A tall wall-hung basin looks decisive on a render and awkward on site if the drawings never caught up with the wall. The Wall Hung Ceramic Basin 1050WC, Luxury Gold Line Wall Mount Sink is one of those products that rewards early coordination: its vertical silhouette, gold line accent and back-panel fixing all sit inside the wall build-up, so dimension lines, waste positions and finish schedules have to agree before the first sheet of plasterboard goes up. The notes below follow the order that works on bathroom fit-outs — draw it, check it against the real wall, then lock the schedule.
What the 1050WC brings to a feature bathroom
The 1050WC is a tall, slim vitreous ceramic basin fixed to the wall through a reinforcing back panel. Because the body runs down to the floor line without occupying it, the basin reads as a piece of loose furniture while leaving the floor clear for cleaning. A pre-drilled faucet hole keeps tap fitting simple, and the glaze is formulated to resist staining, yellowing and mineral deposits, which matters in guest bathrooms that are cleaned daily by housekeeping rather than by an owner.
Two points shape everything downstream. First, this is a wall-mounted unit: the load path goes through the back panel into the wall behind it, so the substrate has to be designed, not assumed. Second, the basin belongs to a matched 1050 collection — Wall Hung Ceramic Basin 1050WB, Freestanding Pedestal Basin 1050B and Washdown One Piece Toilet 1050A share the same gold line detailing, so a single finish decision carries across several rooms.
Reading the product dimensions against your drawings
The published size for the 1050WC is 410 mm wide by 340 mm deep by 620 mm high. On a drawing, that height is what makes the piece unusual: the basin does not sit at conventional counter height with a vanity underneath, it stands as its own element. Transfer three numbers to the reflected ceiling and elevation plans rather than one:
- Plan position — centre line from the nearest finished corner, plus the clear projection from the finished wall face.
- Rim height — the top of the basin relative to the finished floor level, which drives tap reach and mirror height.
- Clear zone — elbow room either side, so the tall body does not crowd a door swing, a shower screen or a towel rail.
Take the finished floor level as the datum and say so on the sheet. A 620 mm-tall basin set out from a structural slab rather than a finished floor ends up too high or too low once screed and tile are accounted for.
Setting out waste, supply and fixing points before the wall closes
Wall-hung ceramics fail on site for one of two reasons: the reinforcement is not where the bracket needs it, or the waste outlet misses the stud cavity. Before the wall is closed, mark on the framing drawing:
- The fixing zone behind the back panel, and whether that zone lands on timber studs, steel studs or masonry.
- Cold and hot supply positions relative to the pre-drilled faucet hole, so exposed tails line up with the ceramic rather than sitting beside it.
- The waste entry into the wall and its fall, checked against the wet area's floor falls and the nearest stack.
Where a stud cavity cannot take the load as drawn, the usual fix is additional noggins or a solid timber backing plate set to the exact bracket centres — cheap at framing stage, disruptive after tiling. For the 1050WC specifically, confirm the trap arrangement and rough-in with the current technical sheet for the project; the published page lists size and wall-fixed back-panel construction, while plumbing interface details should come from the data sheet you receive with the quotation.
Matching tiles, mirrors and lighting to a tall basin
A vertical basin changes the composition of the whole wall. Tile set-out should run off the basin centre line, not the room centre, otherwise the gold line accent ends up off-centre behind a mirror. Then coordinate upward:
- Mirror or cabinet — with the 1050WC there is no vanity to align to, so the mirror height follows the rim level and the user's sight line. A Santerson LED Mirror Cabinet specified for the project can be made to the opening you draw, including its lighting and electrical specification.
- Task light — Vanity Lighting on the mirror face beats a single ceiling fitting for shaving and grooming, since the tall basin body throws shadow across the lower face.
- Storage — with no cabinet below, plan recessed niches or a nearby tall unit early; see the Santerson Floating Vanity range where an adjacent bathroom needs concealed storage instead.
These are configurable items rather than fixed catalogue sizes: made-to-measure sizing, material and finish options and project-tailored layouts are specified per space, which is exactly what lets them be drawn to suit the basin rather than the other way around.
Keeping the gold line consistent across a suite of bathrooms
On villas and boutique hotels the 1050 collection usually appears in more than one bathroom, and that is where schedules earn their keep. Build a single fixture schedule that names each model by code — 1050WC for the feature guest powder room, 1050WB where a shorter trapezoid basin suits a tighter wall, 1050B where a freestanding pedestal works against a freestanding bath, 1050A for the WC — and record for each one the room, wall construction, rough-in variant and finish. Repeating the model code in the door schedule, tiling layout and electrical drawing is what stops the guest bathroom arriving with mixed metal tones.
Where a project needs the same look carried into other trades — joinery, wall panels, flooring, lighting — ordering the ceramics alongside Bathroom Fixtures for Hotel Projects and the rest of the fit-out from one supplier keeps finishes, packaging and delivery windows on one document trail.
A pre-order checklist for procurement teams
- Elevations signed off with basin centre line, rim height and clear zones dimensioned from finished floor level.
- Wall build-up detail showing reinforcement behind the back panel, agreed with the framer or builder.
- Waste and supply positions drawn on the same sheet as the ceramic, not a separate plumbing sketch.
- Fixture schedule naming each 1050 model per room, with rough-in variant recorded.
- Mirror, lighting and niche positions dimensioned from the basin, confirmed before tiling.
- Current technical sheet on file for every model, cross-checked against the order at purchase.
How a one-stop supplier shortens this loop
Coordination stalls when drawings pass between a ceramic supplier, a joiner, a lighting supplier and a freight forwarder who never speak. Working with a One-stop Furniture and Building Materials Supplier means the same team that quotes the basin also holds the joinery, wall finishes and lighting schedules, so a change to one bathroom shows up once rather than four times. From there, Interior Design Services cover space planning, furniture layouts and 3D renderings plus production coordination and on-site guidance; Custom Furniture Design and Prototyping covers bespoke sizes and finishes where a standard model does not fit the wall you have; and Furniture Logistics and Door-to-door Delivery handles freight by sea, air and rail with the paperwork, while Furniture Installation and After-sales Support covers fitting and snags on handover.
If your drawings are already in tender, send the bathroom elevations together with the fixture schedule and the set-out for the 1050WC — reinforcement, waste position and clearances — can be marked up against them before anything is cut. See the Wall Hung Ceramic Basin 1050WC product page for the current specification, and the Project Cases pages for bathroom work delivered on villa and hospitality projects.