A wall-hung basin looks simple on a mood board and complicated on site. The Wall Hung Ceramic Basin 1050WC, Luxury Gold Line Wall Mount Sink is one of the more demanding pieces to specify, because its tall vertical body changes where the waste sits, how the carrier is fixed and what the surrounding wall has to carry. The checklist below follows the order a procurement or fit-out team actually works in: fixture first, then structure, then plumbing, then finish, then delivery.
Before the checklist: what this basin actually is
The published product record describes a tall wall-hung basin with a slim vertical body and a gold line accent, made of high-density vitreous ceramic with a glaze that resists staining, yellowing and mineral deposits. It is wall-mounted with back-panel reinforcement, has the faucet hole pre-drilled, and leaves the floor clear beneath it. The same record gives an overall size of 410×340×620 mm.
That footprint is the reason this model needs a different conversation from a compact wall basin. The bowl area stays narrow, while the body drops well below the rim towards the floor. So the questions you ask your supplier are not only "does it match the design intent" but also "what does the wall have to do, and where does the trap land".
1. Confirm the fixture and its place in a matched set
Start with the obvious item that gets skipped in fast projects: decide whether you are buying one basin or a coordinated suite. The 1050 line is published as a matching sanitary collection, so the same gold line detail appears across Washdown One Piece Toilet 1050A, the freestanding Freestanding Pedestal Basin 1050B and the shorter wall basin Wall Hung Ceramic Basin 1050WB.
That choice changes the specification sheet. A guest powder room can carry the tall basin as a feature piece, while an en suite or guest bathroom floor usually benefits from mixing the tall and shorter wall basins with the same accent, so heights and clearances stay consistent across rooms. Ask for the full dimension set of every model you are considering, not just the one in the rendering.
2. Check wall structure and fixing method
A wall-hung basin is only as good as what holds it. For this model, the product record states wall-mounted installation with back-panel reinforcement for stability. Write into your enquiry how the basin is supported on your particular wall build, and get that answer in writing before the wall is closed up.
- Which fixing detail applies on site: concealed carrier, or direct back-panel fixing to a prepared substrate.
- What substrate the wall framing uses, and whether noggings or a reinforcement plate are required at the fixing line.
- Whether tiled, paneled or stone-clad finishes change the fixing depth or the length of fixings.
- Where the load path runs once the basin is in use, especially on stud partitions with services behind them.
The practical point for project teams: this decision belongs to the first-fix stage. Once tiles are laid, correcting a missing reinforcement line means breaking out finish work.
3. Lock down rough-in, waste and faucet position
This is where tall basins differ most from standard wall basins, and it is the item to settle earliest.
- Waste and trap: the published record for this model does not state a trap type or rough-in dimension. Request the trap arrangement and the vertical and horizontal waste setting-out from the technical sheet, then mark it on your setting-out drawing before first fix.
- Rim height: with a 620 mm body depth, the finished rim height and the top of the basin are two different numbers. Agree both, and confirm they suit your users.
- Faucet: the faucet hole is pre-drilled, so the tap position is fixed by the basin. Confirm tap reach, spout projection and whether the mixer sits on the wall or through the basin.
- Waste fitting: confirm what waste and pop-up set the basin is supplied with, and what your plumber supplies separately.
If you are specifying several room types on one project, put these four numbers in a single table per model. It removes most of the arguments on site.
4. Verify material and finish for contract use
The basin is described as high-density vitreous ceramic with a smooth glaze that resists water marks, limescale and yellowing, which is the property set housekeeping teams care about in hotel and serviced-apartment bathrooms. Two checks are worth doing before you place a repeat order:
- Ask for the gold line detail to be explained: is it a fired decoration or an applied finish, and what cleaning agents are permitted on it.
- Order one sample basin for a mock-up bathroom and test it with your housekeeping chemicals before rolling the specification across room types.
A mock-up also settles appearance questions that photographs cannot, including how warm the gold accent reads against your tile and lighting.
5. Order as part of the wider bathroom fixtures package
Ceramics rarely fail on their own; they fail because the tapware, waste, cabinetry and tiling around them were ordered separately. Grouping your bathroom order lets one supplier coordinate sizes, packing and delivery sequence across bathroom fixtures for hotel projects and villa bathrooms alike, from basins and water closets to shower sets and vanities.
- Confirm quantities per room type, plus spares for future maintenance replacement.
- Agree how ceramic pieces are packed and palletised for export, and which items ship in the same container as joinery and flooring.
- Check what documentation arrives with the shipment, so your site team has installation information at hand rather than chasing it later.
6. Delivery, storage and installation sequence
Wall-hung ceramics are the items most often damaged between the container and the finished bathroom. Set the sequence in the programme rather than leaving it to whoever receives the goods.
- Inspect each basin on delivery, before the wall is closed and while a replacement claim is still possible.
- Store basins upright in original packing in a dry area, away from trades walking through the room.
- Fit after final wall finishes and after the waste setting-out has been tested, then protect the glaze until handover.
A short list to send with your enquiry
If you want one paragraph to paste into a supplier email, ask for these six items on the model number:
- Current technical sheet with overall and mounting dimensions.
- Trap type and waste setting-out dimensions.
- Approved fixing method and carrier or bracket requirement.
- Faucet hole position and compatible tapware range.
- Cleaning and maintenance guidance for the gold line finish.
- Matching items in the same collection, with their dimensions.
SANTERSON works as a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, covering design coordination, custom and OEM production, door-to-door logistics, installation and after-sales support. If your project needs the 1050 collection alongside other products in the same package, the bathroom fixtures can be specified and shipped together with joinery, flooring, lighting and outdoor items.
Send your room schedule and setting-out drawing for a quotation on the 1050 collection and the rest of your bathroom package. Contact PHILLIP at SANTERSON by phone or WhatsApp on +86-13928214007, or email santerson@qq.com. Enquiries are handled Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).