A freestanding pedestal basin looks simple on a mood board and complicated on a purchase order. When an enquiry arrives for the Freestanding Pedestal Basin 1003S, Modern Round Ceramic Stand Basin for Bathroom, the projects that move fastest are the ones where the buyer has already settled three things: how many rooms, what is behind the wall, and who signs off on the finish. Below is the checklist we work from, so your first message can carry everything needed for a real quotation rather than a third round of clarifying emails.

Quantity and room mix come before anything else

Give us the number of basins per room type. Ten pieces spread across villa guest bathrooms behaves differently in production and packing from ten pieces for a single boutique washroom. Tell us whether the same model repeats through every bathroom or whether you are mixing sizes by room: the 1003S carries a round, tapered silhouette, while Freestanding Ceramic Pedestal Basin 1004S is a compact square unit and Freestanding Pedestal Basin 1051S has a softer rounded outline. Mixing shapes across floors is normal, but we need the split per model before we quote.

Also state the room context: residential villa, serviced apartment, boutique hotel guest washroom or public commercial restroom. Public restrooms are cleaned and used far more often than a master bathroom, and that changes what you will want from the faucet and the fixing detail rather than the basin itself.

Wall, waste and water: the technical data we ask for

This is where most delays come from. For a stand basin of this type please send:

  • Finish floor level. Overall height and the position of the waste connection are measured from the finished floor, not the structural slab. Say which one your drawings use.
  • Waste outlet type and position. Confirm whether the waste exits through the wall or the floor, and give the centre distance from the finished wall.
  • Wall construction at the fixing point. The basin is secured to the wall through its back panel, so we need to know whether that wall is masonry, stud framing with noggin/blocking, or a lightweight partition, and whether it will be tiled or rendered.
  • Water supply layout. Single lever or mixer faucet, hot and cold centre spacing, and whether the supply lines are concealed or exposed.
  • Tap hole requirement. The basin is supplied with a pre-reserved tap hole for a single faucet; if your design calls for a deck-mounted mixer or a wall-mounted spout, flag that in the first message.

Send the dimensioned bathroom layout or the plumbing setting-out drawing if you have one. If you do not, send a room photograph and the rough-in sketch from your plumber — a rough sketch beats an assumption, and we confirm the fit against our technical data sheet before production.

Matching the rest of the sanitary suite

A single basin rarely stays alone in a schedule. Tell us whether the same bathroom also needs a WC or a bidet, because specifying them as one series keeps the ceramic tone and profile consistent across the room. The 1003S sits within a wider sanitary range: pair it with the wall-hung Wall Hung Ceramic Basin 1003B where a vanity-free wall-mounted sink is needed instead, and complete the set with matching WCs such as the Two Piece Washdown Toilet 1038A, which offers both floor and wall outlet options. Where a project mixes a feature basin in the master bathroom with wall-hung units in the shared rooms, we can group the whole set into one shipment so the glaze and profile match.

If your scheme calls for something more decorative, say so early. The Freestanding Pedestal Basin 1050B, Luxury Gold Line Ceramic Stand Basin covers projects that want a metallic accent line rather than the plain white body of the 1003S.

Finish, material and quality expectations in writing

State the glaze colour you expect — usually gloss white for this range — and whether every piece on the order must come from one production batch. Batch consistency matters most when basins are installed side by side in a row of hotel rooms. The 1003S is made from vitreous ceramic with a dense high-gloss glaze intended to resist water staining, limescale and discolouration over long-term use; if your specification names particular surface or performance tests, send the clause text and we will confirm what our current documentation supports rather than assume it.

Commercial details that complete a quotation

  • Destination and delivery terms. Project address, port of discharge, and whether you want door-to-door delivery or will arrange your own freight. As a one-stop furniture and building materials supplier we handle container loading and shipping paperwork for combined orders, but the Incoterms you prefer should be in the first email.
  • Consolidation with other trades. Tell us if the same container should also carry cabinetry, lighting, flooring or wall finishes from the same project. Bathroom ceramics travel well alongside other fit-out items, and consolidating saves handling damage as well as freight cost.
  • Packaging requirement. State whether you need standard export cartons, palletised loads for container consolidation, or cartons labelled by room number so the site team can distribute them floor by floor.
  • Required date and installation sequence. Give the on-site installation date rather than only an order date, and note whether basins are needed in phases — shell core first, then guest rooms.
  • Approval process. Confirm who signs off: architect, contractor or client. If a physical sample is required before the main order, request it in the enquiry so we can arrange it alongside the quotation.

A short example of an enquiry that is easy to price

"Twenty-four freestanding stand basins for a 24-room boutique hotel, model 1003S, gloss white, supplied from one production batch. Finished floor level set out on the attached drawing; wall waste, centre distance noted on the setting-out plan; masonry wall to be tiled to 1200 mm high. Single lever pillar tap, hot and cold concealed in the wall. Delivery to Melbourne with door-to-door freight, consolidated with the guest-room vanity lighting. Installation begins in month six of the programme; please quote a sample piece before the main order."

That message contains quantity, room type, model, finish, rough-in geometry, wall build-up, faucet intention, delivery terms and programme. With it we can confirm fit against the technical data sheet, price production and packing, and flag anything that needs your plumber's agreement before a single piece is made.

If you are specifying this basin for a villa or hospitality project, send us the room schedule and the plumbing setting-out drawing together with your delivery terms, and we will come back with a quotation built on your actual site conditions rather than a generic price list.