A swim spa on a hotel site has to work harder than one in a private villa. Guests expect it to be available early in the morning and late at night, housekeeping and engineering want it simple to maintain, and the project team wants it delivered alongside everything else in the fit-out. Outdoor Swim Spa WS-S04B is a compact acrylic-shell unit from our outdoor swim and hydrotherapy range that suits this kind of hospitality duty, particularly where the pool deck, terrace or rooftop plant area is tight. The notes below explain how we specify it for hotel projects and what to check before you commit the line item in your FF&E schedule.

Where a 3.9-metre footprint earns its place

The catalog envelope for WS-S04B is 3900 × 2200 × 1450 mm, so the shell occupies roughly 8.6 square metres of deck. That is the practical reason buyers shortlist this model: it fits between a row of sun loungers and a glass balustrade, or into a setback on an upper terrace, without forcing a redesign of the surrounding paving grid. The 1450 mm shell depth also gives a usable water depth for standing hydrotherapy while keeping the coping height approachable for guests of all ages.

Compare that envelope with two close variants in the same family. Outdoor Swim Spa WS-S04 runs 4090 × 2200 × 1110 mm with a shallower shell and an added waterfall feature. Outdoor Swim Spa WS-S04X measures 3990 × 2260 × 950 mm and carries a much larger jet count at 85. If your brief calls for a seated massage pool rather than a deeper swim-and-soak unit, the X variant is usually the better conversation; if it calls for a waterfall as a visual feature in a courtyard, WS-S04 tends to be specified instead.

Outdoor Swim Spa WS-S04B for hotel fit-out

Outdoor Swim Spa WS-S04B, catalog dimensions 3900 × 2200 × 1450 mm.

What the published specification actually covers

For a procurement file, it is worth separating what the catalog lists as standard from what gets confirmed per configuration. The site-listed figures for WS-S04B are:

ModelWS-S04B
Catalog dimensions3900 × 2200 × 1450 mm
Control system1 set
Water pump3 pcs
Filter pump1 pc
Jet total31 pcs, including 6 water columns
LED lighting2 pcs plus 28 small LED lights
Total power10.35 kW (catalog figure)
Features shownWater jets, LED lighting, Ozone

Three of those lines matter more than they look on a spec sheet. The 10.35 kW total power figure is the catalog number for the listed equipment set — it is not a statement about your supply. A hotel electrical engineer still needs to confirm the circuit, protection device and cable run against the exact configuration you order, because adding a heat pump or UV sterilisation changes the load. The three water pumps plus one filter pump tell you there is separate circulation for jet performance and for filtration, which is what lets the jets run while the filtration cycle continues on its own timer. Ozone is listed as a feature, meaning sanitisation support rather than a replacement for your normal dosing regime; the water treatment plan should still be agreed with whoever maintains the pool plant.

A swim training system is not listed for WS-S04B in our catalog record. If the hotel is marketing lap swimming or counter-current training, we confirm that equipment and its placement in writing before production rather than assuming it comes with the shell.

Options that change the price line

Catalog-listed options for this range include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so treat the option list as a starting point for a quotation, not as a fixed menu. For hotel duty we usually steer projects toward four of them:

  • Heat pump. Year-round water temperature is the single biggest driver of guest usage on a spa deck, and it also determines the running cost you will report to the operator.
  • Insulation. Relevant wherever the unit sits in a temperate or cool climate, or where the plant room shares a wall with guest rooms and thermal performance affects both energy use and noise.
  • Steps. Access into a 1450 mm shell needs to be safe for older guests and children; moulded steps are usually specified rather than left to site detailing.
  • Sand filtration or upgraded filtration. Chosen against expected bather load, which the operator should estimate from room count and occupancy pattern.

Site conditions to settle before you order

  • Structural support. A filled acrylic shell of this size is a heavy point load. On a terrace or podium deck the structural engineer must approve the position and any transfer slab; on ground level, confirm a properly compacted and level base.
  • Plant access. Pumps, filtration and controls need reachable service points. Build the access panel into the paving detail now, not after tiling.
  • Drainage and overflow. Confirm the deck drain route, plus where commissioning water and any emergency drainage will go.
  • Electrical route and isolation. Run the supply from the distribution board with the confirmed configuration load, with local isolation accessible to engineering staff.
  • Delivery path and lifting. The shell travels as a complete unit. Check gate widths, lift capacity and crane or forklift access on site before the delivery date is booked.
  • Companion furniture. Loungers, side tables and shade around the spa deck should be specified in matching materials so the whole area weathers and ages consistently.

Our outdoor furniture range covers that last point — aluminium frames, rope weave, wicker and teak-look tops in dining, lounge and lounger sets that sit on the same deck as the spa.

Buying it inside a hotel project rather than as a standalone item

Most of our hospitality work comes through turnkey solutions, where the spa, the outdoor furniture, the bathroom ceramics, lighting, cabinetry and floor and wall finishes are coordinated by one supplier. That coordination is where a swim spa normally causes trouble if it is bought separately: the electrical load has to appear in the same drawings as everything else, the delivery window has to line up with the paving trades, and the access detail has to match the finish build-up. Ordering through one scope removes the argument about who owns those interfaces.

Where a project needs something other than a catalog shell — an irregular terrace, a curved edge, or a spa set into a raised platform — our customizable shape outdoor spa covers square, round, oval and curved configurations in an acrylic shell with structural reinforcement. The same route applies to swim spas and pools generally: send the deck drawing, and we confirm which model or custom build fits it.

A short procurement sequence

  • Brief and layout. Send the terrace or deck drawing, room count, and whether the operator expects year-round use. We return a model recommendation with the option list priced.
  • Quotation and detail confirmation. Configuration, included equipment, total load, insulation and steps are fixed here, in writing, against your specification.
  • Production and shipment. Freight is arranged by sea, air or rail with the shipping paperwork handled on our side, and door-to-door delivery to site.
  • Installation and handover. On-site installation support, inspection of snags, spare parts and ongoing maintenance are part of the service scope, so the operator receives a working plant with documentation rather than a shell on a slab.

Send your deck dimensions and target configuration through our contact page and we will confirm WS-S04B or an alternative model against your drawings, including the equipment list and load for your engineer.