Stone and marble read as the easiest part of a project to specify and the hardest part to get wrong. The slab is chosen early, but it lands on site at the very end of a long chain of decisions: which opening it has to pass through, who prepares the substrate, what the wet trades have already finished, and who holds the panel once it arrives. When those questions stay unanswered until the container is booked, the result is usually a panel that fits the drawing but not the building.
Start With the Sequence, Not the Slab
A stone surface is a fixed-dimension product made for one opening. That single fact sets the order of work. Measurement can only be trusted once the wall build-up, waterproofing and finished floor levels are known, because each of those layers moves the dimensions by centimetres. Cut-outs for basins, taps and soap dispensers depend on the sanitaryware and mixers that have been selected. And the edge profile, splashback return and any undermount or undermount basin detail change how much clearance the installer needs at the sides.
Where a project also has cladding or feature walls, the same logic applies to those items. Stone & Marble Panels in the Paneling Systems collection and Stone & Marble Panels in the Custom Partitions & Paneling collection are both made to project dimensions, so setting-out drawings and fixing details have to be agreed before anything goes into production. For curved or irregular backgrounds, flexible stone veneer such as our MCM Flexible Travertine Stone Veneer can wrap the curve on site instead of being cut from rigid slabs, which changes both the measurement method and the installation crew.
What Has to Be Confirmed Before Production Opens
Our Stone & Marble Surfaces are configured per project, with made-to-measure sizing and material and finish options selected for each space. The practical consequence is that the specification has to be closed before manufacture, and closing it means answering a short list of questions with documents rather than assumptions.
| Decision | What it depends on | Who signs it off |
|---|---|---|
| Final dimensions and thickness | Wall build-up, finished floor level, substrate preparation, tolerances on site | Site contractor plus our project team |
| Cut-out positions for basin, taps, soap dispenser | Selected sanitaryware and mixer set, drainage position | Designer / M&E consultant |
| Edge profile, splashback return, polished or honed face | Approved finish schedule and sample board | Client or architect |
| Panel joints on cladding and feature walls | Setting-out drawing, fixing method, access for maintenance | Design team plus installer |
| Packaging, crating and load sequence | Site access, storage area, installation order of rooms | Our logistics coordinator with the site foreman |
Confirm the dimensions and the selected specification for each project before production is released. Once a made-to-measure stone panel has been cut and polished, a late change to a tap position or a wall line costs far more than an email exchange would have.
Matching the Delivery Window to the Site Programme
Stone arrives last for a reason: it must not sit on site while other trades work around it. Two dates matter, and they are set from opposite ends. The production completion date is fixed backwards from the confirmed measurement date. The delivery date is fixed forwards from when the relevant rooms are dust-free, dry and finished.
- Book production off a measured site condition, not a drawing stage. Confirm that plastering, tiling and waterproofing in the affected bathrooms are complete before final measurement is taken.
- Choose the Incoterms and freight mode per project. Sea, air and rail forwarding is arranged for our projects, with customs paperwork handled alongside; the mode should follow the programme, not habit. Air or sea-rail only makes sense when it buys back time that production has already lost.
- Sequence containers by installation order. If level-one bathrooms are being fitted six weeks before the upper floors, the crates for those rooms go in the first shipment and are loaded so they come off first.
- Name a receiving contact on site with a phone number. Freight forwarding, customs clearance and door-to-door delivery all work smoothly until nobody on site knows which day the truck arrives or where the crates are to be stored.
Australian import terms, duties, insurance cover and transit arrangements are confirmed case by case for each project rather than assumed from a standard package, and we set them out in writing with the quotation so the buyer knows which leg of the journey they own.
Plan Access and Handling Before the Truck Is Booked
Most avoidable stone damage happens between the kerb and the room. This is worth ten minutes on a site walk with photographs.
- Measure the narrowest point on the route: doorway widths, stair turns, lift car dimensions, gate openings. A vanity top that fits the bathroom may not fit the stairwell.
- Confirm whether the delivery vehicle can reach the entrance, and whether crates need to be broken down into hand-carried modules for a upper-level apartment or a villa with a narrow side passage.
- Identify a dry, level storage area close to the work face. Stone left outside or stacked on soft ground picks up moisture staining and edge chips.
- Check that the substrate is ready to receive the panels — bearers, framing and adhesive backgrounds need to be signed off before the stone is unpacked.
Where access genuinely fails, tell us at specification stage rather than at delivery. Panel size, joint layout and fixing method can all be adjusted during production; they cannot be adjusted once a full-size panel has been polished and crated.
Installation: Who Does What, and in What Order
Our scope includes on-site installation with inspection of the completed work, plus warranty cover, spare parts and ongoing maintenance as part of Installation & After-sales Support. The site contractor still carries the preparation work. Agreeing the split in writing removes the gap where defects are usually blamed on the other party.
A practical order of works
- Site contractor completes first fix, waterproofing, tiling and substrate preparation; levels and setting-out lines are checked against the approved drawing.
- Crates are opened in the installation area, panels and tops are dry-laid or test-fitted, and cut-outs are checked against the actual mixers and basins on site.
- Surfaces are fixed, joints sealed, and any integrated items such as an Integrated Basin or Double Basin Countertop are set to the correct falls and levels.
- Joint inspection with a snag list, photographed and signed by both parties; spares and replacement parts are recorded against the same reference.
- Protection covering stays on until the room is handed over, so later trades do not mark a finished face.
Outdoor Stone Surfaces Add Their Own Checks
Stone also appears in exterior settings — Marble Top Outdoor Dining Set with Bouclé Dining Chairs, coffee tables on hospitality lounge sets, and sintered stone table tops paired with wicker frames. For these items the coordination questions are different but no less specific: what the slab base or paving below can carry, whether drainage falls run under the table zone, how the piece reaches a terrace or pool deck, and whether it will be uncovered through the wet season. Confirm the exposure conditions and the fixing detail with us before ordering, so the top, its frame and its support are specified together.
Handover Pack and After-care
A handover is more useful when it is a document set than when it is a conversation. For each stone or marble surface we record the confirmed dimensions, selected material and finish, fixing method, and the reference needed to order a matching spare later. That matters most on multi-unit projects, where a replacement panel ordered two years afterwards has to match a batch already in the building.
Cleaning and sealing guidance follows the chosen material and finish rather than a general rule, because a honed face and a polished face do not behave the same way. Ask for the guidance that applies to your configuration at handover, and keep it with the snag list.
Coordination Checklist
- Measurement released only after wall build-up, waterproofing and finished floor levels are complete
- Sanitaryware, mixers and drainage positions fixed before cut-outs are drawn
- Material, finish and edge profile approved from a physical sample
- Setting-out drawing signed for all cladding, panels and feature walls
- Incoterms, freight mode and import responsibilities agreed in writing
- Delivery date matched to room completion, not to production convenience
- Site access route measured; storage area confirmed dry and level
- Split of preparation work versus installation work recorded before delivery
- Snag list photographed and signed at handover; spare references logged
Santerson Stone & Marble Surfaces and Stone & Marble Panels are made to project dimensions, and delivery and installation planning start at the same time as the specification. As a one-stop furniture and building materials supplier working on villa, hotel and apartment projects, we handle design coordination, production, freight and on-site fitting as one package, so the stone arrives when the room is ready for it.
Send us your drawings, the selected sanitaryware schedule and the site programme, and we will return a measurement checklist, a production lead time and a delivery plan you can build the site programme around. Enquiries: Contact Us.