A wall-hung basin that carries a gold line detail is not a catalogue item you can order on size alone. Before SANTERSON puts Wall Hung Ceramic Basin 1050WC, Luxury Gold Line Wall Mount Sink into production for a hotel, villa or apartment package, the buyer and the factory need to agree on the same set of numbers: how the basin sits on the wall, where the waste leaves it, which tap is going into the pre-drilled hole, and how the piece travels to site. Below is the confirmation list we work through with project purchasers, in the order it usually comes up.

Start from the wall, not the basin

Model 1050WC is a tall wall-hung basin with a vertical slim body and a gold line accent. Its listed size is 410×340×620 mm and it is fixed to the wall with back panel reinforcement, which means the substrate behind it has to be prepared before tiling, not after. Send us the wall build-up (brick, block, stud with backing, or reinforced plasterboard) and the finished floor-to-finished-floor height of the room, so the fixing positions and the rim height can be set against the tall silhouette rather than adjusted on site.

Because the basin keeps the floor clear, it is often specified for villa feature bathrooms and boutique hotel guest rooms where the cleaner has to work underneath it. That only works if the waste and supply lines are chased into the wall at the right heights, so plumbing positions should be issued together with the basin drawing, not after it.

Confirm the rough-in and trap arrangement in writing

For ceramic ware, most on-site problems trace back to an unconfirmed rough-in. For 1050WC we ask for a marked-up dimension drawing before production: waste outlet centre from finished floor and from finished wall, supply inlet centres, the trap type (S-trap or P-trap), and whether any shut-off valves sit behind the basin. The site listing gives overall size; it does not fix the trap geometry for your building, so we treat that as a project-specific value and confirm it against the technical sheet for the batch being made.

Practical point: rough-in conventions differ between markets and even between floors of the same building. If your drawings show a floor drain rather than a wall drain, tell us before tooling and glazing start — changing it afterwards means either exposed pipework or a second order.

Faucet hole, tap height and the gold line

The 1050WC basin comes with a pre-drilled faucet hole for straightforward fitting. Confirm before production whether you are using a single lever pillar tap or a wall-mounted spout, the spout reach, and where the tap sits relative to the gold line decoration. On a tall basin with a slim body, an over-long spout splashes onto the accent band, and a low-set tap crowds the bowl.

The gold line is a decorative finish, so it should be shown on the approval sample rather than described in an email. We produce a first article for sign-off: glaze colour, gloss level, position of the line, and the faucet hole. Once that sample is approved, it becomes the reference for the rest of the order.

Decide the scope: single basin or the 1050 matched set

1050WC belongs to a matched sanitary collection. Ordering the whole set at once keeps glaze tone, gold detailing and profile consistent across a guest-room floor or a villa's bathrooms:

ItemListed size (mm)Where it is typically used
Wall Hung Ceramic Basin 1050WC410×340×620, wall fixed with back panelFeature bathroom, guest powder room
Wall Hung Ceramic Basin 1050WB495×440×390, trapezoid wall-hung formSecondary bathroom, compact en-suite
Freestanding Pedestal Basin 1050B460×360×850, secured by back panelVilla master bathroom, hotel restroom
Washdown One Piece Toilet 1050A680×360×780, P-trap 180 mm and S-trap 250 mm rough-in optionsGuest rooms, high-end washrooms

Sizes above are the figures published on the product pages. Trap and rough-in values for your order are set from the current technical sheet and your drawings, and we recommend re-confirming them at purchase-order stage.

Quantity, spares and how the order is split

  • Order quantity and batch: ceramic firings vary slightly in tone, so a guest-room floor should ideally come from one production run.
  • Spare sets: hotels normally hold spares for replacement during operation. Decide now, while the same batch is running, rather than reordering later.
  • Split delivery: if bathrooms are being handed over in phases, we can plan production and shipment around that sequence under our Custom & OEM Service.
  • Packaging: wall-hung ceramic with a decorative line needs crating matched to the handling route you have on site.

Logistics and handover, agreed before production starts

Ceramic ware is heavy, breakable and usually the last thing to arrive on a fit-out. Our Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork, container loading and tracking, so the delivery terms should be fixed while the order is still being confirmed: Incoterms, destination port or site, who handles clearance, and where the crates are stored on arrival. Then Installation & After-sales Support covers fitting, inspection and snag lists, which for a wall-hung basin means checking the back-panel fixing, sealing and waste connection against the approved drawing.

If the basins are part of a wider fit-out, it is worth ordering them alongside the other wet-area items — vanity units, shower sets and vanity lighting — so tap reach, mirror height and lighting position are resolved in one coordination round instead of three. The full bathroom sanitary fixtures range is supplied under the same project programme, and as a hotel furniture and fit-out supplier SANTERSON coordinates them with the joinery, lighting and finishes around them.

Sign-off checklist before we open the mould

  • Wall build-up and finished floor levels received; fixing method agreed for 1050WC.
  • Waste outlet and supply positions dimensioned on a drawing, trap type stated.
  • Tap type, spout reach and position relative to the gold line confirmed.
  • Approval sample of glaze, gloss and gold-line position signed off.
  • Quantity, spare allowance and any phased delivery schedule on the purchase order.
  • Incoterms, destination, packaging standard and inspection point agreed.

Send us the drawings and the room elevations and we will return a dimensioned proposal for 1050WC against your bathroom layout. Confirming these six items before production is what keeps a feature basin on the wall, level, sealed and matching the rest of the set.

SANTERSON manufactures and supplies furniture and building materials for villa, hospitality and office projects, with custom/OEM production, logistics and installation support. Contact PHILLIP, phone / WhatsApp +86-13928214007, email santerson@qq.com, or use the contact page to send your drawings and enquiry.