A materials schedule is the document that keeps a villa, hotel or office fit-out from falling apart at site level. It lists every finish, product and fitting room by room, and it is where procurement, design and construction all meet. Stone and marble wall panels sit awkwardly in that document unless they are written into it properly: they are made-to-measure items, they interact with substrates and setting-out lines, and they arrive alongside joinery, flooring and lighting from different supply chains. This guide shows how to carry Santerson Stone & Marble Panels through a whole-project materials schedule, from the first finish board to the handover snag list.

Why stone and marble panels break schedules when they are treated as an afterthought

On most projects the wall finishes column of a schedule is filled in late. Timber flooring, cabinetry and tiling are usually specified early because their quantities drive other decisions, while feature wall panels get left until the design team has settled on joinery and lighting. For rigid natural stone that habit causes rework: openings, skirting junctions, switch plates and reveal lines all move after the panel schedule has been drawn.

Santerson's panel products are configurable rather than fixed catalogue sizes. The Paneling Systems range is described as having finish, layout and dimensions specified to suit each space, with made-to-measure sizing and material and finish options. That flexibility is an advantage in a completed building, but it means the schedule must carry clear rules about who measures, when they measure, and what gets confirmed before production starts.

Step 1: place the panels in the right schedule line, not in a decorative note

Panel finishes disappear when they are written as a comment such as "stone feature wall to living area". Write them as their own line items with a room reference, so they carry the same status as tiling or cabinetry. A workable line entry records:

  • Room and elevation reference, taken from the drawing set rather than described in words.
  • Product family and collection, for example Santerson Stone & Marble Panels within Paneling Systems, or a flexible stone veneer for curved surfaces.
  • Finish and colour selection, with the sample or reference code once it has been approved.
  • Sizing basis: made-to-measure, site-verified, with the measurement date recorded.
  • Substrate and fixing method to be confirmed on site.
  • Lead time placeholder and the responsible party for verification.

The point of this structure is that a quantity surveyor, a site foreman and a factory can all read the same line without asking the designer what was meant.

Step 2: match the panel type to the surface before you price it

A whole-project schedule usually needs more than one wall product, because flat walls, curved walls and wet areas behave differently. Grouping panels by surface condition avoids the common mistake of specifying a rigid sheet for a curved soffit.

Surface conditionPanel family to considerScheduling note
Flat feature walls, lobbies, reception backgroundsSanterson Stone & Marble Panels, Santerson Textured PanelsConfirm layout and joint pattern with the joinery setting-out before sizing is issued.
Curved walls, arches, columns, feature cylindersMCM Flexible Travertine Stone Veneer, MCM Flexible Rammed Earth PanelBendable, thin sheet materials that wrap curved and special-shaped surfaces; site-cut with simple tools.
External facade and curtain-wall zonesAluminum Honeycomb Panel for Building Exterior & Interior Wall Cladding, offered with a stone finish optionLarge-format cladding where flatness and low weight matter; confirm technical specification per project.
Bathroom and wet-area wall systemsStone & Marble Panels in Custom Partitions & Paneling, Santerson Stone & Marble Surfaces for vanity topsSchedule wall panels and horizontal surfaces as separate lines; waterproofing and substrate prep sit ahead of them.
Renovation over existing backgroundsFlexible Wood Grain Cement Wall Panel, Decorative Wall PanelLightweight sheets that reduce load on existing structures; useful where demolition is off the table.

Product names and application ranges above follow the wording used on the relevant product pages. Materials, dimensions, fire performance and weather resistance must be confirmed for the specific configuration you order — do not transfer a claim from one panel type to another in the schedule.

Step 3: sequence the panels against the trades that touch them

Panel lines need dates, and those dates come from the trades around them. Build the sequence into the schedule so that nobody waits on a decision that has not been made.

  • After first-fix services. Conduits, back boxes and pipework must be set out before panel dimensions are verified, otherwise cut-outs move after production.
  • After substrate sign-off. Level of the base wall, whether cement board or gypsum, decides both fixing method and finished line. Record the substrate type as a prerequisite on the panel line.
  • Before joinery and flooring install dates. Panel reveals meet skirting, architraves and cabinetry returns. Fixing panels late forces those trades to scribe and pack on site.
  • Aligned with sample approval. Colour and veining selection needs physical samples in hand; note the approval date on the line so production release is not assumed.

For projects where the same supplier also provides cabinetry, wardrobes, flooring and lighting — a common arrangement when working with a one-stop furniture and building materials supplier — the panel line should reference the same drawing revision as the joinery line. A single revision number across both lines prevents the classic mismatch where a wardrobe return lands 20 mm short of a stone reveal.

Step 4: use made-to-measure properly, not as an excuse for late measurement

Made-to-measure sizing only pays off when the measurement is taken at a defined moment. Two practical rules keep it honest:

  • Measure from finished lines, not structural ones. Record whether each dimension includes the substrate build-up and the finished floor level, and state that basis on the schedule line.
  • Verify openings last. Doors, windows, niches and reveal set-backs should be confirmed against the as-built opening sizes, because these are where schedules and reality diverge most often.

Santerson's own configuration notes ask customers to confirm dimensions and selected specifications for each project. Treat that confirmation as a formal milestone in the programme — sign-off by name and date — rather than an email exchange buried in correspondence.

Step 5: write the coordination into the procurement package

A materials schedule that only lists products is a shopping list. A schedule that carries responsibilities and dependencies is a procurement tool. For each panel line, add four columns:

  • Status. Draft, sample approved, measured, released to production, shipped, installed, signed off.
  • Owner. Who verifies dimensions and who signs the shop drawing.
  • Dependency. The prerequisite trade or approval that gates release.
  • Snag reference. Joint alignment, colour match and edge treatment items to inspect at handover.

This structure also clarifies where custom work is needed. A Custom & OEM Service covering bespoke finishes and material choices lets a panel that must match an existing stone floor or a branded colour be raised as its own schedule line, rather than quietly absorbed into the standard specification.

Delivery terms belong on the same line. Where Logistics & Door-to-Door Delivery covers freight forwarding, packaging and container loading, customs paperwork and shipment tracking, the delivery date recorded in the schedule should reflect that chain — a point worth noting for fragile or oversized panel consignments. Final inspection, together with any joint or edge corrections, then sits with the Installation & After-sales Support stage, which is where panel snags are closed out.

A worked example: a villa entrance hall with three wall conditions

Consider a villa entrance hall with a flat reception background, a curved stair soffit and an adjoining powder room. One schedule page handles all three without conflict:

  • Elevation A — reception background. Santerson Stone & Marble Panels, layout confirmed against the joinery counter drawing, dimensions site-verified after floor leveling, sample approved before release.
  • Elevation B — curved stair soffit. MCM flexible stone veneer, selected because the surface cannot take a rigid sheet; substrate fixed and level checked before the sheet goes up.
  • Powder room. Wall panels scheduled separately from the vanity surface, with waterproofing complete recorded as the dependency for panel release.

Each line carries its own measurement date, owner and snag items. Nothing in that sequence depends on a decision made after production starts, which is what keeps the wall package off the critical path.

Handover: check panels against the schedule line, not the mood board

Inspection at completion should return to the wording in the schedule. Confirm that the installed finish matches the approved sample reference; that joint positions match the agreed layout drawing; that cut-outs sit where the first-fix drawings placed them; and that any made-to-measure dimension recorded at verification is the one delivered. Where a project includes other fit-out products — vanities, wardrobes, doors, wall panel systems or decorative screens from the same supplier — check the junctions between them, since most visible defects appear at those interfaces rather than in the middle of a panel.

Want the wall package written into your project schedule properly? Send SANTERSON your drawings, room list and target programme through the contact page, and the panel lines can be specified with dimensions, finishes and lead times confirmed before production release.

Product availability, configurations, technical performance and delivery terms vary by project and must be confirmed directly for each specification. Project programmes, sequencing and trade responsibilities shown here are illustrative planning guidance, not contractual commitments.