete basin, fired with the agreed glaze and gold decoration, drilled for the chosen tap arrangement, measured and stamped on the technical sheet, initialled by your designer or project manager. Keep that piece. It becomes the reference for every carton that arrives afterwards, and it settles disputes about tone and finish in about ten seconds.

If your project also needs the rest of the fit-out — vanities, wall panels, mirror cabinets, vanity lighting, flooring and joinery — from one supplier, say so at the start. Coordinating a matched bathroom package through one production and shipping process is where a custom and OEM service earns its keep: one specification, one set of samples, one logistics chain instead of six.

The short version

Before the mould runs, you should have in writing: confirmed dimensions against a current technical sheet; the rough-in and fixing detail for your wall construction; how the gold line is applied and its tolerance across one firing batch; an approved physical sample under your own lighting and cleaning regime; the faucet hole resolved against your chosen tap; the right member of the 1050 series selected room by room; packaging and breakage terms tied to a room schedule; and a named person who signs the sample.

Send those eight items with your enquiry instead of after the first sample arrives. That is how a custom wall-hung basin order goes through once.