A swim spa on a hotel rooftop terrace or pool deck is a compact way to add wellness capacity without the footprint of a full pool. But it is also a piece of powered, plumbed equipment that has to pass through procurement, site services and handover like any other fixed fixture. This guide walks through how a specifier or buyer evaluates the Outdoor Swim Spa WS-SP500-MS during a hotel fit-out, using only the figures published on the product page and flagging what must be confirmed with the factory before an order is placed.

Where a 5-metre swim spa fits in a hotel programme

The WS-SP500-MS is listed at 5000 × 2500 × 1600 mm. That envelope suits locations where a conventional pool is out of the question: a setback from the building line, a podium deck, an outdoor gym terrace, a spa garden, or a resort villa cluster where one shared unit serves several keys. The single swim-training station means the unit works as a lap and fitness facility plus a hydrotherapy seat at the same time, rather than as a large swimming pool for many guests.

In a fit-out programme, treat it as a fixed item on the FF&E or services schedule, not as loose furniture. Its position on the deck drives structural loading, drainage, plant access and electrical routing, so it should be frozen at the same design freeze as the rest of the wet areas.

Reading the published specification

The product page lists the following configuration. Use it as the starting point for a comparison sheet with other models in the range, and record any deviation your project requires in writing on the quotation.

ItemAs published for WS-SP500-MS
ModelWS-SP500-MS
Catalog dimensions5000 × 2500 × 1600 mm
Control system1 set
Swim training system1 set
Water pump1 pc
Filter pump1 pc
Jet total29 pcs
LED lights4 pcs
Total power11.55 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Two numbers carry most of the coordination load. The 29 jets and single swim-training set define the kind of session the unit supports. Occupancy for a shared facility is something to settle with your operator against the deck rules, not something the specification states. The total power figure of 11.55 kW, as published, is the number your electrical engineer designs the supply, protection and cable sizing around — and it changes with the options you select, so it must be re-confirmed against the final configuration rather than taken from the catalogue.

Options that change price, plant and services

The catalogue lists optional accessories for this range: control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each has a knock-on effect in a hotel project:

  • Heat pump — determines whether the unit can hold a usable water temperature through shoulder season, and adds to the connected load and the noise profile near guest windows.
  • UV sterilization and ozone — affect the chemical regime housekeeping runs day to day; agree the maintenance routine in the handover documentation.
  • Sand filtration — needs plant space, a drain connection and periodic backwash disposal.
  • Insulation and steps — insulation matters for running cost on an exposed deck; steps matter for accessibility and for how the finished deck level meets the shell.

Availability and compatibility of these options vary by model, so confirm each line item for the WS-SP500-MS specifically before you price it.

Site conditions to settle before ordering

  • Structure and access — confirm the deck or slab loading, and confirm the delivery route: a 5 m shell has to fit through gates, lifts or a crane pick.
  • Electrical supply — hand the confirmed total power and the control system arrangement to the electrical engineer early; the published figure is a catalogue value, not your project's final load.
  • Drainage and water supply — fill, drain and backwash points need to be set out before the deck finish goes down.
  • Finishes around the shell — the coping, decking edge and any enclosure detail should be drawn together with the surrounding paving, lighting and Outdoor Furniture for Villas and Resorts so the installation looks designed rather than dropped in.
  • Operational handover — agree spare parts, warranty terms and the maintenance schedule with the supplier before practical completion, so the facilities team inherits a documented system.

Comparing it against adjacent models

The same family includes the Outdoor Swim Spa WS-SP500, at the same 5000 × 2500 × 1600 mm envelope but with a lighter jet package and a lower published total power. If your programme needs hydrotherapy volume rather than a full massage station, that variant is worth pricing side by side. Where the deck allows more length, the Outdoor Swim Spa WS-SP600-MS steps up to 5900 × 2500 × 1600 mm with a comparable equipment set. Put all three on one comparison sheet against the same option list, otherwise the headline price hides what is actually included.

Figures above are transcribed from the manufacturer's published product page for this model and describe a catalogue configuration. Included equipment, total power and electrical requirements change with the selected options and must be confirmed in writing for your specific order before any structural or electrical design is signed off.

How SANTERSON supplies it on a hotel project

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials for hospitality, villa and office projects, operating since 2008. A swim spa rarely arrives alone on a hotel job: poolside loungers, cabana daybeds, pergolas and outdoor dining and lounge sets, wall panels, lighting and bathroom fixtures for hotel projects all sit in the same package. Coordinating them through one supplier means one set of drawings, one production schedule and one container plan instead of a dozen separate purchase orders that land on different dates.

The service scope covers design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then logistics by sea, air or rail with customs paperwork through to door-to-door delivery, followed by installation support and after-sales service. For a swim spa specifically, that means the unit can be scheduled together with the deck finishes and poolside furniture so the whole outdoor area is delivered in one coordinated shipment.

Send the model reference, your selected option list and the site drawings to the contact page for a configuration-specific quotation. Phone and WhatsApp +86-13928214007, email santerson@qq.com. Enquiries are answered within 24 hours during business hours, Monday to Saturday, 8:00 AM–6:00 PM (GMT+8).