A flexible rammed earth cladding quotation rarely fails because of price. It fails because the supplier is quoting blind. Two buyers can send the words "500 square metres of soft stone" and end up with completely different material, packaging and freight costs, simply because one project is a flat hotel lobby wall and the other is a curved villa facade above a pool deck.
If you are sourcing MCM flexible rammed earth panel – bendable soft stone wall cladding for a hotel, homestay, restaurant, retail or villa project, the following is the information list our estimating team works from. Send it in one message and you will normally receive an accurate quotation instead of a rough range that has to be reworked after the drawings arrive.
1. The surface you are actually covering: flat, curved or special-shaped
This is the single most important item, because it decides which material family is even appropriate. MCM flexible rammed earth panel is a modified clay sheet that reproduces the layered, rough texture of a traditional rammed earth wall. It is thin and bendable, so it can be wrapped onto curved walls, columns, cylinders and other non-planar surfaces that rigid stone or rigid boards cannot follow.
- Flat feature walls — straightforward take-off from wall elevations; joints are laid out on a grid.
- Columns, cylinders and arches — give us the smallest radius or diameter. Bending behaviour changes as the radius tightens, and cutting patterns change with it.
- Soffits, reveals, undersides of stairs and curved bulkheads — tell us whether the face is overhead or vertical, because fixing method and adhesive selection differ.
- Existing substrates in renovation work — old render, tile, plasterboard or concrete each need their own preparation note.
Attach sketches, marked-up elevations, a 3D model export or even phone photos of the wall with dimensions written on them. A rough sketch beats a beautiful rendering with no measurements.
2. Areas, not just panel counts
Send measured square metres per elevation, and separate interior from exterior. We then add cutting allowance ourselves rather than guessing at it. Please state:
- Net area per wall or per room, with the length × height of each run.
- How much of that area is curved, and how much is flat.
- Openings to deduct — windows, doors, niches, TV recesses, fireplace surrounds.
- Whether return edges and external corners are included, since corner wrapping is usually counted separately from face area.
- A contingency figure you are comfortable with for offcuts on curved work.
If your bill of quantities only lists "wall finish — soft stone, allowance", we will still quote, but the number is provisional and will move once dimensions are confirmed.
3. Colour, texture and finish reference
Rammed earth panels are sold by visual effect, and "earth brown" means different things to different designers. The standard rammed earth range covers white and earth-brown tones with a matte, hand-compacted look. Tell us:
- The colour code or product photo you selected, plus the reference image you are matching.
- Whether you want the texture deep and rugged or softer and more uniform.
- Whether the surface will sit in strong sunlight, which affects how the tone reads once installed.
- If you need a physical sample before ordering — samples let your client sign off on the texture rather than on a screen.
4. Interior or exterior exposure
Interior feature walls in villas, restaurants and homestays are the most common use, but the same flexible cladding is also used for exterior wall renovation. For external applications we need to know what the wall faces — sun exposure, driving rain, freeze-thaw cycles in cold climates, splash zone near a pool or spa, or a sheltered courtyard. That determines whether the standard rammed earth sheet is the right choice or whether another flexible stone option suits the detail better.
For example, when the design brief calls for a porous natural-stone appearance rather than an earthy layered one, MCM flexible travertine stone veneer is usually the better specification: it replicates the pitted hole texture of natural travertine, wraps curved and special-shaped surfaces, and is offered for facade cladding as well as interior walls. Where a project wants a bendable mineral sheet with a timber appearance instead — for arches, headboards, reception fronts or curved ceilings — flexible wood grain cement wall panel covers that requirement and arrives rolled for transport.
5. Substrate and fixing method
Flexible rammed earth cladding is bonded rather than mechanically fixed: it goes straight onto a cement-based base or gypsum board with tile adhesive, and it can be cut on site with ordinary hand tools, which keeps joint treatment simple and construction fast. To quote the right accessories we need:
| What you tell us | Why it changes the quotation |
|---|---|
| Substrate material — cement render, concrete block, gypsum board, existing tile | Determines adhesive type and whether priming or levelling is required first. |
| Flatness of the substrate, in millimetres over a 2 m straight edge | A thin flexible sheet follows gentle movement but will telegraph major bumps and hollows. |
| Who installs — your local contractor or our site guidance | Sets whether you need fixing instructions, a technical call, or supervision support. |
| Adjacent finishes — skirting, cornices, glass, metal trim | Decides edge details, trims and the sequence of trades on site. |
6. Order size, packaging and destination
Flexible sheets are lighter than rigid stone and can be packed more efficiently, but freight still depends on volume, carton dimensions and delivery address. Please include:
- Total square metres per line item, split into separate rooms or façades if they use different colours.
- Delivery terms you want — port, door-to-door, or your forwarder's warehouse.
- Full delivery address and, for multi-site projects, each site separately.
- Your target arrival date and any site milestone it must land before.
- Whether you need the goods in one shipment or staged by floor or building phase.
For projects that also carry other finishes, tell us what else is on the same package. Wall cladding is often ordered alongside flooring, ceilings and doors from the same supplier, and consolidating them into one container saves handling as well as freight. Our logistics and door-to-door delivery service covers sea, air and rail freight with customs paperwork handled on our side.
7. Customisation and project context
Standard range colours handle most briefs, but bespoke requirements should be declared up front so they are priced rather than discovered later: non-standard sheet sizes, custom texture depth, private-label packaging for a distributor, or a colour matched to an existing wall. Our custom and OEM service handles bespoke finishes and prototyping, and minimum order quantities are discussed per project rather than fixed.
Also useful: the building type and its operator. Cladding for a hotel lobby, a banquet entrance, a school or a private residence is specified differently — traffic resistance, maintenance access and how often the wall will be touched all matter. If you are coordinating several trades at once, our turnkey solutions page explains how design, production and site coordination run together.
A ready-to-send enquiry template
Project name and location; building type (hotel / homestay / restaurant / retail / villa).
Product: MCM flexible rammed earth panel, colour reference, interior or exterior.
Areas: square metres per elevation, flat versus curved, smallest radius on curved work, openings to deduct, corner returns included or not.
Substrate: material, flatness, existing finish to be removed or overclad.
Fixing: adhesive required or supply-only, installer identified, drawings available (attach).
Commercial: quantity for this phase plus forecast for later phases, delivery address and terms, target arrival date.
Samples: quantity needed and courier account if you have one.
Common questions before a quote is issued
Can you quote from a rendering alone?
We can give an indicative figure, but it will be provisional. A rendering shows the look; it does not show radii, corner returns or substrate condition, and those are exactly what drive material count and cutting loss.
Why do you ask for flatness figures?
A thin cladding sheet conforms to a curve but not to an uneven base. Where the wall is out of true, either the substrate is corrected or the design detail is changed — and both cost money, so it is better decided before ordering.
Is flexible rammed earth panel only for interiors?
No. Interior feature walls are the most frequent application, but exterior wall renovation is also a listed use. The exposure details you provide decide the specification and the fixing system.
Can I get a sample before committing to the full area?
Yes, and for texture-led finishes we recommend it. A sample settles colour and texture disputes with the client far faster than correspondence about photographs.
Send the surface geometry, the measured areas, the exposure condition and the substrate detail, and a quotation for bendable soft stone wall cladding becomes a straightforward calculation rather than an estimate. That is also the fastest route from a design intent to a delivered, installed wall — which is why we ask for all of it in one go.